The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 19011 and ALL Auditing Discussions


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 17th April 2000, 05:07 PM
Don Watt
Unregistered Guest

 
Posts: n/a
Question Does an Audit Schedule have to be a Controlled Document?

Does an audit schedule have to be a controlled document?
e.g. at the start of the year I produce a schedule / plan of the internal audits expected to be conducted throughout the year.
As time progresses various revisions may be needed to include additional audits arising from quality problems or to re-arrange audits to allow for new requirements to be effectively introduced.
Does the initial plan need to be at revision level 1 and each amendment to plan included at an incremented revision level?
Reply With Quote

Sponsored Links
  #2  
Old 17th April 2000, 05:38 PM
wpbudd
Unregistered Guest

 
Posts: n/a
Thumbs up

My audit schedule is controlled. However, the controlled part is the form number not the actual data. My work instruction states that updates may be necessary. Again, only the form in control not the information, since said information may change at a give time.
Reply With Quote
Sponsored Links

  #3  
Old 17th April 2000, 10:41 PM
David Mullins's Avatar
David Mullins David Mullins is offline
Aussie Bloke

Registration Date: Nov 1999
Location: Adelaide, South Australia, Australia
Age: 47
 
Posts: 495
Thanks Given to Others: 0
Thanked 13 Times in 8 Posts
Karma Power: 51
Karma: 84
David Mullins has less than 100 Karma points so far.
Yin Yang

No the audit schedule does not have to be a controlled document.

The auditor may well expect a date on the schedule to signify the status/currency. They may also ask who gets the schedule.
How often is it updated.

The important thing is that the schedule complies with what your procedure says.

Cheers.

------------------
Reply With Quote
  #4  
Old 12th May 2000, 07:07 AM
matthew evans matthew evans is offline
Inactive Registered Visitor

Registration Date: Mar 2000
Location: England
 
Posts: 33
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 40
Karma: 10
matthew evans has less than 100 Karma points so far.
Are you mad. Of course an audit plan is a controlled document. The point about the schedule being updated to include additional audits is covered by simply having a note at the bottom of the plan stating that additional audits can be carried out and a mark being put onto the audit plan. The blank audit schedule should have a form number and a revision status for the blank form only. The completed schedule only requires the year as an heading.
Reply With Quote
  #5  
Old 27th May 2000, 01:36 AM
John C
Unregistered Guest

 
Posts: n/a
Matthew Evans,
The use of numbers and revisions is optional, being only the conventional, and not the only possible, method of control. When numbers and revs are used, they apply only to procedures and forms and will be applicable, of course, to the procedure which describes the planning and implementation of the internal audit. The actual schedule is not a procedure. It may be on a form but there is nothing in the Standard to say that it must be. Basically, a schedule (by definition) is only an ordered list - not necessarily a dated list. It can be on the back of a postcard for all that it matters, or it could be only a verbal agreement.

In fact, the second paragraph of 4.17 (the only mention of scheduling in the Standard) gives us leeway to initiate or postpone audits according to perceived need rather than use a dated list. (This relates to the flexibility to changes in circumstances mentioned by David and Lurker above) For example; I can imagine an organisation where the decision to hold, or not hold an internal audit, is made at Management Review, depending on the current situation and imminent events. This method might have become the conventional approach from the time the first edition of ISO 9001 was introduced, had most of us not already become bound by the chains of bureaucracy. There is nothing in the Standard to prevent this approach and it has a lot to commend it. It would align the implementation of ISO 9001 more closely with Deming, particularly regards items; 2,3,5 and 7 of his 14 Points For Management and conform to Shonberger’s advice to eliminate waste throughout the organisation.
In such a case, the minutes of the meeting, filed anyway as the quality record of Management Review, would provide both the schedule and the quality record of scheduling. (Note; the control of quality records is a different subject entirely)

Please don’t hesitate to call me mad, if that is what you think, but be sure to tell me where I’m wrong, and don’t let it be just your opinion; back it up with evidence from your experience and, most of all, evidence taken directly from ISO 9001 since that is the document under consideration and furthering of our understanding of compliance with that document is the object of these discussions. Whatever else we get from these discussions, we all want to learn.
Respectfully yours,
John C

Reply With Quote
  #6  
Old 22nd June 2000, 05:27 AM
Claes Gefvenberg's Avatar
Claes Gefvenberg Claes Gefvenberg is offline
Forum Administrator

Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 49
 
Posts: 3,771
Thanks Given to Others: 246
Thanked 244 Times in 172 Posts
Blog Entries: 13
Karma Power: 213
Karma: 4951
Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.
I would regard the schedule as a record.

We use an Access application to run our entire audit process. That includes reports, checklists and schedule as well as follow ups. Once a year we enter the audit schedule, print it out and sign it.

This application also sends the audit plan to our intranet. Any changes or additions to the plan is relayed to the intranet.

Our procedures refer to the application.

Claes Gefvenberg

[This message has been edited by Claes Gefvenberg (edited 22 June 2000).]
Reply With Quote
  #7  
Old 22nd June 2000, 09:36 PM
David Mullins's Avatar
David Mullins David Mullins is offline
Aussie Bloke

Registration Date: Nov 1999
Location: Adelaide, South Australia, Australia
Age: 47
 
Posts: 495
Thanks Given to Others: 0
Thanked 13 Times in 8 Posts
Karma Power: 51
Karma: 84
David Mullins has less than 100 Karma points so far.
Spin!

It's amazing what happens when you remove the blinkers and look at how the standard (any standard or system model for that matter) can be applied to best suit an organisation, and still be compliant. For those people who are establishing a new quality management system, I would say: don't make the hurdles too high from day one, make them achievable and then progressively improve the system, thus raising the bar.
I enjoy my open mind, my ability to conceptualize, and being just a little bit mad (well let's call it eccentric).
Cheers.

------------------
Reply With Quote
  #8  
Old 24th June 2000, 06:15 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,894
Thanked 1,564 Times in 1,017 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11549
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Quote:
Originally posted by David Mullins:
It's amazing what happens when you remove the blinkers and look at how the standard (any standard or system model for that matter) can be applied to best suit an organisation, and still be compliant. For those people who are establishing a new quality management system, I would say: don't make the hurdles too high from day one, make them achievable and then progressively improve the system, thus raising the bar.
Think INTENT in my opinion.

Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 19011 and ALL Auditing Discussions

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Controlled Document Definition - What constitutes a controlled document? shereenk Definitions, Acronyms, Abbreviations and Interpretations 9 29th April 2009 04:28 AM
The Optimal IA Schedule - How should the Internal Audit Schedule be set up? Pazuzu ISO 19011 and ALL Auditing Discussions 26 12th January 2008 01:02 PM
What is the difference between a controlled document and an uncontrolled document? johnkwt Documentation Control Systems, Procedures, Forms and Templates 10 7th February 2007 12:12 PM
Internal Audit Schedule Updates - Necessity of a revision date on the schedule Angela at SKF Internal Auditing 8 27th November 2006 04:20 PM
ISO/TS 16949 Audit Schedule - How to draw up an audit schedule hollyc ISO 19011 and ALL Auditing Discussions 3 4th April 2006 11:01 PM



The time now is 08:28 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts