The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > The Reading Room


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 2nd April 2008, 01:27 PM
Chris Ely Chris Ely is offline
Inactive Registered Visitor

Registration Date: Dec 2007
Location: Vermont
 
Posts: 5
Thanks Given to Others: 0
Thanked 9 Times in 2 Posts
Karma Power: 8
Karma: 35
Chris Ely has less than 100 Karma points so far.
Lightbulb A TAKT time calculator

Attached
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: xls TAKT_Calc.xls (27.0 KB, 588 views)
Reply With Quote
Thank You to Chris Ely for your informative Post and/or Attachment!

Sponsored Links
  #2  
Old 2nd April 2008, 03:04 PM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default Re: A TAKT time calculator

Hi Chris,

Nice job on the attached file, but I'm going to play devil's advocate here. I am not going to say what is right or wrong, but just throw out an opinion for others to chew on.

I'm curious about your introduction of OEE into the takt calculation. I can understand your thinking, but I'm not sure if it is appropriate since I think it could also force some unwanted behavior.

Technically speaking, if you have an eight hour shift with two fifteen minute breaks then it leaves 450 minutes of production time. If my daily requirement is 450 units, then I need to produce one unit every minute. I'm not really sure how the addition of OEE into the equation really improves it. I would also argue that performing OEE on every piece of equipment that might be in an assembly line or process is a waste in itself.

As for unwanted behavior:

1) The use of OEE can be actually tie up resources doing non-value added data collection and entry. After all, I just need to take a walk to see if material is building up in front of a machine or an operation downstream is being starved of materials.

or

2) How about the possibility of creating an assumption in the workers that, "Since I'm meeting takt, there are no problems."

Thanks for the contribution. As I said, I'm just playing devil's advocate since it ultimately comes down to each company embracing what works best for them.

Wayne
Reply With Quote
Thanks to wmarhel for your informative Post and/or Attachment!
Sponsored Links

  #3  
Old 11th April 2008, 11:27 AM
Chris Ely Chris Ely is offline
Inactive Registered Visitor

Registration Date: Dec 2007
Location: Vermont
 
Posts: 5
Thanks Given to Others: 0
Thanked 9 Times in 2 Posts
Karma Power: 8
Karma: 35
Chris Ely has less than 100 Karma points so far.
Default Re: A TAKT time calculator

Wayne,
Thanks for the response. I agree, using OEE is a questionable practice. I use it to "pad" the numbers a little when I am working with a completely new process. If I am forecasting for a new product line/process I give my self a lower OEE % so that I am working towards a goal that is better than necessary to meet customer demand.
When calculating takt for most processes, I leave OEE at 100%. I sometimes go greater than 100% to establish goals.
Again, thanks for the feedback....hope to have more.
Chris
Reply With Quote
  #4  
Old 8th May 2008, 12:54 PM
AggieRob02 AggieRob02 is offline
E-Mails Invalid or Rejected

Registration Date: May 2008
Location: Houston, TX
 
Posts: 14
Thanks Given to Others: 2
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
AggieRob02 has less than 100 Karma points so far.
Default Re: A TAKT time calculator

Hello. I am new to the Forum and would appreciate some help. I have established timestudies for Work Content/Total Cycle Time for each workstation. The question is that each Station is above the Establish Takt time. Would the number of Stations required be Cycle Time/Takt Time? Also how would you determine the required crew size at each station?

Thanks for the Help,
AggieRob02
Reply With Quote
  #5  
Old 8th May 2008, 01:05 PM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default Re: A TAKT time calculator

Quote:
Originally Posted by AggieRob02 View Post

Hello. I am new to the Forum and would appreciate some help. I have established timestudies for Work Content/Total Cycle Time for each workstation. The question is that each Station is above the Establish Takt time. Would the number of Stations required be Cycle Time/Takt Time? Also how would you determine the required crew size at each station?

Thanks for the Help,
AggieRob02
For a purely manual operation, then yes, the ability to meet takt is: Cycle Time / Takt ?

For semi-automated processes, some stations might be bottleneck operations and will require the use of buffer inventory be kept between the bottleneck and the next operation. If you google DFT or Demand Flow Technology, you should be able to find some materials on this approach which is relatively straightforward.

I've posted a presentation on DFT here for an overview.

Wayne.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: ppt Demand Flow Technology Training.ppt (1.67 MB, 361 views)
Reply With Quote
Thank You to wmarhel for your informative Post and/or Attachment!
  #6  
Old 8th May 2008, 01:35 PM
AggieRob02 AggieRob02 is offline
E-Mails Invalid or Rejected

Registration Date: May 2008
Location: Houston, TX
 
Posts: 14
Thanks Given to Others: 2
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
AggieRob02 has less than 100 Karma points so far.
Default Re: A TAKT time calculator

Thanks for the Prompt response!
Reply With Quote
  #7  
Old 17th May 2008, 04:26 PM
AggieRob02 AggieRob02 is offline
E-Mails Invalid or Rejected

Registration Date: May 2008
Location: Houston, TX
 
Posts: 14
Thanks Given to Others: 2
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
AggieRob02 has less than 100 Karma points so far.
Default Re: A TAKT time calculator

The PFT Powerpoint was great, thanks! However, The Calculation for Manpower variable "L" is unknown. The Total Equation is:

Dr= (Dc x L)/(H x S)

Would you be able to help? I also estimate that Dc represents the Takt Time. Would you please be able to help? Thanks again,

AggieRob02
Reply With Quote
  #8  
Old 17th May 2008, 09:58 PM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default Re: A TAKT time calculator

Quote:
Originally Posted by AggieRob02 View Post

The PFT Powerpoint was great, thanks! However, The Calculation for Manpower variable "L" is unknown. The Total Equation is:

Dr= (Dc x L)/(H x S)

Would you be able to help? I also estimate that Dc represents the Takt Time. Would you please be able to help? Thanks again,

AggieRob02
Dc = Designed Daily Rate at Capacity (The highest targeted daily volume output of products that is planned to be achieved by a Demand Flow manufacturing process.)

L = Labor Content (Time to produce one unit)

H = Hours per Shift

S = # of Shifts

Just make sure you keep the units of time consistent. Don't use five minutes for labor content and eight for hours as an example.

Wayne
Reply With Quote
Thanks to wmarhel for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > The Reading Room

Bookmarks

Tags
demand flow technology, dft, takt, takt time, takt time calculator


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
TAKT Time Calculation - ASQ CSSBB Question QE Six Sigma 2 10th February 2009 02:19 PM
Takt Time vs. Cycle Time vs. Total Cycle Time tomccchang Lean - Lean in Manufacturing and Services 19 7th February 2009 11:05 AM
Usage Log - Calculating Time Difference in Excel - Start time and end time statman78 Excel .xls Spreadsheet Templates and Tools 18 13th January 2009 10:18 AM
Use TAKT time to optimize output of line - TAKT Time .xls qianzhongmin Lean - Lean in Manufacturing and Services 3 7th August 2007 08:43 AM
Calculator for ASQ Exams - I can't use my TI-86 calculator for upcoming ASQ exams! ashlin Professional Certifications and Degrees 3 20th September 2002 02:48 PM



The time now is 01:37 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts