The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Records and Data - Quality, Legal and Other Evidence


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 15th June 2000, 12:12 AM
kennyq
Unregistered Guest

 
Posts: n/a
BIG Smile 4.5 Engineering Change record of implementation into production

What exactly are the looking for when they ask for record of engineering change into production. My company seems to think they are talking about the PPAP date. I don't think so, I think they mean what it says "actual implementation into production"
Reply With Quote

Sponsored Links
  #2  
Old 23rd June 2000, 03:23 AM
Andy Bassett Andy Bassett is offline
An Early Cover

Registration Date: Jun 1999
Location: Donegal Ireland
 
Posts: 278
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 48
Karma: 15
Andy Bassett has less than 100 Karma points so far.
Hello Kennyq

Doesnt look like you got an answer to your question, and i dont think that i am going to help you much (PS have another go at rephrasing it, maybe you will connect with someone out there).

As an aside, an auditor once told me that he checks the health of a company in 10 minutes by REVIEWING THEIR ENGINEERING CHANGE SYSTEM.

I didnt really read too much into this at the time, but the more i see the more i think it is true. I guess it is because many companies concentrate on getting products manufactured and out of the door, at the expense of working to consequential/disciplined procedures. In most companies an Engineering Change involves a lot of small detailed work that nobody wants to take on and ensure it is done. In my environment (Motorsport) this is deadly. Stores are not asked to scrap or rework parts, customers are not informed about changes, suppliers are not informed about changes to open orders etc.

In one company where i am now we have developed an Excel spreadsheet, where the changes are noted and we have developed a number system for the necessary changes, of which there are 16 POSSIBILITIES, ie Possibility Number 3 - Send new drawing to supplier etc. The relevant Project Manager is responsible to ensure that all these activities are done, and only then can he close the point.

Coming back to your question, i think you are being asked how the outcomes from your Engineering Change System is actioned.

Come back to use if you dont have what you want

Regards


------------------
Andy B

[This message has been edited by Andy Bassett (edited 23 June 2000).]
Reply With Quote
Sponsored Links

  #3  
Old 23rd June 2000, 08:17 AM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
I was always told it was the date of implementation in production. The best control I had at a large company was updated paper work with the engineering change level and the effective date of change. Still PPAP documentation, and I think the Source warrant documented the effective date.
Reply With Quote
  #4  
Old 23rd June 2000, 08:22 AM
Jim Biz's Avatar
Jim Biz Jim Biz is offline
Forum Moderator

Registration Date: Mar 2000
Location: MID-WEST USA
 
Posts: 486
Thanks Given to Others: 0
Thanked 4 Times in 3 Posts
Karma Power: 51
Karma: 114
Jim Biz is appreciated, and has over 100 Karma points.Jim Biz is appreciated, and has over 100 Karma points.
Lurker

Just 2Cnts worth: we're 9002 - don't deal with design changes but it could be close to what we do with "contract/blueprint ammendment" changes that come along.

Can't be sure but the way the question reads but I would think that a "master log" of what changes were officially approved and what date they were released would cover it.

Regards
Jim
Reply With Quote
  #5  
Old 24th June 2000, 06:38 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

You manufacture a lot. You implement a change. You have to record the lot number of the last of the old 'design' and the 1st lot of the 'new design'. It has nothing to do with the PPAP date. Your interpretation is correct.
Reply With Quote
  #6  
Old 24th June 2000, 09:57 PM
Dawn Dawn is offline
E-Mails Invalid or Rejected

Registration Date: Sep 1998
Location: St. Marys, PA
 
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 40
Dawn has less than 100 Karma points so far.
During our assessment audit, this question came up and what we did to fix it was: When htere is an engineering (print,drawing) change, we mark up the print change documentation for the date it first went into production and an order was completed.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Records and Data - Quality, Legal and Other Evidence

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
From ECR (Engineering Change Request) to ECN (Engineering Change Note) - double work! tomjess Documentation Control Systems, Procedures, Forms and Templates 2 22nd November 2008 09:10 PM
ECO (Engineering Change Order) Revision - Letter change or part number change? kcmomde Manufacturing and Related Processes 13 28th July 2008 06:39 PM
Engineering ECR (Engineering Change Request) and ECN (Eng Change Notice) Procedures wsoconnell Documentation Control Systems, Procedures, Forms and Templates 2 15th January 2008 12:43 PM
ECN (Engineering Change Notice) to ECR (Change Request) Database with Email Report orionz06 Documentation Control Systems, Procedures, Forms and Templates 8 5th November 2007 06:16 PM
ECN (Engineering Change Notice) / ECO (Engineering Change Order) System Raffy Documentation Control Systems, Procedures, Forms and Templates 1 20th March 2001 04:11 PM



The time now is 04:14 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts