Elsmar Cove Forum Header Graphic The Elsmar Cove Wiki Sitemap More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar Cove Forums Main Page Elsmar Cove Home Page
NQA-USA
Miner's MSA (Measurement Systems Analysis) Blog 
Go Back   The Elsmar Cove Forum > Archived - Students and Educational Institutions > Archived - Student Research Questions - Any Educational Institution
Forum Username

Elsmar Cove Forum Visitor Notice(s)

Wooden Line

Line release of post reflow AOI and AXI

Search the Elsmar Cove
Search Elsmar
Monitor the Elsmar Forum
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page  Elsmar Cove Twitter Feed
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Donate and $ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:

Howard's
International Quality Services
Marcelo Antunes'
SQR Consulting
Bob Doering's
Correct SPC - Precision Machining

NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
 
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  Post Number #1  
Old 15th September 2008, 02:47 PM
Ismir

 
 
Total Posts: 2
Please Help! Line release of post reflow AOI and AXI

Hello everyone!

I'm a student of electrical engineering currently working on a thesis for my BSc degree. It will be about post reflow AOIs and AXIs, and I'd kindly like to ask you for some help with it.

I would like to know if there are any standards according to a line relase of an AOI/AXI for continous production, so basically - how do you test your machine? Do you do an (attribute) gauge R&R? Do you make bad samples for a test? How many, what failures?
If there are any standards where can I read about them? If there are none please help me out: what do you guys do when you do a line release?

Thanks in advance, and please forgive my poor English, I'm not a native speaker.
Ismir

Sponsored Links
  Post Number #2  
Old 15th September 2008, 02:54 PM
CarolX's Avatar
CarolX

 
 
Total Posts: 2,172
Re: Line release of post reflow AOI and AXI

Hi Ismir and Welcome to the Cove,

I can't help you with your question, but I did move your thread to the appropriate board. Since these forums are very active - you need only post your question in one place.
Sponsored Links

  Post Number #3  
Old 15th September 2008, 02:57 PM
Ismir

 
 
Total Posts: 2
Re: Line release of post reflow AOI and AXI

Yeah, I realised that I've posted my thread to the wrong topic after I've posted it.. Sorry 'bout that!
  Post Number #4  
Old 16th September 2008, 12:09 PM
CarolX's Avatar
CarolX

 
 
Total Posts: 2,172
Re: Line release of post reflow AOI and AXI

Quote:
In Reply to Parent Post by Ismir View Post

Yeah, I realised that I've posted my thread to the wrong topic after I've posted it.. Sorry 'bout that!
No problem - all fixed.

Can anyone help this student?
  Post Number #5  
Old 16th September 2008, 07:43 PM
Marc's Avatar
Marc

 
 
Total Posts: 24,480
Re: Line release of post reflow AOI and AXI

Quote:
In Reply to Parent Post by Ismir View Post

AOIs and AXIs
Can you tell me what these are?
  Post Number #6  
Old 16th September 2008, 08:33 PM
Stijloor's Avatar
Stijloor

 
 
Total Posts: 14,711
Re: Line release of post reflow AOI and AXI

Quote:
In Reply to Parent Post by Ismir View Post

Hello everyone!

I'm a student of electrical engineering currently working on a thesis for my BSc degree. It will be about post reflow AOIs and AXIs, and I'd kindly like to ask you for some help with it.
Quote:
In Reply to Parent Post by Marc View Post

Can you tell me what these are?
AOI = automatic optical inspection
AXI = automatic X-ray inspection

Stijloor.
 

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Archived - Students and Educational Institutions > Archived - Student Research Questions - Any Educational Institution

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Final Release Responsibilities - Separate responsibility for the release of a product Denis ISO 9000, ISO 9001, and ISO 9004 - Questions and Discussions 9 29th June 2010 08:33 PM
Engineering Drawing Pre-Release/Advance Release Process COM_DC Documentation Control Systems, Procedures, Forms and Templates 5 6th November 2009 04:42 PM
Batch or Lot release in to market - Need product release procedure class08820 Documentation Control Systems, Procedures, Forms and Templates 3 16th March 2009 03:14 PM
GR&R for an Automatic Optical Inspection Machine (AOI) Karl2109 Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3 1st October 2007 04:16 PM



The time now is 12:14 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272
NOTE: This forum uses "cookies".