|
|
 |

26th June 2001, 07:23 AM
|
|
|
What is the difference between a Concept FMEA and a System FMEA?
What is the diffrence between ConceptFMEA & SystemFMEA?
|

26th June 2001, 02:00 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,860
Thanks Given to Others: 1,896
Thanked 1,570 Times in 1,021 Posts
Karma Power: 605
|
|
This is not meant to be sarcastic, but one is on a system and one is on a concept. If you think about the differences, it should become clear.
Take a concept such as windshield wipers which turn on automatically when it rains. You FMEA the concept, in part for feasibility.
Then let's say you decide to do it and you design a system (combination of mechanical and electronic) and you then FMEA that.
Also see FMEA Basics
|

18th August 2001, 01:56 AM
|
|
|
Thank you for your response Mr.smith
But When I studied these subjects it seems that there is'nt any defference between them.even all of definition in the concept and system FMEA is the same.
Do you have a perfect reference to these type of FMEA?
|

18th August 2001, 03:08 PM
|
|
|
Nothing is perfect. A FMEA is a FMEA, it is a process of determining possible pepples in the road ahead. It really doesn't matter if it is a design, process, system, concept etc... the tools are basically the same.
You used the term feasibility, we all do it but when you come down to it the feasibility and FMEA serve the same purpose. Don't get caught up in symantics.
Just my lowly opinion.
Good Luck!
ASD...
|

18th August 2001, 09:16 PM
|
|
E-Mails Invalid or Rejected
Registration Date: Sep 1998
Location: St. Marys, PA
|
|
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0 Karma: 40 
|
|
|
Is everyone aware that the 3rd edition on the fmea handbook has been released? I ordered mine yesterday.
Al, I wouldn't worry about what you call your fmea as long as you are doing them. And you can do them on anything. If you have a customer request to do concept fmeas then by all means call your fmeas concept fmeas.
|

21st April 2004, 11:28 AM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,860
Thanks Given to Others: 1,896
Thanked 1,570 Times in 1,021 Posts
Karma Power: 605
|
|
Basically, an FMEA is a Risk Analysis tool.
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
|

20th August 2009, 05:40 AM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Aug 2009
Location: Italy
|
|
Posts: 1
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 2 Karma: 10 
|
|
Re: What is the difference between a Concept FMEA and a System FMEA?
hello!
I had the same problem in the past when I found the for the fist time the Concept FMEA in a Ford manual (FMEA version 31, section 3);it was decide to use:
-Concept FMEA: in the feasibility phase for the new or updated platforms; only potential customer are considered
-system FMEA: at the early phase of the development of a new system; the requirements have been fixed nd there is a nomination letter from the Customer
ciao
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|