The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 19th June 2000, 10:32 PM
Dawn Dawn is offline
E-Mails Invalid or Rejected

Registration Date: Sep 1998
Location: St. Marys, PA
 
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 40
Dawn has less than 100 Karma points so far.
Please Help! Updating Flow Diagrams - Internal Critical Characteristic Identified

I am looking for something stated in QS pertaining to updating flow diagrams, and I'm not finding anything as far as:
Do we need to update flow diagrams when we determine an internal critical characteristic on a certain operation. Currently, we have a process where we have deemed a certain operation as critical. We have designated it as critical on the fmea, control plan, work instructions but not on the flow diagram. When I asked the QA Engineer why, she stated she never updates the flow diagram for these types of changes. I searched the PPAP manual, and QS book, but found nothing. Any help?
Reply With Quote

Sponsored Links
  #2  
Old 20th June 2000, 11:05 AM
Brian Dowsett
Unregistered Guest

 
Posts: n/a
Dawn,
My 0.5 Euros worth is that process flow diagrams must by definition show every step of the process. It's by cross referencing from the control plan to a numbered step that we identify that step as critical. I've never seen anything in QS to suggest that process flow diagrams themselves need to show which steps are critical. Even the process flow checklist in APQP manual appendix does not mention highlighting critical steps.

Cheers

brian
Reply With Quote
Sponsored Links

  #3  
Old 24th June 2000, 05:34 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11564
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

If you use GM's format, each characteristic in the flow diagram is on the control plan so if you ad a characteristic to the CP you have to add it to the associated process on the flow diagra. However, different companies use different formats so some flow diagrams may not have that detail. See the APQP pdf file in the pdf_files directory.
Reply With Quote
  #4  
Old 7th September 2007, 04:24 PM
jpandullo jpandullo is offline
Inactive Registered Visitor

Registration Date: Feb 2007
Location: Kersey, Pennsylvania
Age: 46
 
Posts: 5
Thanks Given to Others: 1
Thanked 0 Times in 0 Posts
Karma Power: 12
Karma: 10
jpandullo has less than 100 Karma points so far.
Default Re: Updating Flow Diagrams - Internal Critical Characteristic Identified

How do you access the APQP pdf file? I can't seem to locate the link?
Reply With Quote
  #5  
Old 7th September 2007, 04:36 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,216
Thanks Given to Others: 755
Thanked 2,297 Times in 1,550 Posts
Karma Power: 612
Karma: 20400
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default Re: Updating Flow Diagrams - Internal Critical Characteristic Identified

Quote:
Originally Posted by jpandullo View Post

How do you access the APQP pdf file? I can't seem to locate the link?
You're responding to a seven-year-old post, so I can't be sure what Marc was referring to, but go up to the top of the of the page and click on More Free Files, and then APQP Information in the second column. That's probably it. You can also search post attachments by clicking on Post Attachments List at the top of the page.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Your Critical Characteristic is my Minor Concern - Characteristic out of Spec Poohbear Inspection and Test, Sampling and Related Topics 3 19th July 2007 08:01 PM
Toyota (Critical?) Characteristic Symbols RMedrano SPC Monitoring and Statistical Analysis Techniques 7 22nd January 2007 08:43 AM
Tensile made critical characteristic, but Cpk? High rate of rejection in a part Salman Capability, Accuracy and Stability - Process, Machine, etc. 9 25th May 2006 08:45 PM
Classification column - PFMEA - Customer doesn't identify any critical characteristic Annette FMEA and Control Plans 16 25th May 2006 10:04 AM
Basic Need:Initial Capability Study:No critical characteristic on print larry hopperrath SPC Monitoring and Statistical Analysis Techniques 6 4th October 2004 11:21 PM



The time now is 09:41 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts