PMA (Parts Manufacture Approval) Dimensional Inspections
I am creating a quality manual and procedures for a new small PMA division of my company and I have questions about suppliers and dimensional inspections. If I am using a supplier I have approved through an audit do I need to re-inspect parts I procure from them if they have done a full dimensional inspection and their quality system is adequate to perform such an inspection.
Where I worked before we inspected every part that came in even it was just inspected by a qualified supplier. It was written into our quality manual to do so but I am not sure if it is an actual requirement. I am currently reading FAA Order 8120.2E Appendix 2 section 6, d. But it is not 100% clear to me.
Thank you,
James
|

22nd July 2008, 06:07 PM
|
 |
Cross Forum Moderator
Registration Date: May 2003
Location: Charlotte, North Carolina.
Age: 61
|
|
Posts: 6,619
Thanks Given to Others: 1,315
Thanked 2,232 Times in 1,595 Posts
Karma Power: 377
|
|
Re: PMA Dimensional Inspections
Quote:
Originally Posted by jameslaz
I am creating a quality manual and procedures for a new small PMA division of my company and I have questions about suppliers and dimensional inspections. If I am using a supplier I have approved through an audit do I need to re-inspect parts I procure from them if they have done a full dimensional inspection and their quality system is adequate to perform such an inspection.
Where I worked before we inspected every part that came in even it was just inspected by a qualified supplier. It was written into our quality manual to do so but I am not sure if it is an actual requirement. I am currently reading FAA Order 8120.2E Appendix 2 section 6, d. But it is not 100% clear to me.
Thank you,
James
|
For our non-aerospace Fellow Covers: " PMA"
Stijloor.
|
|
Thanks to Stijloor for your informative Post and/or Attachment!
|
|

22nd July 2008, 07:15 PM
|
|
Involved in Discussions
Registration Date: Jan 2008
Location: Arizona, USA
|
|
Posts: 16
Thanks Given to Others: 15
Thanked 3 Times in 1 Post
Karma Power: 8 Karma: 15 
|
|
Re: PMA Dimensional Inspections
PMA=Parts Manufacture Approval per FAA Order 8110.42C. Basically aftermarket aerospace parts.
Thank you,
James
|

22nd July 2008, 08:41 PM
|
 |
Moderator here to help
Registration Date: Jan 2006
Location: SoCal
Age: 51
|
|
Posts: 3,839
Thanks Given to Others: 657
Thanked 460 Times in 395 Posts
Karma Power: 191
|
|
Re: PMA Dimensional Inspections
Quote:
Originally Posted by jameslaz
PMA=Parts Manufacture Approval per FAA Order 8110.42C. Basically aftermarket aerospace parts.
Thank you,
James
|
...for Commercial Aircraft. Does not apply to Military Aircraft.
Just for some added clarification.
__________________
"The one thing I want to leave my children is an honorable name." "It is hard to fail, but it is worse never to have tried to succeed." Theodore Roosevelt Chicago, IL, April 10, 1899
|

23rd July 2008, 09:08 AM
|
 |
Moderator
Registration Date: Feb 2001
Location: Grand Rapids, Michigan
Age: 48
|
|
Posts: 483
Thanks Given to Others: 36
Thanked 73 Times in 64 Posts
Karma Power: 64
|
|
Re: PMA (Parts Manufacture Approval) Dimensional Inspections
8100.7C
See section 4, Part B of the Evaluation Criteria........starts with question number 413.
__________________
Quando Omni Flunkus Moritati
|
|
Thanks to BadgerMan for your informative Post and/or Attachment!
|
|

23rd July 2008, 04:46 PM
|
|
Involved in Discussions
Registration Date: Jan 2008
Location: Arizona, USA
|
|
Posts: 16
Thanks Given to Others: 15
Thanked 3 Times in 1 Post
Karma Power: 8 Karma: 15 
|
|
Re: PMA (Parts Manufacture Approval) Dimensional Inspections
Thanks for the information. As I see it per 8100.7C, section 4, part B, question 413 (3) shows I do not need to do another inspection as long as the data (including dimensional inspections) provided by my supplier meets the approved data and is fully reviewed for acceptance and the parts are not an initial lot.
If anyone has any further input I am more than happy to have your advise.
Thank you,
James
|

23rd July 2008, 06:29 PM
|
 |
Registered Visitor
Registration Date: Mar 2006
Location: OH
|
|
Posts: 271
Thanks Given to Others: 5
Thanked 92 Times in 67 Posts
Karma Power: 37
|
|
Re: PMA (Parts Manufacture Approval) Dimensional Inspections
Working with a couple of differant MIDO's ( FAA manufacturing inspction district offices) none have ever had this as an expectation in my experiance. Your facility is always responsable for your suppliers and any supplier under them for the parts that brought into your FAA production approval system. Based on what you document in your system for control of suppliers and receiept of product and materials from them a C of C might all that is needed. In some cases you might want to have ATP or key feature test data supplied and in others you will perform some type of actual inspection upon receipt.
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|