The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Quality Tools, Improvement and Analysis


The Elsmar Cove Forum SideBar!
Thread Tags
Tag Cloud
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link











$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World

Tags
casting inclusions, castings, process improvement, processes
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 26th February 2008, 05:44 AM
achorste's Avatar
achorste achorste is offline
Involved in Discussions

Registration Date: Sep 2007
Location: UK
 
Posts: 185
Thanks Given to Others: 44
Thanked 81 Times in 44 Posts
Karma Power: 29
Karma: 707
achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.
Please Help! Process Improvement Team - Where to Start - Looking at Casting Inclusions

Good morning All (I always seem to come here for advice!)

I just started a new job a month ago with a new company (actually my last companies biggest rivals ), anyway, I've been asked to set up an improvement team looking at casting inclusions. The company I work for hasn't had much experience at all when it comes to formal problem solving and process improvement.

I've done my Green Belt and a few more projects & I've used a fair few of the other tools & techniques however I've never properly led a project myself (the green belt project were kinda hijacked by my old boss )

I guess what I'm asking is - where the hell do I start? I've got the team, I've got a meeting set up for Friday morning, however, how do I kick it off?

Many thanks for ANY help you could give,

Tony
Reply With Quote

Sponsored Links
  #2  
Old 26th February 2008, 06:45 AM
tony wardle's Avatar
tony wardle tony wardle is offline
Registered Visitor

Registration Date: May 2005
Location: South Africa
 
Posts: 46
Thanks Given to Others: 9
Thanked 18 Times in 13 Posts
Karma Power: 26
Karma: 227
tony wardle is appreciated, and has over 200 Karma points.tony wardle is appreciated, and has over 200 Karma points.tony wardle is appreciated, and has over 200 Karma points.
Default Re: Process Improvement Team Help!

Gee - sounds like the situation I am in at the moment. I must say, my solution is not to be found in any magical book or course, but it works for me.

Best advice that I can offer is :-
1. First understand the process - I usually get the team to tell me how it actually works (as opposed to how we hope it should work).
2. Write up the process as a flow diagram - making sure you have who does what, how. If there are measurements - put them in, making sure you know what course is followed if the measurement is out of spec.
3. Get the team together and start at 1. You find descrepancies. Get the true flow sorted.
4. With the flow diagram, you should have no open ended flows. If you do - this is part of the problem to be fixed.
5. Now that you have the blue print of what actually happens you can mark areas of comcern on your diagram and work on those.
6. Make one change at a time - get agreement from the team, and monitor the effect. The result must be measurable - saved time, money etc.

Improvement has 3 areas - where are we now, where do we want to be, how do we get there? Many people make the mistake of getting excited, determine where they want to be, but because they never found out where they started, they neve actually get to where they want to be. I have made this mistake many times - and it leads to alot of frustration!

Hope this helps?
Reply With Quote
Thank You to tony wardle for your informative Post and/or Attachment!
Sponsored Links

  #3  
Old 26th February 2008, 08:36 AM
Geoff Withnell's Avatar
Geoff Withnell Geoff Withnell is offline
$ Contributor

Registration Date: Jul 2007
Location: Washington, DC, USA
 
Posts: 193
Thanks Given to Others: 2
Thanked 119 Times in 78 Posts
Karma Power: 37
Karma: 1097
Geoff Withnell is appreciated, and has over 900 Karma points.Geoff Withnell is appreciated, and has over 900 Karma points.Geoff Withnell is appreciated, and has over 900 Karma points.Geoff Withnell is appreciated, and has over 900 Karma points.Geoff Withnell is appreciated, and has over 900 Karma points.Geoff Withnell is appreciated, and has over 900 Karma points.Geoff Withnell is appreciated, and has over 900 Karma points.Geoff Withnell is appreciated, and has over 900 Karma points.
Default Re: Process Improvement Team Help!

Quote:
Originally Posted by achorste View Post

Good morning All (I always seem to come here for advice!)

I just started a new job a month ago with a new company (actually my last companies biggest rivals ), anyway, I've been asked to set up an improvement team looking at casting inclusions. The company I work for hasn't had much experience at all when it comes to formal problem solving and process improvement.

I've done my Green Belt and a few more projects & I've used a fair few of the other tools & techniques however I've never properly led a project myself (the green belt project were kinda hijacked by my old boss )

I guess what I'm asking is - where the hell do I start? I've got the team, I've got a meeting set up for Friday morning, however, how do I kick it off?

Many thanks for ANY help you could give,

Tony
Tony,
The very first thing you need to do is establish your charter. It does not need to be a formal document, although I personally think that is best. But you do need to establish several things which will guide your team in its work:

1. What is your scope? You mention casting inclusions. Are you also going to work on voids? What about segregation? The scope not only tells what is your problem, it tells you what ISN'T your problem. This allows you to say "No" to someone who is trying to give you a bad case of "scope creep".

2. What is the business case for doing this work? What is is costing, in nonconformances, time, missed deliveries, or whatever. This lets you and your team know how important the work is, and how many resources and how much cash it is reasonable to expend fixing the problem.

3. Who is the process owner? When your team is done, who is going to be using your solutions on an ongoing basis? The process owner has to buy in to your solutions, or your project has no long term future.

Get your team's buy in on the charter, take it back to your champion/management and get their explicit approval. I emphasize explicit, because sadly, management has a tendency to "forget" that they have committed to support a team. Now you are ready to measure your current state, analyze the problems for root cause, develop ways to improve and implement controls to maintain the gains. Sound familiar?

Getting your scope and business case defined is usually a good kick off for a first meeting, since it gets everyone on the team on the same page.
Geoff Withnell
Reply With Quote
Thanks to Geoff Withnell for your informative Post and/or Attachment!
  #4  
Old 26th February 2008, 08:59 AM
antoine.dias's Avatar
antoine.dias antoine.dias is offline
Involved in Discussions

Registration Date: Feb 2002
Location: Belgium
 
Posts: 468
Thanks Given to Others: 272
Thanked 137 Times in 89 Posts
Karma Power: 84
Karma: 2013
antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to antoine.dias
Default Re: Process Improvement Team - Where to Start - Looking at Casting Inclusions

On top of the previous posters:

- Get the team to search for causes of the inclusions.
- ( visualise the causes in an Ishikawa or fishbone diagram )
- Attack them one by one.
- Check the effectiveness of the actions taken.
- Look for further improvements.

Lots of success,

Antoine
Reply With Quote
Thanks to antoine.dias for your informative Post and/or Attachment!
  #5  
Old 26th February 2008, 11:57 AM
michellemmm's Avatar
michellemmm michellemmm is offline
Quest For Quality

Registration Date: Aug 2006
Location: USA
 
Posts: 200
Thanks Given to Others: 290
Thanked 88 Times in 54 Posts
Karma Power: 26
Karma: 273
michellemmm is appreciated, and has over 200 Karma points.michellemmm is appreciated, and has over 200 Karma points.michellemmm is appreciated, and has over 200 Karma points.
Send a message via AIM to michellemmm
Default Re: Process Improvement Team - Where to Start - Looking at Casting Inclusions

Quote:
Originally Posted by achorste View Post

Good morning All (I always seem to come here for advice!)

I just started a new job a month ago with a new company (actually my last companies biggest rivals ), anyway, I've been asked to set up an improvement team looking at casting inclusions. The company I work for hasn't had much experience at all when it comes to formal problem solving and process improvement.

I've done my Green Belt and a few more projects & I've used a fair few of the other tools & techniques however I've never properly led a project myself (the green belt project were kinda hijacked by my old boss )

I guess what I'm asking is - where the hell do I start? I've got the team, I've got a meeting set up for Friday morning, however, how do I kick it off?

Many thanks for ANY help you could give,

Tony
Hi Tony,
It has been a loooooooooong time since I have worked in a foundry. Let me try to help.

You did not mention what type of casting or metal....Sand casting, permanent mold, investment, dry sand, green sand, etc....Are you involved in steel foundry?

My experience is in steel foundry....

The source of inclusion in steel casting can be attributed to design and process. Therefore, I strongly suggest to start PFMEA and DFMEA. Put a team together. You will be amazed to see how opinions differ without factual data.

Let me give you a quick start and talk about sand casting in steel foundry:
Inclusion in castings can be attributed by factors such as oxidation and sand and other processig material.
  • Oxidation
    • Design of sprue causing whirlpool effect, introducing excessive oxygen.
    • Design of ladle. Bottom pour ladles are preferred. Teapot design is also good.
    • Pouring rate. Slow pouring introduces oxygen. I remember there was a rule of thumb that correlated the size of casting with pouring time and one was the square root of another. I cannot remember the exact formula. Fast pouring can also creates splash.
    • Size of ladle should be suitable for the operation/batch size and quantity. For example, if you have too many small molds, you need to optimize floor to floor time and pour as fast as possible with minimum number of ladles. Bad scheduling attributes to inclusion. You might want to design an experiment and optimize permutation and combination.
    • Large molds need to be poured first and then the small ones.
    • Ladle quality is very important. Sand and inclusion on the bottom of the ladles attribute to forign material inclusion.
    • Reusing ladles too many times introduces oxides. You need to find an optimum number suitable for your operation.
    • Lining too many ladles in advance is not a good idea.
    • Thermocouple cap can be reused two or three times. Controlling the number of usage is difficult. If the thermocouple cap is used too many times, it gives an inaccurate reading, hence slowing the pouring process.
    • The pouring rate is also related to defects such as pour short and cold weld.
    • Introduction of aluminum powder to the top of molten metal reduces the oxides. The amount should be calculated and monitored.
    • Consider performing DOE or correlation analysis between the metal chemistry, casting size, and other factors.
  • Sand inclusion can be due to bad pattern design (gate/in gate, hot metal zone, abration, slow flow rate) or sand chemistry, or mold/core quality.
    • If you make you molds or cores days in advance and they absorb moisture from the humid environment, the chemical bond between sand grains starts to break down and when they hit molten metal, they get washed into the molten metal stream.
    • excessive temperature of molten metal can also break down the bond between the sand particles.
    • improper chemistry between the binders can create a weak bond.
    • sand size and geometry can also effect inclusion.
    • dirty pattern (cope and drag) make sand stick to the pattern and create weak bond for the sand. Patterns need to be sand blasted after so many molds or you pay for excessive cleaning operation and inclusion.
    • Improper handling of pallets and molds....When pallets are bumped together, sand chunks will fall into the cavity.
    • Excessive force in clamping can introduce micro fractures...
    • Consider setting up a factorial quality rating for core, mold, and casting quality.
    • Review the quality of the wash (protective coating) between cope and drag. If they are not dried up properly, you will have inclusion. If they are alcohol based, excessive alcohol will break down the bond between sand.
I hope this will give you a good start. If you need help, let me know.

Last edited by michellemmm; 26th February 2008 at 12:43 PM.
Reply With Quote
Thank You to michellemmm for your informative Post and/or Attachment!
  #6  
Old 26th February 2008, 10:30 PM
Caster's Avatar
Caster Caster is offline
An Early Cover

Registration Date: Jul 2003
 
Posts: 925
Thanks Given to Others: 206
Thanked 197 Times in 145 Posts
Karma Power: 110
Karma: 3194
Caster is appreciated, and has over 1700 Karma points.
Caster is appreciated, and has over 1700 Karma points.Caster is appreciated, and has over 1700 Karma points.
Default Re: Process Improvement Team - Where to Start - Looking at Casting Inclusions

Tony

Some more ideas (hard to beat michelmm)

Google is your friend, try an advanced search for pdfs. It will more likely return technical papers on your problem.

Look up the foundry associations, they all have numerous books and periodicals (http://www.afsinc.org/)

Call AFS, they have experts on hand to help

Involve your metal supplier, they may have experts

Look to local universities, some will have casting research facilities

Do you run the foundry, or buy from it? If they are the supplier, involve them.

Look to filter suppliers

In a word, look outside your team as well

I once solved a problem with much effort only to find it had been solved years before and was even pictured in a book I had on my shelf....d'oh!
Reply With Quote
Thanks to Caster for your informative Post and/or Attachment!
  #7  
Old 27th February 2008, 12:02 AM
michellemmm's Avatar
michellemmm michellemmm is offline
Quest For Quality

Registration Date: Aug 2006
Location: USA
 
Posts: 200
Thanks Given to Others: 290
Thanked 88 Times in 54 Posts
Karma Power: 26
Karma: 273
michellemmm is appreciated, and has over 200 Karma points.michellemmm is appreciated, and has over 200 Karma points.michellemmm is appreciated, and has over 200 Karma points.
Send a message via AIM to michellemmm
Default Re: Process Improvement Team - Where to Start - Looking at Casting Inclusions

Quote:
Originally Posted by Caster View Post

Google is your friend, try an advanced search for pdfs. It will more likely return technical papers on your problem.

Look up the foundry associations, they all have numerous books and periodicals (http://www.afsinc.org/)

Call AFS, they have experts on hand to help

Involve your metal supplier, they may have experts

Look to local universities, some will have casting research facilities

Do you run the foundry, or buy from it? If they are the supplier, involve them.

Look to filter suppliers

In a word, look outside your team as well

I once solved a problem with much effort only to find it had been solved years before and was even pictured in a book I had on my shelf....d'oh!
Thanks Caster for your post.

Inclusion is an the number one defect in any foundry operation. There are hundreds of sources. Starts from sales and ends at cleaning room. Everyone should get involved and know their role in defect reduction. That is why I suggested to start at FMEA.

There is one point I disagree with you and that is filtering suppliers. Years ago I resolved three critical issues with the help of my suppliers while I was working in a foundry. One of my suppliers was Ashland Chemical ( I don't even know if they still exist). Ashland Chemical used to provide free educational seminars. They knew more about our processes than us and we had a good technical department. The other supplier helped us to establish useful shelf life for adhesives that are used to attach the two half of the core and hence reduce the rate of inclusion. This supplier worked with me designing experiments for different application of wash; spray, mopping, and dipping with different chemistry and viscosities. I personally learned a lot from my suppliers. I even wrote a technical paper and was invited to present it in SME and SFS seminar. (years ago)

Regarding metal suppliers: Most of them are scarp metal dealers and I don't believe they can help much. The right chemistry is produced by combining the metals during the "heat" in furnace...

I strongly suggest contacting current suppliers and potential suppliers and establish a team to participate in inclusion reduction.

Last edited by michellemmm; 27th February 2008 at 12:18 AM.
Reply With Quote
Thanks to michellemmm for your informative Post and/or Attachment!
  #8  
Old 27th February 2008, 02:49 AM
achorste's Avatar
achorste achorste is offline
Involved in Discussions

Registration Date: Sep 2007
Location: UK
 
Posts: 185
Thanks Given to Others: 44
Thanked 81 Times in 44 Posts
Karma Power: 29
Karma: 707
achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.achorste is appreciated, and has over 700 Karma points.
Default Re: Process Improvement Team - Where to Start - Looking at Casting Inclusions

Well bugger me - I didn't expect this much help! Thank you everyone!

To answer a few questions:

It is investment casting (lost wax method) of Cobalt Chrome in small moulds.

The scope is looking at inclusions causing non-conforming parts after machining & polishing. Not a particular type of defect. Although I can already see this becoming too broad - I may well just concentrate on ceramic inclusions - supposedly the most prominent however I fear they may have been mis-diagnosed.

The foundry is in-house.

Thank you again for all your help!

Last edited by achorste; 27th February 2008 at 03:14 AM.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Quality Tools, Improvement and Analysis

Bookmarks

Tags
casting inclusions, castings, process improvement, processes


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
The 3 Biggest Obstacles You Faced when you start to apply improvement projects yassser33 Six Sigma 24 16th March 2009 11:26 AM
Jump Start Continual Improvement Process - What works? reigelser Preventive Action and Continuous Improvement 9 14th September 2007 02:10 PM
ASQ Team Excellence Award Process - Is your Team world class? Honor your Team! Stijloor ASQ, IRCA, IATF, RABQSA, and Related Organizations 1 10th August 2007 02:19 PM
Casting defect in brass gravity die casting - Manufacturer of taps, faucets mantu2k Manufacturing and Related Processes 4 25th April 2006 08:16 PM
Tools for improvement team - Review all shifts, operations and processes C Emmons Quality Tools, Improvement and Analysis 7 3rd January 2006 02:10 PM



The time now is 05:29 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

If you are having problems Registering, Activating your Registration, or other problems, you can phone me in the US. I'm not here 24/7/365, but if I'm here I'll try to help.
The Elsmar Cove Web Site is *CopyFree*
no new posts