The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > Definitions, Acronyms, Abbreviations and Interpretations

Elsmar Cove Forum Visitor Notices


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 7th April 2000, 10:44 AM
Mike525
Unregistered Guest

 
Posts: n/a
Red Face Key Process Equipment (KPE) - Some criteria and / or a good definition

I'm looking for some criteria and / or a good definition of Key Process Equipment (KPE) as identified in 4.9.g.1 of the QSR for QS9K. We're trying to come to grips with evaluating tooling wear on KPEs, but the criteria that we established - run 2 shifts, 5 days per week - literally includes every piece of equipment in our plant (last count I think it was 2000 pcs of KPE). Some ideas I'm tossing around are - would it affect shipment to the customer; is there duplication of the process; what is the worst case scenario for mean time to repair. Any other ideas or thoughts on this would be greatly appriciated.
Reply With Quote

Sponsored Links
  #2  
Old 8th April 2000, 11:22 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

You're on the right track. Fork trucks are generally duplicated - even so you can typically get a replacement the same day. If you have a pick-and-place, it may be the only one so it better be 'watched' closely.

Also consider bottle necks. If your 'weak link' is prep for the pick-and-place, it may be the prep is more important (or as important) to address.

Do remember there is a limit. You cannot back up every piece of equipment or have 'adequate' spare parts for every piece of equipment. This is similar to how you have to look at contingency plans. How can you plan for a hurricane or tornado or earth quake?

There are some things that you can trade off. There may be no need to keep a spare motor on hand if it can be purchased from Grainger (or other distributor or supplier) in a few hours or a day. If you have 2 mixers that run 10 hours a day, if one goes down the other can handle the volume by running 20 hours a day until the broken one is fixed.

A lot of this is 'common sense' decisions by you.
Reply With Quote
Sponsored Links

  #3  
Old 9th April 2000, 01:03 PM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
I Say...

I agree with the "common sense." Where I used to work I had alot of people trying to convince me that Key process equipment was where KEy Product characteristics were manufactured!! I final convinced them that the word KEY didn't automatically link the 2 requirements. We had a 300 ton punch press, and hundreds of smaller ones. The only Key equipment in that department was the 300 ton one. One furnace in die cast, but alot of die cast machines. The furnace was 'key'. (Even then it got debated because we could have bought trucks of molten aluminum.)
Reply With Quote
  #4  
Old 14th May 2007, 12:43 PM
Manix's Avatar
Manix Manix is offline
Get Involved!!!

Registration Date: Dec 2004
Location: UK, Hampshire
 
Posts: 489
Thanks Given to Others: 100
Thanked 82 Times in 63 Posts
Karma Power: 45
Karma: 788
Manix is appreciated, and has over 700 Karma points.Manix is appreciated, and has over 700 Karma points.Manix is appreciated, and has over 700 Karma points.Manix is appreciated, and has over 700 Karma points.Manix is appreciated, and has over 700 Karma points.Manix is appreciated, and has over 700 Karma points.Manix is appreciated, and has over 700 Karma points.
Send a message via Skype™ to Manix
Default Re: Key Process Equipment (KPE) - Some criteria and / or a good definition for TS

Is this still how you define Key Process Equipment or has a guidance emerged from the deepest darkest ISO cellar?

I ask because I am currently looking at a question that I am being asked about TS in prep for some training:

Quote:
Does all equipment have to be included in the preventative maintenance plan? If not what can be left out
The standard, in clause 7.5.1.4, does just state KPE (Key Process Equipment) should be included.

So far my answer is that KPE should be included but no definition of KPE has been provided. Therefore the organisation should consider the following factors when defining what is KPE:

- Time to repair or replace.
- What back ups exist.
- The duplication of the machine and the comparing this with the capacity requirements in terms of whether the other machines could take on the workload successfully.
- Whether this machine is used in a bottleneck operation.
- Whether the machine is used to measure or create significant characteristics.
- The value of the machine, gauge or tool as a piece of capital equipment.
__________________
All things are subject to interpretation whichever interpretation prevails at a given time is a function of power and not truth. - Friedrich Nietzsche
Reply With Quote
Thanks to Manix for your informative Post and/or Attachment!
  #5  
Old 11th September 2009, 03:41 AM
--poy --poy is offline
Involved in Discussions

Registration Date: Mar 2008
Location: Philippines
 
Posts: 23
Thanks Given to Others: 3
Thanked 0 Times in 0 Posts
Karma Power: 7
--poy has disabled his/her Karma.
Default Re: Key Process Equipment (KPE) - Some criteria and / or a good definition

Let me revive this topic.

We've had some short discussion over this same KPE identification in ISO/TS.

For the scheduling process, which is mainly based on a system/software, would you agree to classify the server as a Key Process Equipment?

I personally think it should be and that is why necessary software updates/reviews including hardware maintenance should be in place.

Any other inputs/ideas?

Thanks
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > Definitions, Acronyms, Abbreviations and Interpretations

Bookmarks

Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
What is classified as Key Equipment? slewis FMEA and Control Plans 6 6th April 2006 11:03 PM
OEE definition - Overall Equipment Effectiveness - Definition of A (Availability) DavidB Definitions, Acronyms, Abbreviations and Interpretations 5 10th December 2005 03:41 AM
Seeking: Good process definition (map or whatever) for an installation business M Greenaway ISO 9001 - Quality Management Systems Standard 1 9th March 2005 11:17 PM
Good lead auditor course criteria tarang ISO 19011 and ALL Auditing Discussions 0 20th September 2003 07:22 AM
KEY Supplier - QS-9000 Approved Suppliers - Definition of G.SOMERS Definitions, Acronyms, Abbreviations and Interpretations 2 22nd March 1999 10:19 AM



The time now is 11:53 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts