The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 12th April 2001, 04:12 PM
Wallace MD
Unregistered Guest

 
Posts: n/a
Bomb! Custom production shop with design changes

New user here...

We are a lean custom equipment design and manufacture division. After design output (ala drawings) are verified and approved for manufacture, the responsible production lead person does what he has to do to get the equipment built...the show must go on!

If he notes an error in the drawing/ schematic, but he is qualified to make necessary changes to make it work (e.g. different size bolt or electronic component), do we have to go through the complete design review mill before he resumes production?

Changes would be recorded on the drawing by the lead person and forwarded to design for revision at a later date.
Reply With Quote

Sponsored Links
  #2  
Old 12th April 2001, 05:44 PM
energy
Unregistered Guest

 
Posts: n/a
Wallace,
We currently do the same thing you are doing. It is called "as-built". The customer understands that this is the norm, and that they will get a full set of up to date drawings that reflect just how their equipment was built. The difference here is that the Project Engineer is involved with the project from start to finish. That foregoes, in our opinion, any further design review. After all, the PE has approval on all changes. Our assemblers, welders, etc., are empowered to find ways to do it easier, faster or better. They just have to clear it with the Engineer. Works very well. You have to be careful if you work with customer drawings, or they require approval on changes you have have previously submitted.
This is only for situations such as you describe. Hole sizes, hardware, structural modifications (weldments). Major component or design revisions are strictly engineering functions which includes another review of the design. So, IMHO, as long as approval authority (Engineering) is aware of minor changes that will be addressed at a later date, no full blown design review is necessary. Just state your practice in your "Design Control" procedure. You call the shots.
Reply With Quote
Sponsored Links

  #3  
Old 13th April 2001, 07:06 PM
Dan Larsen
Unregistered Guest

 
Posts: n/a
I think what you're doing is fine. Changes during production on your product should be expected, and you've limited the approval for changes. Make sure the changes are noted as to what they are and who made them, then have a final review after production is complete where the "design team" signs off and approves the changes based on final inspection/test results.

This should easily pass muster in the APQP type design flow (the review is the "feedback" part of the loop).
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Custom DOE (Design of Experiments) Analysis in JMP Raquel Quality Tools, Improvement and Analysis 7 8th September 2009 09:59 PM
Operator Break Coverage - Custom injection mould shop DanteCaspian Manufacturing and Related Processes 9 4th August 2009 10:05 PM
Final inspection process design for a machine shop setting. sativ Inspection and Test, Sampling and Related Topics 21 17th April 2009 08:17 AM
Effective production control - Records that you maintain on the shop floor Andrews Records and Data - Quality, Legal and Other Evidence 1 14th March 2003 12:42 PM
Sample Size and Frequency - In-process monitoring in a mass production shop Andrews SPC Monitoring and Statistical Analysis Techniques 2 10th October 2001 10:30 AM



The time now is 06:04 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts