The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 1st March 2000, 12:19 PM
louie
Unregistered Guest

 
Posts: n/a
Let Me Help You Control Plan or FMEA - Which comes first?

The company I'm currently with begins their Control Plan prior to beginning their FMEA. After they identify critical characteristics on the CP, they do FMEAs on the critical characteristics. We have a new person at our company that says we CAN NOT start our Control Plans until our FMEAs are complete.

Why Not? Am I missing something?

Appreciate your comments.

Reply With Quote

Sponsored Links
  #2  
Old 1st March 2000, 02:35 PM
Spaceman Spiff's Avatar
Spaceman Spiff Spaceman Spiff is offline
Inactive Registered Visitor

Registration Date: Mar 1999
Location: FL
Age: 44
 
Posts: 73
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 45
Karma: 10
Spaceman Spiff has less than 100 Karma points so far.
I Say...

The sequence of events is: Design FMEA, Process FMEA, and then Control Plan. FMEAs determine what characteristics need to be controlled and the Control Plan describes how to control it. Ford's Dynamic Control Plan actually combines the PFMEA and the Control Plan.
Reply With Quote
Sponsored Links

  #3  
Old 1st March 2000, 03:20 PM
Sarang
Unregistered Guest

 
Posts: n/a
Red Face

I agree with Spaceman. I was really shocked when I first read the starter. I have been doing my FMEAs for the last couple of months and was listing down the critical characteristics so as to be included in the control plan and what I read was exactly the opposite of what I was doing.. I am not still sure about whether the sequence specified by Spaceman "DFMEA, PFMEA and control plan" is the right one, but as far as my knowledge goes, its FMEAs first and then the control plan. As described, come out with your process flow chart and diagrams, do FMEAs for all your processes and also your designs, identify the critical processes and then include these critical processes in your Control Plan to control them. Thats what the name suggests.
Any comments about this SENIORS???
Reply With Quote
  #4  
Old 1st March 2000, 03:26 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Igenerally start with a control plan - enter customer critical characteristics. Then DFMEA, then the Trilogy (PFMEA, CP and Process Flow.

Have you reviewed http://Elsmar.com/pdf_files/APQP_Q.pdf ?
Reply With Quote
  #5  
Old 1st March 2000, 03:29 PM
Sarang
Unregistered Guest

 
Posts: n/a
How do you identify the critical characteristics Marc? I already told the way I have planned to do it and have been doing it for the last two months. Am I going wrong? Is this not the best approach? Do you suggest me to change my approach and catch another path?
Reply With Quote
  #6  
Old 1st March 2000, 03:43 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Your control plan evolves. As I said, I start a control plan first and put customer defined critical characteristics on it. To get your critical characteristics you look at everything from industry standards on. Y9ou might machine a part and for that part to go in an assembly it may require a hole be placed within a certain area. It may be that area is critical, or it may not. You simply have to use your judgement and experience. There is no list you can go to.

I don't think the path is that critical. There is almost always overlap - as the DFMEA is being done quite often a PFMEA team (or person {reality, folks} is doing the Process FMEA. You have to understand the process, however. Sometimes there are DFMEA entries that are carried over to the PFMEA (not often, but it does happen from time to time).

I prefer to have a projected process flow diagram before starting the PFMEA as I believe you have a better idea of what to look at.

I wouldn't let the sequence bog you down. If you do the PFMEA before the DFMEA (which is very, very common - but I would say it is not the 'smartest way' to do it), it's a matter of reviewing the two together and checking to see if anything from the DFMEA should be added to the PFMEA.

If you review the APQP document I linked above and still have questions, come on back and ask more questions.

Gotta run. I'm leaving for Tampa in a couple of hours.
Reply With Quote
  #7  
Old 1st March 2000, 03:45 PM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
We always did PFD, PFMEA, then PCP. DFMEA was provided by design as the first document. In reality the PFMEA requires you identify "current process controls" so it was in all practicality a simultaneous activity. Alot depends on whether you are looking at an existing process or developing a new one.

Reply With Quote
  #8  
Old 2nd March 2000, 09:20 AM
Spaceman Spiff's Avatar
Spaceman Spiff Spaceman Spiff is offline
Inactive Registered Visitor

Registration Date: Mar 1999
Location: FL
Age: 44
 
Posts: 73
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 45
Karma: 10
Spaceman Spiff has less than 100 Karma points so far.
I Say...

Marc, it's not often I disagree with you... the customer's critical characteristics should be the "Input" in Phase 1 of APQP. Those characteristics are part of the design consideration, thus included in the Design FMEA.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Retroactive FMEA and Control plan - is this a common thing? ScottK FMEA and Control Plans 12 2nd July 2009 11:02 AM
The relationship between the FMEA and Control Plan dvd101 FMEA and Control Plans 4 26th November 2008 10:30 PM
Control Plan and FMEA (non automotive) Euphoric FMEA and Control Plans 9 8th July 2008 09:30 AM
Short FMEA and Control Plan - What am I doing wrong? apestate FMEA and Control Plans 5 24th February 2004 03:33 PM
Control Plan and Design FMEA (DFMEA) Links sima FMEA and Control Plans 4 12th June 2001 05:05 AM



The time now is 02:47 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts