The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 5th July 2000, 11:54 AM
Don Watt
Unregistered Guest

 
Posts: n/a
Please Help! Seeking: Example of a completed FMEA

We've just started trying to use FMEA to analyse & improve our assembly processes, however I believe we're getting bogged down in detail and terminology.
Would anybody have an example of a completed FMEA that they'd be willing to share & point us in the right direction.
Cheers!
Reply With Quote

Sponsored Links
  #2  
Old 7th July 2000, 02:31 PM
Paul Vragel
Unregistered Guest

 
Posts: n/a
Don - I've sent you an excerpt from our FMEA Training and Implementation Guide (interactive CBT), with some worked examples for different process types.

------------------
Paul
Reply With Quote
Sponsored Links

  #3  
Old 10th July 2000, 11:39 AM
Don Watt
Unregistered Guest

 
Posts: n/a
Read This!

Thanks Paul -usefil clip.
I'm still a little confused, maybe a little more detail may help the forum in trying to sort out my problems.

Do we need to include every process step (including inspection, or simply the operations that amy cause defects?)Would we class defects not found by an unstable inspection system as failure modes?

How specific do we need to be regarding potential effects of failure to the customer.
One point of view is that any defect reaching the customer could be classified as "Customer receives defective component"
I believe that this is far too general & that we should go into more detail, e.g. "Groove out of position , cannot fit to gearbox assembly" The severity rating would reflect how serious an individual problem may be, but does the FMEA need to include the detail for reference?

My view is that we should attempt to "Describe the effects of the failure in terms of what the customer might notice or experience ..... stated in terms of product or system performance.

Hope somebody can help me with this
TIA

[This message has been edited by Don Watt (edited 10 July 2000).]
Reply With Quote
  #4  
Old 12th July 2000, 01:10 AM
Paul Vragel
Unregistered Guest

 
Posts: n/a
Don - let's try some specifics:

You mentioned a "groove out of position - can't fit to gearbox assembly" as one example.

Can't fit to gearbox assembly is one failure mode
Causes could be:
Groove out of position
Diameter too large
Taper incorrect

A correlation diagram can help you identify where in your process these defects can be created (what process steps affect what results). These process steps need to be looked at for occurrence.

Inspection is a detection mechanism, rather than a failure mode. An unstable inspection system means you have a diminished ability to detect problems, so a higher detection number (for RPN).

One failure mode (as above), may involve multiple process steps, each with its own occurrence and detection situation (i.e., a separate line on the FMEA).

As you correctly note you should also consider the different severity to the customer of failures.

For example, a "less severe" failure might be a cosmetic defect that has no effect on performance, but is noticed by the customer.

On the other hand, a part that fits in the gearbox, but later fails for some reason, could likely be a "more severe" failure, due to potentially dangerous results for the ultimate customer, high warranty costs for the gearbox manufacturer etc.


------------------
Paul
Reply With Quote
  #5  
Old 25th July 2000, 10:41 AM
Paul Morrow Paul Morrow is offline
Involved in Discussions

Registration Date: Oct 1998
Location: UK
 
Posts: 21
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 46
Karma: 15
Paul Morrow has less than 100 Karma points so far.
BIG Smile

Don
I agree that it is often difficult to judge the level of detail when preparing FMEAs, coz as we all know its a PAIN to do it properley. I look upon it as a test of my character (sad!). Saying that it can be satisfying to know you've covered all angles (helped prompt many process improvements here).

To make it more manageable you could try breaking a process down into sub-processes and tackling each in turn, progressively working through the process.

We try to keep things as simple as possible here and brainstorm the following questions in turn:
1. What can go wrong?
2. How likely is it to go wrong?
3. Will our current controls find it if it has gone wrong?

If you follow this simple sequence you may well find that it gives weight and authority to overcoming issues such as 'unstable' inspection systems (if I've got your drift).

I find the real value of FMEAs is that it allows you and your team to understand your process. Of course customer requirements must be considered but if you focus soley on them you run the risk of missing out on opportunities for real process improvement.

As a final point I would suggest that "Customer receives defective component" is not a failure mode, its a pissed off customer.
Reply With Quote
  #6  
Old 17th August 2000, 02:49 PM
Brian Dowsett
Unregistered Guest

 
Posts: n/a
Lightbulb

Don,
My 0.02 punts worth.
In answer to your first question about including inspection, I think you're refering to a physical process step here, as in a test station which is part of the manufacturing process. Although, as already pointed out, this will constitute a means of detection for earlier (in the process) failure modes, I think you are trying to capture things that can go wrong with the station itself. In this case I'd say yes you should include it as a process step. As you suggest, a failure mode for an inspection station might be that the gauge becomes unstable- and you would then apply severity occurence and likelyhood of detection to that scenario.
On the other point I'd definitely get as much detail recorded regarding the effect on the customer. For some reason a lot of people try to generalise these effects into bland statements like "defective material to the customer". If this is done, as you say the severity will make some differentiation but when you, or the next person in the job, goes back to the fmea, they may not understand what the thinking was at the time. Therefore if the effect to the customer is "groove out of position" then write that down on the form. I'd even go further and say "Groove out of position leading to poor fit with associated part, leading to premature wear, noise, and associated warranty claims"
Another thing I've seen a lot (soapbox time)
is Engineers trying to couch everything in technical jargon on fmeas. We'll have our meeting and discuss how this failure results in a split seal and grease running out, but can we write "seal splits and grease runs out" ?
No, someone has to try to think of a more complicated phrase like "Part subject to stress failure resulting in egress of lubrication medium"
My opinion is that on the first day a student sits in your office bored sh**less, you should be able to hand him the fmea book and the process flow charts, and in a few hours he'll have a good idea of how the process goes and what can go wrong.

Cheers Don
Reply With Quote
  #7  
Old 24th August 2000, 03:52 PM
Mike1245
Unregistered Guest

 
Posts: n/a
Don:

In answer to your question about what to include on the FMEA - a good first step is do as the FMEA manual suggests, start with a flow chart / risk assessment. In appendix C of the manual you'll find an example (and as with most AIAG examples it's not the best, but it should get the idea across). The primary wording on pg 51 in the manual, though, is asteriked at the bottom, *FMEA Required (high risk). The example corresponds to the FMEA form layout for the Process FMEA starting on page 25. In other words, no, you don't have to list every single potential failure mode (if you choose not to), but those that are identified as being high risk per the risk assessment MUST be included on an FMEA. It's a good tool, and gives the user a pretty good idea of where to start. The only problem is defining high risk, and that, to an engineer, is any risk at all, with the end result of every prcess step being put on the FMEA anyway.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Seeking thoughts on using BOTH FTA (Fault Tree Analysis) and FMEA icare2much ISO 14971 - Medical Device Risk and Hazard Control 17 20th November 2009 06:22 PM
Help regarding FMEA - Seeking Review alokb FMEA and Control Plans 1 4th February 2006 04:52 AM
Seeking part time work (FMEA,....) Michael Walmsley Seeking Employment 0 17th January 2006 01:40 PM
Seeking Recommendations: FMEA Software Tools Rearendloader Quality Assurance and Compliance Software Tools / Solutions 9 18th October 2002 10:09 AM
FMEA - Questions with respect to applicability to the completed assembly Danny1966 FMEA and Control Plans 4 26th September 2002 02:34 PM



The time now is 01:31 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts