The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Contract Review Process


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 17th May 2007, 09:29 PM
phxsun2001 phxsun2001 is offline
Involved - Posts

Registration Date: Dec 2004
Location: US
 
Posts: 67
Thanks Given to Others: 1
Thanked 3 Times in 2 Posts
Karma Power: 21
Karma: 10
phxsun2001 has less than 100 Karma points so far.
Please Help! Missing Contract Review Records on big contracts

I audited a company's contract review (CR) function to ISO9001 and AS. I could not find records of CR on big contracts with Boeing or USAir. I expected to find a one-page Contract Review form signed by affected Departments Managers.

I was told that they received the bid request and they send the proposal back. If Boeing sends a contract back to the company with no changes and if the president of this company signs the contract, it is evidence of records of contract review. It is because the company President would not sign anything without having his staff check it out.

I asked if there were evidence that the affect departments reviewed the contract. The answer was- there is no requirement in the std to show that.

I asked if this method of satisfying the CR record requirement is documented? The answer was- There is no requirement to document it. They are showing evidence of CR by the signature of the President.

This is how I look at it. 7.2.2 requires records of contract review. If the company decides to use the signature of the President on the final contract as the record, it needs to be documented somewhere. Otherwise, using the signature alone as record of CR does not meet the intent of the standard.

What do you think?
Reply With Quote

Sponsored Links
  #2  
Old 17th May 2007, 11:39 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default Re: Missing Contract Review Records on big contracts

Quote:
Originally Posted by phxsun2001 View Post

I audited a company's contract review (CR) function to ISO9001 and AS. I could not find records of CR on big contracts with Boeing or USAir. I expected to find a one-page Contract Review form signed by affected Departments Managers.

I was told that they received the bid request and they send the proposal back. If Boeing sends a contract back to the company with no changes and if the president of this company signs the contract, it is evidence of records of contract review. It is because the company President would not sign anything without having his staff check it out.

I asked if there were evidence that the affect departments reviewed the contract. The answer was- there is no requirement in the std to show that.

I asked if this method of satisfying the CR record requirement is documented? The answer was- There is no requirement to document it. They are showing evidence of CR by the signature of the President.

This is how I look at it. 7.2.2 requires records of contract review. If the company decides to use the signature of the President on the final contract as the record, it needs to be documented somewhere. Otherwise, using the signature alone as record of CR does not meet the intent of the standard.

What do you think?
I think that if it was a one-man shop, the question wouldn't arise. I, personally, espouse multi-function contract review boards, but the buck stops at the door of the top manager, who can overrule everyone. If he is satisfied with the sufficiency of the review, so be it!

The intent of the Standard is for the parties to the contract to assure themselves of the sufficiency of the capability and capacity of themselves AND the other party to complete the contract according to the terms and conditions of the contract. Is any company President in his right mind going to take a lot of time to question the capability and capacity of Boeing to fulfill its part? Who is going to question the President's understanding of his own company's capability and capacity?
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
Sponsored Links

  #3  
Old 17th May 2007, 11:56 PM
BradM's Avatar
BradM BradM is offline
Super Moderator

Registration Date: Sep 2006
Location: Arlington,Texas
 
Posts: 3,384
Thanks Given to Others: 814
Thanked 850 Times in 607 Posts
Karma Power: 274
Karma: 9659
BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.
BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.
Default Re: Missing Contract Review Records on big contracts

Wes, as always, you speak wisdom. I do have a question, though.

I have never espouse to a "check the box" approach to quality systems. However, a standard is a standard.

Shouldn't the customer at least provide some methodology to assure a contract has been reviewed. I mean, a spreadsheet or something saying, "yep", on this date, I looked at WVT contract, and signed it.

Too, contracts should be reviewed on the front-end, and back-end to assure the contract was completed, etc.

So this small company doesn't keep any copies of contracts? They just willy-nilly sign/ approve them, without keeping something for their records? I was a one-man shop, but you can bet the bank I reviewed contracts forwards and backwards, and always demonstrated review by me and my customer on it.

So did I miss something in your explanation? Because I do believe this shop, however big or small, should be able to demonstrate that contracts are reviewed.
__________________
Brad
My idea of housework is to sweep the room with a glance.
Reply With Quote
  #4  
Old 18th May 2007, 01:03 AM
AndyN's Avatar
AndyN AndyN is offline
Forum Moderator

Registration Date: Feb 2005
Location: Michigan, USA
 
Posts: 3,878
Thanks Given to Others: 1,784
Thanked 1,258 Times in 901 Posts
Karma Power: 297
Karma: 10025
AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.
AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.
Thumbs up Re: Missing Contract Review Records on big contracts

I'm thinking that the majority of the review is in the proposal phase. Sure, if a customer goes with the proposal, then the multi-disciplinary review has been done, but some record of the fact that the customer's acceptance didn't change anything, is required. So just have them sign off on to indicate that (cursory) look over actually occured.
__________________
'Cause you know sometimes words have two meanings.....
Reply With Quote
  #5  
Old 18th May 2007, 01:15 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default Re: Missing Contract Review Records on big contracts

Quote:
Originally Posted by phxsun2001 View Post

I audited a company's contract review (CR) function to ISO9001 and AS. I could not find records of CR on big contracts with Boeing or USAir. I expected to find a one-page Contract Review form signed by affected Departments Managers.

I was told that they received the bid request and they send the proposal back. If Boeing sends a contract back to the company with no changes and if the president of this company signs the contract, it is evidence of records of contract review. It is because the company President would not sign anything without having his staff check it out.

I asked if there were evidence that the affect departments reviewed the contract. The answer was- there is no requirement in the std to show that.

I asked if this method of satisfying the CR record requirement is documented? The answer was- There is no requirement to document it. They are showing evidence of CR by the signature of the President.

This is how I look at it. 7.2.2 requires records of contract review. If the company decides to use the signature of the President on the final contract as the record, it needs to be documented somewhere. Otherwise, using the signature alone as record of CR does not meet the intent of the standard.

What do you think?
Quote:
Originally Posted by BradM View Post

Wes, as always, you speak wisdom. I do have a question, though.

I have never espouse to a "check the box" approach to quality systems. However, a standard is a standard.

Shouldn't the customer at least provide some methodology to assure a contract has been reviewed. I mean, a spreadsheet or something saying, "yep", on this date, I looked at WVT contract, and signed it.

Too, contracts should be reviewed on the front-end, and back-end to assure the contract was completed, etc.

So this small company doesn't keep any copies of contracts? They just willy-nilly sign/ approve them, without keeping something for their records? I was a one-man shop, but you can bet the bank I reviewed contracts forwards and backwards, and always demonstrated review by me and my customer on it.

So did I miss something in your explanation? Because I do believe this shop, however big or small, should be able to demonstrate that contracts are reviewed.
When you ask about keeping contracts (doesn't keep any copies of contracts?) do you suppose they throw them away? The company probably keeps the contract/purchase order for billing purposes as well as for keeping track of production. In any regard, the specifics of Contract Review are different under different circumstances. If I make off-the-shelf goods and I get an order for 10,000 pieces, what more contract review do I need than to see if I have it on the shelf or have to produce more?

The company's reply is:
1) The president won't make the proposal until he has assured himself of the company's capability and capacity to fulfill a contract if Boeing agrees to the proposal. He is content with Boeing's ability to pay if they order.

2) Purchase order or proposal comes back with no changes - no more review is necessary.

3) Our record is the signed and countersigned (by the customer) proposal, evidenced by the purchase order (we are allowed to infer countersignature of the proposal if we get a purchase order exactly according to the terms of our proposal.)

On a personal note: I'm as obsessive as anyone when it comes to dotting i's and crossing t's. Yet, I had some customers who would call up and say, "Make me ten thousand pieces just like part number xyz, except make the length 2.500 inches instead of 2.250 inches. Redline a drawing of xyz with what you need, call it "xyz alternate 2.5" and I'll sign off on it."

Both customer and I had enough history that we could trust each other to perform according to this verbal contract. Note, especially, there was no query of cost - customer expected I would charge the same rate as xyz plus my actual costs and markup for making the change.

Ultimately, we both reduced the contract to paper - redline, inspection criteria, etc., including a projected delivery date once I knew our machine availability (could we suspend a running project long enough to make this short run or would we be delayed a week or so in starting until we had sufficiently surplus built up on another order to squeeze in a short run order?)

In our mind, contract review of an order like this did NOT require a formal meeting and capacity could be resolved by one person looking at the software which showed status of all running projects plus a quick verbal check with an operator to assure the machine was running smoothly and did not need unscheduled maintenance (the glorious value of regular preventive maintenance!) We already knew we were capable of making a nearly identical part. The documentation of review (by one person - equivalent to the President of the subject) and acceptance would be the issuance and countersign of the redline version of the part. I recall one instance where we manufactured 50,000 parts over 2 years based on a redline and never did receive an official release of the revision.

(In fairness, I did ALWAYS include a copy of the redline with every shipment to forestall any incoming inspection drone who pulled the previous version for inspection purposes.)

I guess the only real "final review" is when the customer accepts and pays for the goods and there is no "do over" requested.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857

Last edited by Wes Bucey; 18th May 2007 at 01:20 AM.
Reply With Quote
Thanks to Wes Bucey for your informative Post and/or Attachment!
  #6  
Old 18th May 2007, 01:57 AM
phxsun2001 phxsun2001 is offline
Involved - Posts

Registration Date: Dec 2004
Location: US
 
Posts: 67
Thanks Given to Others: 1
Thanked 3 Times in 2 Posts
Karma Power: 21
Karma: 10
phxsun2001 has less than 100 Karma points so far.
Default Re: Missing Contract Review Records on big contracts

Quote:
Originally Posted by Wes Bucey View Post

When you ask about keeping contracts (doesn't keep any copies of contracts?) do you suppose they throw them away? The company probably keeps the contract/purchase order for billing purposes as well as for keeping track of production. In any regard, the specifics of Contract Review are different under different circumstances. If I make off-the-shelf goods and I get an order for 10,000 pieces, what more contract review do I need than to see if I have it on the shelf or have to produce more?

The company's reply is:
1) The president won't make the proposal until he has assured himself of the company's capability and capacity to fulfill a contract if Boeing agrees to the proposal. He is content with Boeing's ability to pay if they order.

2) Purchase order or proposal comes back with no changes - no more review is necessary.

3) Our record is the signed and countersigned (by the customer) proposal, evidenced by the purchase order (we are allowed to infer countersignature of the proposal if we get a purchase order exactly according to the terms of our proposal.)

On a personal note: I'm as obsessive as anyone when it comes to dotting i's and crossing t's. Yet, I had some customers who would call up and say, "Make me ten thousand pieces just like part number xyz, except make the length 2.500 inches instead of 2.250 inches. Redline a drawing of xyz with what you need, call it "xyz alternate 2.5" and I'll sign off on it."

Both customer and I had enough history that we could trust each other to perform according to this verbal contract. Note, especially, there was no query of cost - customer expected I would charge the same rate as xyz plus my actual costs and markup for making the change.

Ultimately, we both reduced the contract to paper - redline, inspection criteria, etc., including a projected delivery date once I knew our machine availability (could we suspend a running project long enough to make this short run or would we be delayed a week or so in starting until we had sufficiently surplus built up on another order to squeeze in a short run order?)

In our mind, contract review of an order like this did NOT require a formal meeting and capacity could be resolved by one person looking at the software which showed status of all running projects plus a quick verbal check with an operator to assure the machine was running smoothly and did not need unscheduled maintenance (the glorious value of regular preventive maintenance!) We already knew we were capable of making a nearly identical part. The documentation of review (by one person - equivalent to the President of the subject) and acceptance would be the issuance and countersign of the redline version of the part. I recall one instance where we manufactured 50,000 parts over 2 years based on a redline and never did receive an official release of the revision.

(In fairness, I did ALWAYS include a copy of the redline with every shipment to forestall any incoming inspection drone who pulled the previous version for inspection purposes.)

I guess the only real "final review" is when the customer accepts and pays for the goods and there is no "do over" requested.

This is a FAA repair station. The missing contract review records are blanket contracts from airlines sending different parts for overhaul and repair and test and certification. This company needs to review if they have the testing capability, certified technicians, tooling, capacity ... for the different types of parts. The review probably affected all levels department managers. The contract review Operating procedure does not mention about these big contracts. It only covers the jobs that come in everyday for repair. They consider the POs "contracts" and they are processing about 50 to 70 "contract reviews" per their OP. When I questioned why the OP does not cover the big contract review, the answer was - there is no requirement to cover it, but we are doing it. The record is the signature by the president. IMO the signature does not meet the contract review record requirement. If this process is documented in their contract review OP, then it may be acceptable, because now there is a link. Without this link, the singature is not tied to the contract review record. It simply says the the company agrees to the terms and conditions of the contract and that's it.

I tried to write it up as a minor nonconformance, but the Lead Auditor and the Manager of the registrar did not think that there is a nonconformance. That's why I bring this up for clarification. Thanks.
Reply With Quote
  #7  
Old 18th May 2007, 04:57 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default Re: Missing Contract Review Records on big contracts

Without reading some of the longer posts above, my thoughts are that in terms of ISO9001 compliance the record of contract review being the presidents signature is OK. Record of review need only be endorsement that the review has been done and the order accepted, it need not detail all the decision making processes, etc, etc in the record.

If the contract were complex however, on the basis of this contract review recording method I would tend to then audit deeper to see that requirements of the contract were being met or translated into working documents, if not I could then suggest that the contract review process were inadequate rather than arguing the toss over the record of contract review - a much more powerful audit finding.
Reply With Quote
Thank You to M Greenaway for your informative Post and/or Attachment!
  #8  
Old 18th May 2007, 09:50 AM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
Default Re: Missing Contract Review Records on big contracts

Quote:
Originally Posted by M Greenaway View Post

Without reading some of the longer posts above, my thoughts are that in terms of ISO9001 compliance the record of contract review being the presidents signature is OK. Record of review need only be endorsement that the review has been done and the order accepted, it need not detail all the decision making processes, etc, etc in the record.
I have to agree here. If their process states that the president will review, and the evidence of his review is his sign-off, they have met the requirement of the standard.

Now - if there are requirements above and beyond the ISO9K2K, that may be a different story - but as far as I can tell - your question was related to this standard.
__________________
CarolX

Theater is life, film is art, and television is furniture.
Reply With Quote
Thanks to CarolX for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Contract Review Process

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
ISO 9001:2008 Contract Review for a business that doesn't have formal contract review corwall Contract Review Process 11 15th October 2009 08:22 PM
Contract Review - Interpreting the intent of Contract Review - Open POs - Clause 4.3 LaurieB Contract Review Process 6 17th May 2009 11:30 AM
Enquiry and Contract Records - Review and Approval gould777 Inspection and Test, Sampling and Related Topics 1 18th July 2008 11:00 PM
AS9100 - 7.2 Contract Review - How others do Contract Review in a documented fashion Garry Contract Review Process 6 11th April 2005 09:52 PM
Best way to implement Contract Review? ISO 9001 - Contract Review Arturo Rosales Contract Review Process 6 20th August 1999 06:49 PM



The time now is 06:43 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts