The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 22nd February 2001, 05:29 AM
Nicola G
Unregistered Guest

 
Posts: n/a
Question 7.3 Design and development - Implementing ISO 9001 in the chemicals industry

I am looking for help or sources of information on implementing ISO 9001 in the chemicals industry. So far our manufacturing units are registered to ISO 9002, we are now looking to register our R&D centre, which will mean we must cover the Design and development section for the first time. Can any one provide some pointers how this can be done in this sector?
Reply With Quote

Sponsored Links
  #2  
Old 23rd February 2001, 01:00 AM
Greg Mack's Avatar
Greg Mack Greg Mack is offline
Inactive Registered Visitor

Registration Date: Feb 2001
Location: Brisbane, Qld Australia
 
Posts: 71
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 37
Karma: 10
Greg Mack has less than 100 Karma points so far.
BIG Smile

Hi Nicola,

Why don't you just document what they do in the R&D Team and then see where you do not meet the intent of the Standard. Then it will be easier to see where you need to improve your processes based on 9001.
Reply With Quote
Sponsored Links

  #3  
Old 27th December 2001, 04:50 PM
HFowler's Avatar
HFowler HFowler is offline
Involved - Posts

Registration Date: Aug 2001
Location: Rutherfordton, NC
 
Posts: 131
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 36
Karma: 15
HFowler has less than 100 Karma points so far.
Question Design Review Forms

I came from a metalworking background into an electronics and computer software environment. Our company has been doing business for over (20) years, but I am implementing their first documented quality management system.

I am looking for some sample "Design Review" forms that would be specific to the development of software and electronics. I am having difficulty explaining how to document Design and Development Reviews, Verification, Validation and Control of Changes. I think we need some standardization rather than each engineering group doing their own thing.

Any help is greatly appreciated.

Hank Fowler
__________________
Insanity - believing results can be changed without changing the processes that create them.
Reply With Quote
  #4  
Old 3rd January 2002, 07:42 PM
E Wall's Avatar
E Wall E Wall is offline
Just Me!

Registration Date: Jun 2001
Location: Southeast USA
 
Posts: 482
Thanks Given to Others: 67
Thanked 26 Times in 21 Posts
Karma Power: 63
Karma: 977
E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.
Default Just a bump up...

Just wanted to bump this up.

Hank, sorry I don't have an answer for you but will give it some thought and let you know what I come up with.
Reply With Quote
  #5  
Old 4th January 2002, 09:51 AM
HFowler's Avatar
HFowler HFowler is offline
Involved - Posts

Registration Date: Aug 2001
Location: Rutherfordton, NC
 
Posts: 131
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 36
Karma: 15
HFowler has less than 100 Karma points so far.
Red Face

Thanks Eileen, I really could use some good information in this area.

Are you still enjoying snow? We have 4-6 inches, but it was as hard as ice at 18 degrees this morning.
__________________
Insanity - believing results can be changed without changing the processes that create them.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Design and Development vs. Production - ISO 9001 Clauses 7.3 vs. 7.5.1 intrestedparty Design and Development - Process and Product 8 24th July 2009 02:02 AM
Auditing of D&D (Design and Development) - ISO 9001 vijaysonawane ISO 19011 and ALL Auditing Discussions 12 5th January 2009 09:39 AM
Implementing ISO 9001 in a services industry YKT Service Industry Specific Topics 10 25th December 2006 07:49 AM
Design/Development Output & Verification - ISO 9001 7.3.3 Design & Development Output Curt72 Design and Development - Process and Product 1 24th March 2006 08:03 PM
Implementing ISO 14000 - Currently ISO 9001 Registered - Development Schedule mike101338 ISO 14001 and Environmental Related Standards 7 24th June 2004 04:18 AM



The time now is 06:00 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts