The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Human Factors and Ergonomics in Engineering


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 21st March 2008, 04:01 AM
Osman Osman is offline
Involved in Discussions

Registration Date: Jul 2006
Location: UAE
Age: 27
 
Posts: 15
Thanks Given to Others: 7
Thanked 0 Times in 0 Posts
Karma Power: 14
Karma: 10
Osman has less than 100 Karma points so far.
Please Help! Queueing Theory - Required Time to Load a Container

Queuing theory

Hello Dears

Can you help in this case which related to logistic (loading a container?)
I have to load a container which has a capacity of = 2184 cubic ft,
((L x W x D) = 39’ x 7’ x 8’). To load the container I’ll use a trolley which has a capacity of = 230 cubic ft, I also designed a ramp so that the trolley will elevate or lift up to the container.

I calculated following timings
Trolley loading time = 4 mints
Trolley traveling time from warehouse to dock area = 1.20 mints
Trolley lift up time (thorough ramp) to container = 30 sec (0.5 mints)
Trolley unloading time = 3 mints
Trolley lift down (thorough ramp) from container = 15 sec
Total time = cycle time of one trolley = (4 + 1.20 +0.30 + 3 + 0.15) = 8.65 mints.

 I want to calculate the required time to load the whole container, now current loading time of container is 2.5 hours (without the ramp) by hands. And I has been asked to make it in 15 mints onlyyyyyyy !!!!!

 How money trolleys I will need for this task

 Note I have 6 to 10 manpower (loaders).

waiting for your advise
thanks

Last edited by Osman; 22nd March 2008 at 05:02 PM. Reason: revising loading time of trolley and container
Reply With Quote

Sponsored Links
  #2  
Old 21st March 2008, 10:40 AM
Randy's Avatar
Randy Randy is offline
Super Moderator

Registration Date: Jun 1999
Location: Greenwood (Ft Smith area), Arkansas, USA
Age: 58
 
Posts: 6,224
Thanks Given to Others: 33
Thanked 1,248 Times in 807 Posts
Karma Power: 397
Karma: 11534
Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.
Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Randy
Default Re: Queueing theory

About 1.25 hours (72 minutes give or taking time for people to catch their breath)
__________________
None of us is as smart as all of us...Ken Blanchard
Reply With Quote
Sponsored Links

  #3  
Old 21st March 2008, 11:53 AM
BradM's Avatar
BradM BradM is offline
Super Moderator

Registration Date: Sep 2006
Location: Arlington,Texas
 
Posts: 3,385
Thanks Given to Others: 814
Thanked 850 Times in 607 Posts
Karma Power: 274
Karma: 9659
BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.
BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.
Default Re: Queueing theory

Quote:
Originally Posted by Osman View Post

Queuing theory

Hello Dears

Can you help in this case which related to logistic (loading a container?)
I have to load a container which has a capacity of = 2184 cubic ft,
((L x W x D) = 39’ x 7’ x 8’). To load the container I’ll use a trolley which has a capacity of = 230 cubic ft, I also designed a ramp so that the trolley will elevate or lift up to the container.

I calculated following timings
Trolley loading time = 3 mints
Trolley traveling time from warehouse to dock area = 1.20 mints
Trolley lift up time (thorough ramp) to container = 30 sec (0.5 mints)
Trolley unloading time = 3 mints
Trolley lift down (thorough ramp) from container = 15 sec
Total time = cycle time of one trolley = (3 + 1.20 +0.30 + 3 + 0.15) = 7.65 mints.

 I want to calculate the required time to load the whole container, now current loading time of container is 2 hours (without the ramp) by hands. And I has been asked to make it in 15 mints onlyyyyyyy !!!!!

 How money trolleys I will need for this task

 Note I have 6 to 10 manpower (loaders).

waiting for your advise
thanks
I have a couple of questions regarding assumptions.

1) Are you sure loading/ unloading times are identical? I would think loading would take a bit longer.

2) Is the rail system circular? Saying, when a trolley is unloaded, does it immediately proceed where it can be loaded again?

3) Does 3 minutes include the time to procure raw material for packing?

4) It just seems (and it very well may be) there are no bottlenecks in the system-unlimited materials, plenty of packers, no obstructions for unloading, etc. How will you keep the trolleys from stacking up?

5) Also, did you calculate Mean Time Between Failures and such? Surely the trolley system does not work perfectly, and it will be down every now and then for repairs.

6) When you measured the times, how did you do that? Saying, keep in the the John Henry theory (or Hawthorne; take your pick) that the times you saw may be ideal; and not represent the realistic time frames. I would also surmise that the loading times will be slower end-of-day than start of day.

I'm just thinking of some variables with the process. If you have adjusted for everything, I think the value Randy gave would be optimal.

Quote:
Originally Posted by Randy View Post

About 1.25 hours (72 minutes give or taking time for people to catch their breath)
Not bad for an old man.
__________________
Brad
My idea of housework is to sweep the room with a glance.
Reply With Quote
  #4  
Old 21st March 2008, 07:39 PM
Steve Prevette's Avatar
Steve Prevette Steve Prevette is offline
Deming Disciple

Registration Date: Feb 2004
Location: Aiken, SC
 
Posts: 1,472
Thanks Given to Others: 60
Thanked 403 Times in 241 Posts
Karma Power: 190
Karma: 6872
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Default Re: Queueing Theory - Required Time to Load a Container

One consideration - you did refer to this as "queuing theory". Generally in queuing theory we model the processes with homogeneous or non-homogeneous poisson processes - that is - taking into account the variability of the timesm and generally related to random arrival processes (which I assume you don't have here).

Have you collected enough data that you could also give the standard deviations of the times? Whether Poisson or not, I assume you want to account for variablity. Your AVERAGE cycle time may work out to be a certain value, but you may want to specify you want to be better than a certain cycle time 95 percent of the time . . .
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
Reply With Quote
Thanks to Steve Prevette for your informative Post and/or Attachment!
  #5  
Old 22nd March 2008, 01:55 PM
Randy's Avatar
Randy Randy is offline
Super Moderator

Registration Date: Jun 1999
Location: Greenwood (Ft Smith area), Arkansas, USA
Age: 58
 
Posts: 6,224
Thanks Given to Others: 33
Thanked 1,248 Times in 807 Posts
Karma Power: 397
Karma: 11534
Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.
Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Randy
Default Re: Queueing Theory - Required Time to Load a Container

Give yourself 1.5 hours to get the job done. Rest and then move on to the other job..........
__________________
None of us is as smart as all of us...Ken Blanchard
Reply With Quote
  #6  
Old 22nd March 2008, 06:27 PM
Osman Osman is offline
Involved in Discussions

Registration Date: Jul 2006
Location: UAE
Age: 27
 
Posts: 15
Thanks Given to Others: 7
Thanked 0 Times in 0 Posts
Karma Power: 14
Karma: 10
Osman has less than 100 Karma points so far.
Default Re: Queueing Theory - Required Time to Load a Container

Hi again
thanks Randy, Steve Prevette & Brad for giving time and advising.

I posted the same case in other forum at the same time … but no one replied me till now , if that show some thing, it shows that elsmar is a unique and its uniqueness come from the professionals like you .. (I hope my English is understood)

Randy I will be thankful if you show me how you calculated the time.
To get the required trolleys I divided container capacity on trolley capacity and I have got around 10 trolleys … to load the container …then I selected 3 trolleys only so the time calculated was around 120 mints I think I have to increase loaders! To minimize the time

Brad … I have studied trolley and container loading time again... You were right loading time is longer than unloading
About other factors like bottleneck and material availability, these do not exist, but I have to consider the fatigue factor/ allowances.

Steve Prevette
Your right….. Variability in arrival time of trolleys almost not exists.
But do you think arrival of trolleys can take any distribution form ?!

Thanks
Reply With Quote
  #7  
Old 22nd March 2008, 06:40 PM
Randy's Avatar
Randy Randy is offline
Super Moderator

Registration Date: Jun 1999
Location: Greenwood (Ft Smith area), Arkansas, USA
Age: 58
 
Posts: 6,224
Thanks Given to Others: 33
Thanked 1,248 Times in 807 Posts
Karma Power: 397
Karma: 11534
Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.
Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.Randy is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Randy
Default Re: Queueing Theory - Required Time to Load a Container

All I did was divide the total container size (2184 cu/ft) by the size of the material you could load (230 cu/ft) and that gave me 9+ a bit more (I rounded up to 10 for ease) I then multiplied that by the total time you said the operation took for 1 complete cycle (7.65 min). All the other information was nice but totally non-essential and wasted effort... I just rounded everything off a bit to ease the calculations.

cycle time (X) # of cycles = Total time
__________________
None of us is as smart as all of us...Ken Blanchard
Reply With Quote
Thanks to Randy for your informative Post and/or Attachment!
  #8  
Old 23rd March 2008, 10:42 AM
RLewing RLewing is offline
Involved in Discussions

Registration Date: Sep 2007
Location: Finland
 
Posts: 45
Thanks Given to Others: 16
Thanked 15 Times in 10 Posts
Karma Power: 10
Karma: 89
RLewing has less than 100 Karma points so far.
Default Re: Queueing Theory - Required Time to Load a Container

I do not get a good grasp of your arrangement, but if you can have only one trolley unloading at one time, then you need at least 10*3 minutes for unloading, and even then you need some arrangement where you can switch to another trolley in "no time" (double ramps or something).

If you need to get the time down to 15 minutes, then 30minutes/15minutes = at least 2 trolleys unloading simultaneously (and no time needed for changing trolleys -> 3 ramps).

Is it possible to build some kind of intermediate storage which you could then "dump" to the container?
__________________
"To boldly think where no one has thought before"
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Human Factors and Ergonomics in Engineering

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Closed or Resolved: Page Load Time Marc Forum Suggestions, Complaints, Problems and Bug Reports 9 7th March 2009 02:06 AM
Specifications wanted for bracing international container shipments khamar Various Other Specifications, Standards, and related Requirements 5 4th August 2005 09:47 AM
Gage R&R for effort required to actuate the horn switch with a load cell MedinaJC Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 7 9th February 2004 02:25 PM
Shipping Container Identification - Electronic modules that have 3 types of container Penny Treadwell ISO/TS 16949 - International Automotive Quality Systems Standard 4 31st October 2003 02:16 PM
Control of Quality Records - What is the required retention time? Ram narayan Records and Data - Quality, Legal and Other Evidence 6 15th September 1998 12:15 PM



The time now is 07:07 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts