The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 19011 and ALL Auditing Discussions


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 19th January 2001, 03:31 PM
Douglas E. Purdy
Unregistered Guest

 
Posts: n/a
Objective evidence for covering all shifts and locations

Have gone through the first follow-up of a QS Audit, and one of the items addressed was how to prove that all shifts and locations are covered. We have two facilities and the number of shifts vary at one location, based on amount of business. I would like some ideas as to how others address this lack of evidence.
Reply With Quote

Sponsored Links
  #2  
Old 19th January 2001, 03:40 PM
ml retcher
Unregistered Guest

 
Posts: n/a
I simply have a sign off sheet for each person that was audited to sign off. We have a column to sign what shift this person was on when audited, area they were working in when audited, and date of the audit.
Reply With Quote
Sponsored Links

  #3  
Old 23rd January 2001, 02:12 PM
Douglas E. Purdy
Unregistered Guest

 
Posts: n/a
The parts you are missing are:

1)I do not want to add another document to the System;
2)The QSA Checklist that we use would show what location was audited, but not the Shift. The QSA Checklist does not readily identify the shift information;
3)I do not intend making it a requirement to include this information for all observations made. I can audit a shift without having to document specific and/or detailed observations. (Yes, I am interested to know what may be done differently and if the issue is shift specific. But if not do I have to give detailed observations? My experience would say no.)

My current thought is to establish in the procedure flow that the assignments ensure that all shifts and locations are covered and when statusing the Annual Audit Schedule the Responsible Party shall check a field that all shifts and locations were audited.

Any feedback?
Reply With Quote
  #4  
Old 23rd January 2001, 02:51 PM
donnammurphy
Unregistered Guest

 
Posts: n/a
Thumbs up

I include the shift to be audited in the scope of the audit when it is orginally scheduled. I have auditors who only work 2nd and 3rd shifts, therefore I try and utilize them as much as possible. By including this in the scope of the audit, they are aware of the shift to be audited, plus I can pull the internal auditing records and show an auditor. I don't believe the standard states that you must "document" that you audit in all shifts, but that all shifts must be covered. Hope this helps...Donna
Reply With Quote
  #5  
Old 24th January 2001, 01:31 AM
Alf Gulford Alf Gulford is offline
An Early Cover

Registration Date: Aug 2000
Location: Portland, OR
 
Posts: 118
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 40
Karma: 15
Alf Gulford has less than 100 Karma points so far.
Lightbulb

This was something I've never thought about but since my auditors fill out an audit report for every interview, I could just add a block for the time the interview was started. Seems simple and straightforward. Am I missing something?

Alf
Reply With Quote
  #6  
Old 2nd February 2001, 02:01 PM
Doug
Unregistered Guest

 
Posts: n/a
Thumbs up

Our Audit Report Cover Sheet has a field for information pertaining to the audit to include the Auditor, Audited Area, Auditee, Audit Date, and SHIFT. If the audit overlaps from one shift to another, we enter 1/2, 2/3, or 3/1. If that would not work for you, enter the "Start" time and the "Finish" time. Just my thoughts.
Reply With Quote
  #7  
Old 2nd February 2001, 04:03 PM
Douglas E. Purdy
Unregistered Guest

 
Posts: n/a
Thanks for the examples, ideas, and recommendations. I'll see what the next follow-up brings.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 19011 and ALL Auditing Discussions

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Statement of Fact - Considered Objective Evidence? Kathryn L. Mullins Definitions, Acronyms, Abbreviations and Interpretations 12 19th June 2008 02:46 AM
Timescales for Objective Evidence to be available for a Corrective Action alex_bell Nonconformance and Corrective Action 5 29th February 2008 01:05 PM
How much objective evidence is required for ISO9000 certification? al40 Records and Data - Quality, Legal and Other Evidence 8 11th July 2005 07:47 AM
What is Objective Evidence in an Audit? Written? Visual? Both? Raptorwild ISO 9001 - Quality Management Systems Standard 19 3rd November 2004 06:09 PM
Objective Evidence of Review Steven Truchon Documentation Control Systems, Procedures, Forms and Templates 10 29th August 2000 05:07 PM



The time now is 06:22 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts