Control plan dates - What are they and what are they for?
This is the best dumb blonde question I have EVER posted on here. Can someone pleeeease tell me what every date is for on the AIAG control plan?
I thank you.
|

11th January 2000, 04:52 AM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Karma Power: 605
|
|
What do you mean by 'every date'?
|

12th January 2000, 06:36 PM
|
|
E-Mails Invalid or Rejected
Registration Date: Sep 1998
Location: St. Marys, PA
|
|
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0 Karma: 40 
|
|
|
I posted this when I didn't have everything in front of me, and I still don't, but I was asked what all the dates are for on the contol plan and I didn't have an answer. Sorry. I will review it again tomorrow at work so I know what I'm talking about.
Thanks for the reply, Dawn
|

12th January 2000, 10:40 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Karma Power: 605
|
|
Looking at the APQP book - there is a control plan 'blank' which has several dates:
Date (Orig.) - The date of the original document.
Date (Rev.) - The most recent revision date.
Supplier/Plant Approval Date - The date your company approves the document.
There are 4 others with If Required noted - These are:
Customer Engineering Approval/Date (If Required)
Customer Quality Approval/Date (If Required)
Your customer should tell you whether either of these is required. Typically one or the other is required.
Other Approval/Date (twice)
These If Required dates are typically not used.
|

15th January 2000, 07:56 PM
|
|
E-Mails Invalid or Rejected
Registration Date: Sep 1998
Location: St. Marys, PA
|
|
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0 Karma: 40 
|
|
|
Thanks,
You straightened me out again.
|

16th January 2000, 06:59 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Karma Power: 605
|
|
That will be 5 cents, please!
|

17th January 2000, 09:48 PM
|
|
E-Mails Invalid or Rejected
Registration Date: Sep 1998
Location: St. Marys, PA
|
|
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0 Karma: 40 
|
|
|
You're too easy
|

22nd January 2009, 12:10 PM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Sep 2006
Location: Auburn Hills, Mi., US
|
|
Posts: 2
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 14 Karma: 10 
|
|
Re: Control plan dates - What are they and what are they for?
Hello Marc,
I also have a question related the the Control Plan date, you seem to be the man with the answers : )
I need to submit a new PPAP pkg. to include a change to revision and date of the design records. The new rev and date will show on the Control Plan (Flow diagram, etc) but does the Control Plan itself need to change revisions?
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|