The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Nonconformance and Corrective Action


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 10th February 2000, 12:01 PM
dominick
Unregistered Guest

 
Posts: n/a
Let Me Help You Corrective Action Process Review - Reducing the scope of our NRS

I am currently reviewing our nonconformance reporting system (NRS)and believe our current system allows us to document a wide variety of issues (over 70 reason codes). Our system struggles under this deluge of info. and our resources cannot adequately address all these issues.

I am looking to reduce the scope of our NRS and was hoping for some advice on where to start. What considerations should factor in to the decision-making process when trying to scale down the number of issues we should be looking at as part of our corrective action process.
Reply With Quote

Sponsored Links
  #2  
Old 10th February 2000, 12:38 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Question

You're saying you are 'coding' defect classes, correct? And you have identified 70 categories (classes) of defects?
Reply With Quote
Sponsored Links

  #3  
Old 10th February 2000, 12:54 PM
dominick
Unregistered Guest

 
Posts: n/a
That is correct. These 70 classification codes are grouped under headings that include Packaging, Material, Documentation, Communications, Delevery, etc. The system provides evidence that we cannot effectively address all these issues and my team is looking to restrict the number of instances that can warrant a CAR. But we need to be careful we don't ignore fundamental signals that our system is not healthy. I am looking for thoughts we need to consider before defining what justifies a CAR. Thanks
Reply With Quote
  #4  
Old 10th February 2000, 02:18 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Hey Dominick,

You may want to try the old "80/20" rule. What you want to find are the Vital Few in the Trivial Many. As your program becomes more stable, you may elect to reintroduce some of those you may have been on the fence about removing. Your goal is to increase the efficiency, so your steps towards making it more user friendly should work out.

Additionally, when should a CAR be issued? Many folks don't know the answer, so when in doubt, issue a CAR (in reality as Barb B. says; train, train, train!). This is bad practice. It gives the program a bad taste. Pretty soon, no one reports trouble, because CARs they issued, some for good reason, some not, have gone unanswered for months! Why bother? The system bogs down because there are many useless CARs in the system, no hope for improvement. Again, the Vital Few need consideration. I would also say that "System Knowledge" needs to be taught (my own opinion here).

An example: a CAR is issued by an inside sales associate because someone called up, upset that a product they bought was missing a key piece of hardware. The system that produced the problem operates at 99.98% efficient. Was this a bonified reason to issue the CAR? Things to consider: Severity of the problem, Occurrence of the problem, point of Detection. Looks familiar? It is part of the FMEA risk rating system. Develop an RPN (risk priority number) and address those that require addressing. Again, the 80/20 rule applies. An organization has limited resources, and chasing a shadow won't get it done, only worse!

I inherited a CAR program that had issued 367 CARs in a 6 month period. I went through them all, classified them, and came to the conclusion only about 12 required corrective action. Needless to say, no one was filling out the CARs before, but they fill them out now. They only get them when they are needed.

I'll be out your neck of the woods most of next week, so let's meet at Honey Girls for lunch if you like.

Regards,

Kevin

[This message has been edited by Kevin Mader (edited 10 February 2000).]
Reply With Quote
  #5  
Old 16th February 2000, 08:25 PM
Marloun
Unregistered Guest

 
Posts: n/a
Same problem we are seeing in our plant, Dominick. We have a lot of rejection modes here and it has been standardized already that we require a CAR in every valid rejection seen, specially if the reject was found during QA inspection. What we are currently doing is to segregate the more-serious ones (problems which are most likely to become a customer complaint) from the not-so-serious ones. We only give a disposition on the affected materials for the not-so-serious problems, while the more-serious ones will have to require a corrective and/or preventive action.

Rgds,
Marloun
Reply With Quote
  #6  
Old 16th February 2000, 10:38 PM
Johnny Joe
Unregistered Guest

 
Posts: n/a
Quid Pro Quo

Hello to kevin and others.

I bumped into your forum while deleting old bookmarks off my browser. The caymen cove link still worked after 3 years!

More to topic. I took an interest in two things. #1. Dominic wants to get his data in a fine detail of 70 "things". To me he should keep after them. In any factory that i admire, i really marvel at their attention to detail. That is because they have gotten the easy 80% and were on the last 20%. To get the last 20% you really need detail from all areas, the more the better. Can you imagine the level of detail that is needed when you are working on the last 5% of your i- If you find a way to deal with the data please get back to me........which leads me to #2 which is Kevin's point about inheriting a +350 CAR back log (sounds like maintenance work order system). What's wrong with the +350 Car backlog is our inabilty to digest the data. I have seen the same thing in safety programs that want employees to report even potential hazards (ie air hose are similar in color to the floor. tripping hazard......i don't think the color is the problem). But aside from the pile of work, people....real live employees were reporting stuff. The problem was in what they were told to report or the resources allocated to handle the information or nobody knew what to expect. Maybe that situation arose because people thought the QA dept was a combination maintenance/IT dept!

I think Dominic's solution may lie in relaying the workforce that the CARS are only information on how the systems are working. You can't address all them unless you are "super dept" but you can use them to focus on the critical 12. Ask Kevin the impact of those 12 CARS he distilled from over 350. I would guess pretty good.

Maybe a suggestion: in the paper work it would be clearer if the 70 "things" there were put on say five sheets with only 10 - 15 codes. The writer might have to chose but would be much happier with a clearer and perhaps more specific paper. They could also be dept, site or even classification specific.

Education and delivering a clear understanding that the QA program collects data, analyses it and issues reports on the performance of "systems." It usually doesn't have the stuff to fix them. If these two things are up front I think you will be able to handle all the data.

Greg Jobe

[This message has been edited by Marc Smith (edited 16 February 2000).]
Reply With Quote
  #7  
Old 1st March 2000, 06:39 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Greg,

A nice job of explaining! Your suggestion to compile the data to make it more meaningful is a good one. Working on a QS is never ending. Each NC should be reviewed for its merit and dealt with in a way to make the QS more effective. By itself, it may be meaningless. Get a pile of "hose in the aisleway" notes, you might just want to investigate.

I am glad the shortcut to the Cove still worked. I am impressed with the popularity of Marc's growing creation!

Regards,

Kevin
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Nonconformance and Corrective Action

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
What is the scope of a CAR (Corrective Action Request)? davis007 Nonconformance and Corrective Action 15 20th July 2007 12:55 PM
Reviewing Corrective Action Status for effective Management Review mlthompson Management Review Process 5 28th February 2007 01:55 AM
CAR/PAR (Corrective Action / Preventive Action) process flow - Seeking example Bpoole Nonconformance and Corrective Action 7 31st October 2006 05:23 AM
Management Review Corrective Action - Can I get some clarification on this? Casey Cochran Management Review Process 28 7th March 2006 12:08 AM
Corrective Action and Preventive Action clauses - ISO 9001 - Corrective Action Ace Nonconformance and Corrective Action 6 26th November 2001 01:47 AM



The time now is 10:47 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts