Queueing Theory - Required Time to Load a Container
Queuing theory
Hello Dears
Can you help in this case which related to logistic (loading a container?)
I have to load a container which has a capacity of = 2184 cubic ft,
((L x W x D) = 39’ x 7’ x 8’). To load the container I’ll use a trolley which has a capacity of = 230 cubic ft, I also designed a ramp so that the trolley will elevate or lift up to the container.
I calculated following timings
Trolley loading time = 4 mints
Trolley traveling time from warehouse to dock area = 1.20 mints
Trolley lift up time (thorough ramp) to container = 30 sec (0.5 mints)
Trolley unloading time = 3 mints
Trolley lift down (thorough ramp) from container = 15 sec
Total time = cycle time of one trolley = (4 + 1.20 +0.30 + 3 + 0.15) = 8.65 mints.
I want to calculate the required time to load the whole container, now current loading time of container is 2.5 hours (without the ramp) by hands. And I has been asked to make it in 15 mints onlyyyyyyy !!!!!
How money trolleys I will need for this task
Note I have 6 to 10 manpower (loaders).
waiting for your advise
thanks
Last edited by Osman; 22nd March 2008 at 05:02 PM.
Reason: revising loading time of trolley and container
|

21st March 2008, 10:40 AM
|
 |
Super Moderator
Registration Date: Jun 1999
Location: Greenwood (Ft Smith area), Arkansas, USA
Age: 58
|
|
Posts: 6,224
Thanks Given to Others: 33
Thanked 1,248 Times in 807 Posts
Karma Power: 397
|
|
Re: Queueing theory
About 1.25 hours (72 minutes give or taking time for people to catch their breath)
__________________
None of us is as smart as all of us...Ken Blanchard
|

21st March 2008, 11:53 AM
|
 |
Super Moderator
Registration Date: Sep 2006
Location: Arlington,Texas
|
|
Posts: 3,385
Thanks Given to Others: 814
Thanked 850 Times in 607 Posts
Karma Power: 274
|
|
Re: Queueing theory
Quote:
Originally Posted by Osman
Queuing theory
Hello Dears
Can you help in this case which related to logistic (loading a container?)
I have to load a container which has a capacity of = 2184 cubic ft,
((L x W x D) = 39’ x 7’ x 8’). To load the container I’ll use a trolley which has a capacity of = 230 cubic ft, I also designed a ramp so that the trolley will elevate or lift up to the container.
I calculated following timings
Trolley loading time = 3 mints
Trolley traveling time from warehouse to dock area = 1.20 mints
Trolley lift up time (thorough ramp) to container = 30 sec (0.5 mints)
Trolley unloading time = 3 mints
Trolley lift down (thorough ramp) from container = 15 sec
Total time = cycle time of one trolley = (3 + 1.20 +0.30 + 3 + 0.15) = 7.65 mints.
I want to calculate the required time to load the whole container, now current loading time of container is 2 hours (without the ramp) by hands. And I has been asked to make it in 15 mints onlyyyyyyy !!!!!
How money trolleys I will need for this task
Note I have 6 to 10 manpower (loaders).
waiting for your advise
thanks
|
I have a couple of questions regarding assumptions.
1) Are you sure loading/ unloading times are identical? I would think loading would take a bit longer.
2) Is the rail system circular? Saying, when a trolley is unloaded, does it immediately proceed where it can be loaded again?
3) Does 3 minutes include the time to procure raw material for packing?
4) It just seems (and it very well may be) there are no bottlenecks in the system-unlimited materials, plenty of packers, no obstructions for unloading, etc. How will you keep the trolleys from stacking up?
5) Also, did you calculate Mean Time Between Failures and such? Surely the trolley system does not work perfectly, and it will be down every now and then for repairs.
6) When you measured the times, how did you do that? Saying, keep in the the John Henry theory (or Hawthorne; take your pick  ) that the times you saw may be ideal; and not represent the realistic time frames. I would also surmise that the loading times will be slower end-of-day than start of day.
I'm just thinking of some variables with the process. If you have adjusted for everything, I think the value Randy gave would be optimal.
Quote:
Originally Posted by Randy
About 1.25 hours (72 minutes give or taking time for people to catch their breath)
|
Not bad for an old man. 
__________________
Brad
My idea of housework is to sweep the room with a glance.
|

21st March 2008, 07:39 PM
|
 |
Deming Disciple
Registration Date: Feb 2004
Location: Aiken, SC
|
|
Posts: 1,472
Thanks Given to Others: 60
Thanked 403 Times in 241 Posts
Karma Power: 190
|
|
Re: Queueing Theory - Required Time to Load a Container
One consideration - you did refer to this as "queuing theory". Generally in queuing theory we model the processes with homogeneous or non-homogeneous poisson processes - that is - taking into account the variability of the timesm and generally related to random arrival processes (which I assume you don't have here).
Have you collected enough data that you could also give the standard deviations of the times? Whether Poisson or not, I assume you want to account for variablity. Your AVERAGE cycle time may work out to be a certain value, but you may want to specify you want to be better than a certain cycle time 95 percent of the time . . .
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
|
|
Thanks to Steve Prevette for your informative Post and/or Attachment!
|
|

22nd March 2008, 01:55 PM
|
 |
Super Moderator
Registration Date: Jun 1999
Location: Greenwood (Ft Smith area), Arkansas, USA
Age: 58
|
|
Posts: 6,224
Thanks Given to Others: 33
Thanked 1,248 Times in 807 Posts
Karma Power: 397
|
|
Re: Queueing Theory - Required Time to Load a Container
Give yourself 1.5 hours to get the job done. Rest and then move on to the other job..........
__________________
None of us is as smart as all of us...Ken Blanchard
|

22nd March 2008, 06:27 PM
|
|
Involved in Discussions
Registration Date: Jul 2006
Location: UAE
Age: 27
|
|
Posts: 15
Thanks Given to Others: 7
Thanked 0 Times in 0 Posts
Karma Power: 14 Karma: 10 
|
|
Re: Queueing Theory - Required Time to Load a Container
Hi again
thanks Randy, Steve Prevette & Brad for giving time and advising.
I posted the same case in other forum at the same time … but no one replied me till now , if that show some thing, it shows that elsmar is a unique and its uniqueness come from the professionals like you  .. (I hope my English is understood  )
Randy I will be thankful if you show me how you calculated the time.
To get the required trolleys I divided container capacity on trolley capacity and I have got around 10 trolleys … to load the container …then I selected 3 trolleys only so the time calculated was around 120 mints  I think I have to increase loaders! To minimize the time
Brad … I have studied trolley and container loading time again... You were right loading time is longer than unloading
About other factors like bottleneck and material availability, these do not exist, but I have to consider the fatigue factor/ allowances.
Steve Prevette
Your right….. Variability in arrival time of trolleys almost not exists.
But do you think arrival of trolleys can take any distribution form ?!
Thanks
|

22nd March 2008, 06:40 PM
|
 |
Super Moderator
Registration Date: Jun 1999
Location: Greenwood (Ft Smith area), Arkansas, USA
Age: 58
|
|
Posts: 6,224
Thanks Given to Others: 33
Thanked 1,248 Times in 807 Posts
Karma Power: 397
|
|
Re: Queueing Theory - Required Time to Load a Container
All I did was divide the total container size (2184 cu/ft) by the size of the material you could load (230 cu/ft) and that gave me 9+ a bit more (I rounded up to 10 for ease) I then multiplied that by the total time you said the operation took for 1 complete cycle (7.65 min). All the other information was nice but totally non-essential and wasted effort... I just rounded everything off a bit to ease the calculations.
cycle time (X) # of cycles = Total time
__________________
None of us is as smart as all of us...Ken Blanchard
|
|
Thanks to Randy for your informative Post and/or Attachment!
|
|

23rd March 2008, 10:42 AM
|
|
Involved in Discussions
Registration Date: Sep 2007
Location: Finland
|
|
Posts: 45
Thanks Given to Others: 16
Thanked 15 Times in 10 Posts
Karma Power: 10 Karma: 89 
|
|
Re: Queueing Theory - Required Time to Load a Container
I do not get a good grasp of your arrangement, but if you can have only one trolley unloading at one time, then you need at least 10*3 minutes for unloading, and even then you need some arrangement where you can switch to another trolley in "no time" (double ramps or something).
If you need to get the time down to 15 minutes, then 30minutes/15minutes = at least 2 trolleys unloading simultaneously (and no time needed for changing trolleys -> 3 ramps).
Is it possible to build some kind of intermediate storage which you could then "dump" to the container?
__________________
"To boldly think where no one has thought before"
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|