The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 9001 - Quality Management Systems Standard


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 11th August 2000, 12:12 AM
lmfoong
Unregistered Guest

 
Posts: n/a
Changes to ISO 9001:2000

I seek to obtain advice pertaining to the any significant changes in the revision of ISO 9001:2000 in the following areas :-
1) Involvement of top management
2) Measurement of customer satisfaction and dissatisfaction
3) Continual improvement

------------------
Thanks and Best Regards

lmfoong
Reply With Quote

Sponsored Links
  #2  
Old 14th August 2000, 08:00 AM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

You ought to take a read through Misinterpretation of ISO9K-2K for a sometimes 'spirited' debate on some differences.

Anyone want to contribute some specifics?
Reply With Quote
Sponsored Links

  #3  
Old 16th August 2000, 04:19 AM
Andy Bassett Andy Bassett is offline
An Early Cover

Registration Date: Jun 1999
Location: Donegal Ireland
 
Posts: 278
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 48
Karma: 15
Andy Bassett has less than 100 Karma points so far.
Ill avoid the specifics, but tell you my take on the three points mentioned.

1) Involvement of top management.
I beleive that the new standard strengthens the requirements for management involvement. I understand that they now have to set clear targets for the system and measure them and follow them. Before you could of scraped by with a Quality Policy.
2) Measurement of customer satisfaction and dissatisfaction.
I now understnad that this is a requirement.
3) Continual improvement.
This should automatically come about becuase you are required to measure your processes.

The general discussion is that all this SHOULD have been done before. This is true, but i beleive many companies with the certificate were not doing this.

Regards
------------------
Andy B
Reply With Quote
  #4  
Old 22nd November 2000, 06:04 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Hehehe...

Some thoughts:
******************

From: ISO Standards Discussion
Date: Mon, 9 Oct 2000 13:21:07 -0500
Subject: Re: Q: ISO 9000:1994 Vs. ISO 90002000 /van Putten/Paten

From: "Mike Paten"

Dirk,

I have used Figure 1 of ISO 9001:2000 (the "Process-Based Quality Management System") to depict how the new standard focuses on both "compliance" and "improvement". The following narrative explains:

Assuming that what you "Say You Do" meets the intent of the standards, both the 1994 and 2000 versions require you to "Do What you Say" (implement) and "Prove It" (demonstrate compliance).

The biggest change for 2000 is that you also must "Improve It".

In order to improve you must have "baseline" measures to gage improvement against. Therefore we must develop at least one key performance measure for each of the key QMS processes (or elements) - then we must gather our baseline data and set goals or objectives for improvement based on current performance - then we must take action to improve the processes most in need of improvement - then we must take a look at measureable results to see if actions taken achieved the desired results. Classic stuff.

I advocate that at least two key measures be easily established for each QMS process or element: 1) at least one measure of (in)effectiveness - i.e. something that measures whether (or not) you achieved the overall objective or desired outcome of a particular process; and 2) at least one measure of (in)efficiency - i.e. something that measures how well (or poorly) resources were utilized to achieve the results measured in 1). For example

Clause 6.2.2: Training Processes: Key measures of effectiveness: % employees fully trained and qualified and/or % corrective actions resulting from a lack of training. Key measures of efficiency: % of training completed rated by attendees as marginally satisfactory or worse.

Clause 7.2: Customer Related Processes. Key measures of effectiveness: % customer satisfacation and/or the # of customer complaints. Key measures of efficency: resources dedicated to customer related processes and/or resources devoted to investigating/resolving customer complaints.

Clause 7.3: Design Control Processes. Key measure(s) of effectiveness: Product/Service Performance Measures. Key measures of efficiency: resources devoted to design function and/or resources devoted to design changes resulting from product failures reported from the field.

Clause 7.4: Purchasing Control Processes: Key measures of effectiveness: Supplier performance measures and/or the # corrective actions resulting from incorrect, misidentified or poor quality purhased material. Key measures of efficiency: Resources involved in processing returns and/or supplier corrective actions.

Clause 7.5: Operations Control Processes: Key measures of effectiveness: Product / Service Quality Measures. Key measures of efficiency: defect rate, % scrap, rework, equipment downtime; inventory accuracy, % operations where work instructions or automated process controls are in place.

In any case, these measures should be easy to come up and track. Like most of what ISO has always required - it's not rocket science - just good, down to earth common sense stuff.

Best of luck in the "Move from Conformance to Performance"

Mike Paten
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 9001 - Quality Management Systems Standard

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Summary of Changes - ISO 9001:2000 and ISO 9001:2008 Marc ISO 9001 - Quality Management Systems Standard 154 27th October 2009 12:10 PM
Draft ISO 9001:2008 (Feb 08 version) & Summary of Changes kiwisfly ISO 9001:2008 Status 60 16th November 2008 06:56 AM
ISO 9001-2000 Registered - We received our ISO 9001:2000 certificate yesterday Lauren B. ISO 9001 - Quality Management Systems Standard 30 22nd July 2003 03:51 PM
Summary of Differences and Changes - ISO 9001:1994 and ISO 9001:2000 Marc ISO 9001 - Quality Management Systems Standard 19 31st March 2002 10:14 PM
ISO 9000:2000 Clause 7.3 Design and Development Requirements Summary Andy Bassett Design and Development - Process and Product 23 20th October 2000 01:54 AM



The time now is 08:59 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts