The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 14th August 2000, 12:01 PM
Aaron Lupo's Avatar
Aaron Lupo Aaron Lupo is offline
QA-LA

Registration Date: Jan 2000
Location: Rochester, NY
Age: 39
 
Posts: 897
Thanks Given to Others: 5
Thanked 37 Times in 30 Posts
Karma Power: 71
Karma: 722
Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.
Hehehe... Clean Room Gowning Work Instruction - Controlled Document or 'Guideline'?

During an internal audit of one of our facilities I cam across something interesting. As I was doing the audit I cam across a page from one of our SOP’s which was so beautifully blown up and laminated. In short the section explained how the employees entering the room were to gown up (i.e. wash hands, put on hair bonnets, coats, etc…). So I checked the revision level that was on this page, then checked it against the actual SOP, and much to my surprise (not really) the nicely laminated document on the wall was a prior revision. When I pointed this out to the QA Manager she agreed that it needed to be removed (which it still has not been removed a month later), but then said well we can put them up as a guideline but leave the control off of it. Which to that I suggested that she not do that. First of all I explained to her that it is in a SOP, secondly it tells the employee what needs to be done, lastly I asked if you leave it up as a guideline with no control if any changes were made who would know to go change the “guideline”. Well she proceeded to argue that gown up procedures will never change they will always be the same. I politely said that gown up procedures may change they could become more or less stringent, and that if they do change that the “guideline” which would be uncontrolled would also need to be updated and revised according to our procedures. My question is am I wrong about wanting this to be controlled or can a guideline on gown up be left up?
Reply With Quote

Sponsored Links
  #2  
Old 14th August 2000, 04:23 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
My thoughts on this....

The procedure must be controlled. As you stated, this procedure could be changed. But .... IMHO a procedure is useless if kept in a binder on a manager's desk, or on a computer that is not accesible to everyone. I think laminating and posting the procedure is an excellent idea. Now you need to find some agreement with the QA Manager on the control of this document.

Good Luck and hope I didn't confuse the issue more.
Reply With Quote
Sponsored Links

  #3  
Old 14th August 2000, 06:36 PM
barb butrym barb butrym is offline
Courtesy Access

Registration Date: Dec 1998
Location: South Central Massachusetts
 
Posts: 788
Thanks Given to Others: 0
Thanked 15 Times in 12 Posts
Karma Power: 63
Karma: 151
barb butrym is appreciated, and has over 100 Karma points.barb butrym is appreciated, and has over 100 Karma points.
Screw

the control needed is local control.

What i use when i need it...is a tag/label that identifies the document the posting is from, and the current revision level..and that no changes to that information occurred. that gets updated when the SOP does...IF there ever is a change to the gown up protocol...then the posted document will be changed....

Works for me for color coded blown up visual aides mostly, especially when the partial drawing does not show the doc # and rev level....but the principal is the same...just make it easy and do-able

the control belongs to the person that wants it up (ergo LOCAL)...they post it so they take ownership for reviewing changes to the document and updating teh label...and replacing it if needed.

[This message has been edited by barb butrym (edited 14 August 2000).]
Reply With Quote
  #4  
Old 15th August 2000, 07:10 AM
Claes Gefvenberg's Avatar
Claes Gefvenberg Claes Gefvenberg is offline
Forum Administrator

Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 49
 
Posts: 3,771
Thanks Given to Others: 246
Thanked 244 Times in 172 Posts
Blog Entries: 13
Karma Power: 213
Karma: 4951
Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Yes I definitely think it should be controlled.

I'll also have to agree with Carol, and would like to extend the discussion a bit.

This way of presentation makes the procedure far more accessible than a binder. Controlling it something else,however...

We have quite a few documents of this kind, and I'll admit that we used to have a very hard time controlling them. More often than not they proved not to be current versions and / or unauthorized copies.

This is no longer a problem: Every copy of a procedure has a registered owner. We make no difference between binders and wall posters in that respect. A database solved that problem.

We also have all procedures available on our intranet. This is very important as it has enabled us to reduce the number of paper copies significantly.

In short we are hard at work getting the relevant information to the right people, and at the same time getting away from the binder terror. It is admittedly simpler to spread binders all over the place, but this approach works far better for us.

/ Claes
Reply With Quote
  #5  
Old 16th August 2000, 04:37 AM
Andy Bassett Andy Bassett is offline
An Early Cover

Registration Date: Jun 1999
Location: Donegal Ireland
 
Posts: 278
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 48
Karma: 15
Andy Bassett has less than 100 Karma points so far.
I can agree with everyone on this, but at the same time i do have a certain amount of sympathy for the original problem, as i come across it regularly.

Just how detailed do you go with controlling documents? The danger of not controlling is clear, the danger of over- controlling is also clear; people will be petrified of issuing notices/signs/instructions.

What i normally do is create something like a level 4 document called 'Help Instructions'. These fall outside the system and are not signed-off or approved. I just ask that people store them in one folder on a server, so that we can see which is the latest version.
It is amazing how quickly this fills up with useful goodies;
How to get a pool car out.
Which working clothers to wear-when.
How to fill out an expenses form.

Regards


------------------
Andy B

[This message has been edited by Andy Bassett (edited 16 August 2000).]
Reply With Quote
  #6  
Old 16th August 2000, 11:46 PM
David Mullins's Avatar
David Mullins David Mullins is offline
Aussie Bloke

Registration Date: Nov 1999
Location: Adelaide, South Australia, Australia
Age: 47
 
Posts: 495
Thanks Given to Others: 0
Thanked 13 Times in 8 Posts
Karma Power: 51
Karma: 84
David Mullins has less than 100 Karma points so far.
Lurker

Andy,
Your external auditors and consultant customers are happy with you creating uncontrolled guidance documents of this nature?
You might get the auditor to laugh a lot while s/he writes out the nonconformance. I'd say your only hope is to prove that not one of them (the examples you cited) affected quality. This being the case you might be confusing the less learned "quality person" as to what is allowable under the requirements.

------------------
Reply With Quote
  #7  
Old 17th August 2000, 03:00 AM
Andy Bassett Andy Bassett is offline
An Early Cover

Registration Date: Jun 1999
Location: Donegal Ireland
 
Posts: 278
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 48
Karma: 15
Andy Bassett has less than 100 Karma points so far.
Yes David - You are right, such instructions do need to be related to items that dont affect quality.

However the next question is what does actually affect quality? If we wanted to be pedantic we could say that everything in the end can eventually affect quality, even down to the use of pool cars.

I firmly beleive that such instructions do have a place and a useful function in 'De-Hasseling' an organisation by providing guidance on the simple annoying small things of working life.
A look through such a folder in the organisation where i am today shows such items as 'how to handle the introduction of the Euro', 'Installation of a new E mail software>' they received last month 'How to create a serial Newsletter' etc.
If i include these in a QMS as a normal controlled document, the system quickly becomes bogged down and unusable.

Yes the customers are happy, as they have a comprehensive system with levels of complexity according to the need, and yes the auditors are happy unless they see in this area any quality related instructions.



------------------
Andy B
Reply With Quote
  #8  
Old 17th August 2000, 09:24 AM
Aaron Lupo's Avatar
Aaron Lupo Aaron Lupo is offline
QA-LA

Registration Date: Jan 2000
Location: Rochester, NY
Age: 39
 
Posts: 897
Thanks Given to Others: 5
Thanked 37 Times in 30 Posts
Karma Power: 71
Karma: 722
Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.Aaron Lupo is appreciated, and has over 700 Karma points.
Hehehe...

I just want to say thank you to all that have responded so far. I would have to say that gown up procedures to enter a clean room would affect quality if not done properly.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Clean Room Cost per sq foot is to have a class 100,000 clean room built erniel Manufacturing and Related Processes 1 1st April 2009 07:14 PM
Clean Room - Standards or some type of Clean Room Validation - ISO 13485 azaplas ISO 13485 - Medical Devices - Quality Management Systems 15 14th November 2008 04:23 PM
Work Instruction vs. Reference Only document eohara Documentation Control Systems, Procedures, Forms and Templates 26 22nd April 2008 06:56 PM
SOP or system Work Instruction? Controlled Document - Where does one draw the line? Eyespy Documentation Control Systems, Procedures, Forms and Templates 5 26th October 2000 10:42 AM
Is it necessary for every written procedure and work instruction to be controlled? Tom Goetzinger Documentation Control Systems, Procedures, Forms and Templates 2 24th March 1999 10:11 AM



The time now is 05:10 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts