1st March 2000, 12:19 PM
|
|
|
Control Plan or FMEA - Which comes first?
The company I'm currently with begins their Control Plan prior to beginning their FMEA. After they identify critical characteristics on the CP, they do FMEAs on the critical characteristics. We have a new person at our company that says we CAN NOT start our Control Plans until our FMEAs are complete.
Why Not? Am I missing something?
Appreciate your comments.
|

1st March 2000, 02:35 PM
|
 |
Inactive Registered Visitor
Registration Date: Mar 1999
Location: FL
Age: 44
|
|
Posts: 73
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 45 Karma: 10 
|
|
The sequence of events is: Design FMEA, Process FMEA, and then Control Plan. FMEAs determine what characteristics need to be controlled and the Control Plan describes how to control it. Ford's Dynamic Control Plan actually combines the PFMEA and the Control Plan.
|

1st March 2000, 03:20 PM
|
|
|
I agree with Spaceman. I was really shocked when I first read the starter. I have been doing my FMEAs for the last couple of months and was listing down the critical characteristics so as to be included in the control plan and what I read was exactly the opposite of what I was doing.. I am not still sure about whether the sequence specified by Spaceman "DFMEA, PFMEA and control plan" is the right one, but as far as my knowledge goes, its FMEAs first and then the control plan. As described, come out with your process flow chart and diagrams, do FMEAs for all your processes and also your designs, identify the critical processes and then include these critical processes in your Control Plan to control them. Thats what the name suggests.
Any comments about this SENIORS???
|

1st March 2000, 03:26 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Karma Power: 605
|
|
Igenerally start with a control plan - enter customer critical characteristics. Then DFMEA, then the Trilogy (PFMEA, CP and Process Flow.
Have you reviewed http://Elsmar.com/pdf_files/APQP_Q.pdf ?
|

1st March 2000, 03:29 PM
|
|
|
|
How do you identify the critical characteristics Marc? I already told the way I have planned to do it and have been doing it for the last two months. Am I going wrong? Is this not the best approach? Do you suggest me to change my approach and catch another path?
|

1st March 2000, 03:43 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Karma Power: 605
|
|
Your control plan evolves. As I said, I start a control plan first and put customer defined critical characteristics on it. To get your critical characteristics you look at everything from industry standards on. Y9ou might machine a part and for that part to go in an assembly it may require a hole be placed within a certain area. It may be that area is critical, or it may not. You simply have to use your judgement and experience. There is no list you can go to.
I don't think the path is that critical. There is almost always overlap - as the DFMEA is being done quite often a PFMEA team (or person {reality, folks} is doing the Process FMEA. You have to understand the process, however. Sometimes there are DFMEA entries that are carried over to the PFMEA (not often, but it does happen from time to time).
I prefer to have a projected process flow diagram before starting the PFMEA as I believe you have a better idea of what to look at.
I wouldn't let the sequence bog you down. If you do the PFMEA before the DFMEA (which is very, very common - but I would say it is not the 'smartest way' to do it), it's a matter of reviewing the two together and checking to see if anything from the DFMEA should be added to the PFMEA.
If you review the APQP document I linked above and still have questions, come on back and ask more questions.
Gotta run. I'm leaving for Tampa in a couple of hours.
|

1st March 2000, 03:45 PM
|
 |
Courtesy Access
Registration Date: Aug 1999
Location: Rochester, NY US
|
|
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
|
|
|
We always did PFD, PFMEA, then PCP. DFMEA was provided by design as the first document. In reality the PFMEA requires you identify "current process controls" so it was in all practicality a simultaneous activity. Alot depends on whether you are looking at an existing process or developing a new one.
|

2nd March 2000, 09:20 AM
|
 |
Inactive Registered Visitor
Registration Date: Mar 1999
Location: FL
Age: 44
|
|
Posts: 73
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 45 Karma: 10 
|
|
Marc, it's not often I disagree with you... the customer's critical characteristics should be the "Input" in Phase 1 of APQP. Those characteristics are part of the design consideration, thus included in the Design FMEA.
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|