The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics > AQL - Acceptable Quality Level


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 31st August 2007, 03:41 PM
Pudge 72's Avatar
Pudge 72 Pudge 72 is offline
Involved in Discussions

Registration Date: Mar 2007
 
Posts: 84
Thanks Given to Others: 45
Thanked 36 Times in 28 Posts
Karma Power: 15
Karma: 160
Pudge 72 is appreciated, and has over 100 Karma points.Pudge 72 is appreciated, and has over 100 Karma points.
Please Help! AQL and Sampling Plan as they relate to Functional In-Process Inspections

OK Cove.

Throughout my career I have always been weak in the area of Sampling Plans and AQL levels as they relate to functional In-Process inspections whether it is the operator checking the part or as a QC function.
So, here goes the question. Has anyone created or does anyone have a good plan in Excel or Word for determining the amount of pieces to be inspected on an hourly basis as would be required per a Control Plan for production parts? Or, a document that explains a good methodology for the selection of # of pieces and time that would be acceptable to a customer?

IE - I check a feature on a part that is a length let's say. This Length is listed as a Feature that is Inspected on the Control Plan, but, it is not a customer critical. I inspect 5 pcs. per hour. I do not do CPK on this feature as it is more of a "preventive" inspection so that I can see a drift during the run to assist with an adjustment if necessary.
On this part, I have let's say 5 or 6 of these types of features to inspect and I am measuring 5 pcs. per hour.

I do 5 pcs. per hour because that is what I have always done and it seems to be economical whether it is the operator or QC - seems to be effective. But, what is the real or better way to arrive at the amount of pieces or time frame in the beginning of the project? I can't change the IP based on rolling data because it is submitted with my Control Plan - it needs to be developed on the Front end.
Any Ideas guys?? I hate the norm and never thought that this method was quite right.
Reply With Quote

Sponsored Links
  #2  
Old 31st August 2007, 04:08 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is online now
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,216
Thanks Given to Others: 755
Thanked 2,295 Times in 1,549 Posts
Karma Power: 611
Karma: 20390
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default Re: AQL, Sampling Plan

Quote:
Originally Posted by Pudge 72 View Post

OK Cove.

Throughout my career I have always been weak in the area of Sampling Plans and AQL levels as they relate to functional In-Process inspections whether it is the operator checking the part or as a QC function.
So, here goes the question. Has anyone created or does anyone have a good plan in Excel or Word for determining the amount of pieces to be inspected on an hourly basis as would be required per a Control Plan for production parts? Or, a document that explains a good methodology for the selection of # of pieces and time that would be acceptable to a customer?

IE - I check a feature on a part that is a length let's say. This Length is listed as a Feature that is Inspected on the Control Plan, but, it is not a customer critical. I inspect 5 pcs. per hour. I do not do CPK on this feature as it is more of a "preventive" inspection so that I can see a drift during the run to assist with an adjustment if necessary.
On this part, I have let's say 5 or 6 of these types of features to inspect and I am measuring 5 pcs. per hour.

I do 5 pcs. per hour because that is what I have always done and it seems to be economical whether it is the operator or QC - seems to be effective. But, what is the real or better way to arrive at the amount of pieces or time frame in the beginning of the project? I can't change the IP based on rolling data because it is submitted with my Control Plan - it needs to be developed on the Front end.
Any Ideas guys?? I hate the norm and never thought that this method was quite right.
Use of a sampling plan with an associated AQL or OPerating Characteristic Curve is usually done with finished lots of material, as in the case of final or incoming inspection. Determining sampling quantities and intervals for in-process checks is a little like setting calibration intervals. You do it based on experience and history. You should monitor closely in the beginning (what "closely" means will vary with the processes involved) and then gradually expand the interval until you're reasonably sure nothing bad is happening between inspections. The goal of these checks should be process control--knowing how to control the variables that can affect product quality.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
Thanks to Jim Wynne for your informative Post and/or Attachment!
Sponsored Links

  #3  
Old 31st August 2007, 04:24 PM
Pudge 72's Avatar
Pudge 72 Pudge 72 is offline
Involved in Discussions

Registration Date: Mar 2007
 
Posts: 84
Thanks Given to Others: 45
Thanked 36 Times in 28 Posts
Karma Power: 15
Karma: 160
Pudge 72 is appreciated, and has over 100 Karma points.Pudge 72 is appreciated, and has over 100 Karma points.
Default Re: AQL and Sampling Plan as they relate to Functional In-Process Inspections

Excellent.
This is exactly the type of feedback I am looking for.
I agree with you completely Jim. The philosophy you suggest is along my lines of thinking - but, based on my expierience, it will be hard to implement as it almost falls into QE territory whereas you base the inspection interval on historical data - the problem falls in where someone has to analyze all of that not to mention that it has to run for a while to gather this data.
So, while it could be said that in the end you will have a cost savings based on eliminating unecessary inspection, you will spend a lot to get to that point.
That is kind of my ultimate dilemma, in this day and age of listening to how much QC (by the operator or direct QC) is a non-value added activity, we don't seem to have good definitions in place for analyzing In-Process data to arrive at these points and eliminate the waste during production which is where the rubber meets the road - not Final inspection.
Reply With Quote
  #4  
Old 31st August 2007, 04:29 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is online now
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,216
Thanks Given to Others: 755
Thanked 2,295 Times in 1,549 Posts
Karma Power: 611
Karma: 20390
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default Re: AQL and Sampling Plan as they relate to Functional In-Process Inspections

Quote:
Originally Posted by Pudge 72 View Post

That is kind of my ultimate dilemma, in this day and age of listening to how much QC (by the operator or direct QC) is a non-value added activity, we don't seem to have good definitions in place for analyzing In-Process data to arrive at these points and eliminate the waste during production which is where the rubber meets the road - not Final inspection.
That's exactly what statistics is for.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
  #5  
Old 31st August 2007, 05:13 PM
Pudge 72's Avatar
Pudge 72 Pudge 72 is offline
Involved in Discussions

Registration Date: Mar 2007
 
Posts: 84
Thanks Given to Others: 45
Thanked 36 Times in 28 Posts
Karma Power: 15
Karma: 160
Pudge 72 is appreciated, and has over 100 Karma points.Pudge 72 is appreciated, and has over 100 Karma points.
Default Re: AQL and Sampling Plan as they relate to Functional In-Process Inspections

I know, but I am sure that you feel my pain when I try and explain and justify someone analyzing data - even if it is for improvement. Just wondering if you or anyone else had a better method right out of development - IE - CPK of 1.75 = 3 pcs. per hour for In-Process Inspection instead of 5 based on a certain lot size or something. I am not sure, I know how to apply the statistics on the historical data, but to change all of the paperwork for sampling sizes is a pain - probably trying to take a lazy way out that is really not there.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics > AQL - Acceptable Quality Level

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Sampling Plan - AQL effect on sample size BigEd09 Inspection and Test, Sampling and Related Topics 7 22nd June 2009 05:47 AM
AQL - Does AQL relate to the Six Sigma capability of my supplier? ivan99 AQL - Acceptable Quality Level 7 23rd August 2007 09:30 AM
What is the confidence level for a given AQL in zero sampling plan Yew Jin Inspection and Test, Sampling and Related Topics 4 10th August 2007 05:07 AM
Setting AQL (Acceptable Quality Level) on C=Zero inspections Norman V AQL - Acceptable Quality Level 16 6th December 2006 10:41 AM
AQL and RQL Calculation for Variables Sampling Plan WLN AQL - Acceptable Quality Level 8 7th November 2001 04:08 PM



The time now is 08:38 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts