The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 9001 - Quality Management Systems Standard


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 16th February 2000, 10:14 PM
Jase Eyre
Unregistered Guest

 
Posts: n/a
Question "Special" processes and 2000

In a recent post on Welding Inspection, Tom Goetzinger replied with the following:

Quote:
Originally posted by Tom Goetzinger:
Welding is normally defined as a "special process", in that it is only through destructive testing that the quality (strength) of the weld can be determined. For that reason,I would caution use regarding inspection criteria, unless it is the cosmetic aspects that you are concerned with.
I would suggest relying on the skill of your operators as opposed to inspection. We covered special processes in our procedures, indicating that those functions could only be performed by certified operators or operators in-training. Those in-training work under the direction of those certified and are allowed to perform those type of operations at which they have become proficient.
My question is this: Is there such a thing as a "Special Process" in the 2000 revision, or is this a term devised by an individual company? I can find no reference to this concept in the Standard.

In my industry (building design), the outcome of the design process likewise cannot be tested through traditional 'inspection' regimes (short of trying to knock down new buildings), but must rely on the skill of the designers. What implications does this have for compliance? How can we prove we've followed the relevant building standards short of documenting everything with checklists? Or can we rely on the fact that our designers are highly qualified, highly competant professionals?

...Or am I just confusing the issues (probable, given the day I'm having!)?

In fact, I think I'll go and have a lie down...


------------------
JasE
Reply With Quote

Sponsored Links
  #2  
Old 17th February 2000, 01:53 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

The rule of thumb used to be if you had to do a destructive test, it was a special process (air bags and bomb fuses are examples). Welding used to be but with ultrasound, x-ray and such a weld can now be checked without destruction.

I wouldn't equate your design with a 'special process'. And no - the year 2000 version does not mention 'special processes' which, all in all, makes sense. Don't let it get you excited.
Reply With Quote
Sponsored Links

  #3  
Old 27th February 2000, 01:56 AM
rrramirez's Avatar
rrramirez rrramirez is offline
Courtesy Access

Registration Date: May 1999
Location: Caracas, Venezuela
Age: 70
 
Posts: 97
Thanks Given to Others: 0
Thanked 2 Times in 1 Post
Karma Power: 45
Karma: 60
rrramirez has less than 100 Karma points so far.
Send a message via MSN to rrramirez
Yin Yang

ISO 9000:2000, 2.4.1 Note 3 gives a definition for "special process" ( A process where the conformity (2.6.1) of the resulting product (2.4.2) cannot be readily or economicaly verified is frequently referred to as a "special process".


------------------
Senior Member ASQ (1986)
Reply With Quote
  #4  
Old 27th February 2000, 07:05 PM
David Mullins's Avatar
David Mullins David Mullins is offline
Aussie Bloke

Registration Date: Nov 1999
Location: Adelaide, South Australia, Australia
Age: 47
 
Posts: 495
Thanks Given to Others: 0
Thanked 13 Times in 8 Posts
Karma Power: 51
Karma: 84
David Mullins has less than 100 Karma points so far.
Hehehe...

9000:2000 DOES mention special processes.
During 9000:1994 development they tried to eliminate special processes and then got soft. The same thing has happened again in the 2000 version.
7.5.5 states "This includes any processes where deficiencies may become apparent only after the product is in use or the service has been delivered."
This exactly fits Marc's scenario of weld failure.

------------------
Reply With Quote
  #5  
Old 27th February 2000, 08:35 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Quote:
Originally posted by David Mullins:

9000:2000 DOES mention special processes.
Yes - you are correct in what you say but then again, it does not label them special processes. So, per se, it does not mention 'special' processes. The description (and the intent I believe) is the same, I agree.

Thanks for pointing out the verbiage.

Reply With Quote
  #6  
Old 28th February 2000, 01:02 AM
David Mullins's Avatar
David Mullins David Mullins is offline
Aussie Bloke

Registration Date: Nov 1999
Location: Adelaide, South Australia, Australia
Age: 47
 
Posts: 495
Thanks Given to Others: 0
Thanked 13 Times in 8 Posts
Karma Power: 51
Karma: 84
David Mullins has less than 100 Karma points so far.
Hehehe...

To have a crack at the original question, I'd want proof that the structure was built to code.
I can remember many years ago a car company in Australia received several dozen steering wheels from a company that I was working for. Nothing unusual there except the 'ring' of the steering wheel would fall off after about one days use - ouch. Turned out a batch of the metal frames had been tack welded together, and skipped the full welding program due to a problem with the robot welder. They were then molded and shipped.
Lots of red faces all around! Lots of cars with lots of people running around pulling furiously on the steering wheels to see if they came off. RECALL
The "designers were highly qualified, highly competant professionals", but that didn't ensure the product met customer or Australian Design Rule (ADR) requirements.
Verification and validation of design are one thing, but in the building industry don't you still check that the construction people build to spec? Girder size, Foundations, Walls, Ties, Wiring, Plumbing?

Think I'll have a risk assessment and a little lie down too!

------------------
Reply With Quote
  #7  
Old 29th February 2000, 08:09 PM
Jase Eyre
Unregistered Guest

 
Posts: n/a
Thumbs up

My thanks to you all for your responses to my question. I have had a lie down and feel much better for it (part of my personal 'Continual Improvement' regime).

Thank you to rrramirez for pointing out the reference to "special processes" in the revision of ISO 9000. There it was all along, right under my nose!

My chief concern in writing my original post revolved around being able to DEMONSTRATE the quality of designs outside the traditional manufacturing paradigm. I think all of your responses have helped.

First of all, the skills and competence of the designers remains (I believe) important at a foundation level (ref: 5.4.2, 6.2, 7.3.2a, 7.5.1, 7.5.5 in the 2000 std). Second, compliance with regulatory requirements (building codes etc)should be demonstrated (7.2.1c, 7.3.2b). Third, the choice of contractors (suppliers), and all communications with them, should be key factors in ensuring the designs are realised as intended: validation of service thus extends beyond the organisation (and beyond Design/Development (7.3) into Service Operations (7.5)).

Taken together, these three factors should prove sufficient, n'est pas?

------------------
JasE
Reply With Quote
  #8  
Old 20th April 2000, 09:12 PM
Alan Cotterell
Unregistered Guest

 
Posts: n/a
I Say...

There is an Australian Standard AS 3905.12 Guide to ISO9000 for architectural and engineering design practices. During the latter stages of production of the standard an argument was put forward to the effect that if a structure was built to all the relevant Australian Standards, design validation would be unnecessary. This argument effectively puts certain liability aspects back onto the Standards organisation. My feeling is that this approach is simply another example of engineers 'covering their backsides'. Notwithstanding this some years ago there was a wage case before the Arbitration Commission in which engineers recived a loading for the extra risk they took when these sorts of responsibilities arose. (Perhaps they want to give the money back).
I suggest there is a responsibility (duty of care)to test structures (bearing in mind that each building is in some way a prototype). Perhaps wind tunnel testing of models is acceptable as a form of validation.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 9001 - Quality Management Systems Standard

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Is ESD (Electro-Static Discharge) a Special Process under ISO 9001:2000? edward.gibbs ISO 9001 - Quality Management Systems Standard 32 10th October 2009 09:21 PM
ISO 9001:2000 - Clause 4.1 - How to control outsourced processes? TBR01 ISO 9001 - Quality Management Systems Standard 4 10th November 2005 12:07 PM
ISO 9001-2000-- Validation of Processes Dave N-2007 ISO 9001 - Quality Management Systems Standard 7 6th February 2003 04:45 PM
ISO 9001:2000 - Types of Processes Other Than Product Realisation Processes M Greenaway ISO 9001 - Quality Management Systems Standard 53 20th November 2002 01:47 PM
ISO 9001:2000 Processes and Procedures sridhar ISO 9001 - Quality Management Systems Standard 4 11th November 2001 12:15 AM



The time now is 04:23 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts