The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Supplier Quality Assurance and other Supplier Issues


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 4th July 2000, 02:42 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Covering Ass Customers as Suppliers

From: ISO Standards Discussion
Date: Mon, 19 Jun 2000 11:39:47 -0500
Subject: Re: Customers as Suppliers /Staples/Naish

<< From: Staples: Has anyone had any experience with customers as suppliers. Chrysler stamps a part which is shipped to my company, welded into our assembly and then sent to a Chrysler assembly plant. I have been accumulating defects from the Chrysler stamper and when pushed, they will give an RMA number for disposition, but I have never yet seen a corrective action report or containment activities. Does anyone have any suggestions? >>

Patricia,

As one auditor recently asked one of my clients: Why don't you stop using them? Just a little humor here folks!! It is not likely that you can do that.

Have you thought about not paying your bills until you get the corrective action? Don't know that it will work. But one of my clients years ago tried it with their customer who in turn didn't pay their bill so it was a tit for tat process that still provided no response.

Years ago when I was at Intel we were in a sort of similar situation. We had a customer who required us to use their bare board supplier. We had continual quality problems with them. What we did was call a meeting including the management, engineering, and quality staff (at least one from each discipline from each company). We sat and discussed the problems, the causes, and agreed on a plan to correct the problems. In our case our customer did not have the capability to correctly generate the film need to ensure proper layer registration and hole alignment. So we agreed to do the artwork at our customer's expense and send it to the supplier. Many but not all the problems went away in this cooperative venture. Perhaps getting a team with at least quality and engineering and production management together from the three facilities even if 2 are the customer's with a brainstorming session may help.

Phyllis Naish
Reply With Quote

Sponsored Links
  #2  
Old 4th July 2000, 02:43 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Covering Ass

From: ISO Standards Discussion
Date: Tue, 20 Jun 2000 09:23:24 -0500
Subject: Re: Customers as Suppliers /Staples/Kiely

From: GKiely

Patricia,

My company laminates material(s) that are used in the production of self-adhesive US postage stamps. Although our customer (a printer/converter) is actually another sub-contractor of the USPS, we still consider the USPS as a customer (and they consider my company as a direct supplier). The Postal Service provides all suppliers with equipment to test and measure the phosphor level of the stamp face paper. This equipment is considered 'customer-supplied product' by the ISO 9001 Quality Standard. As a supplier we have put in place several documented (controlled) procedures to protect this 'product'. These documents include: Operational procedures, calibration procedures, and return procedures. These procedures clearly states "ownership" as well as the requirements on how we as a 'supplier' will protect the device(s) while they are under our control.

Gerry Kiely
Reply With Quote
Sponsored Links

  #3  
Old 20th July 2000, 05:10 PM
Jim Evans
Unregistered Guest

 
Posts: n/a
We have this problem all the time. In fact our two worst suppliers are our two best customers (GM and Ford). More than 92% of our late deliveries of finished product to our customer are because we didn't have the customer supplied component to complete the assembly. On one job last year we were scheduled to deliver finished product in May. We finished our work in April. We were not able to deliver the finished product until after we received the cusomer supplied component in October. This is an extreme case but there have been a number of times when the customer supplied product has been a day or two to more than a week late. Since we are required to use their components this is something we have just learned to live with as we cannot directly control the situation.

Best Regards,

Jim
Reply With Quote
  #4  
Old 21st July 2000, 02:56 PM
AJPaton
Unregistered Guest

 
Posts: n/a
Question

Question: Can you argue that if your customer is your supplier then what you have is really "4.7 Control of customer-supplied product".

If I read it right, you're required to verify, store and maintain this, and report and record any that are lost, damaged or is otherwise unsuitable for use. This puts the onus on the customer to get the delivery right, correct?

AJP
Reply With Quote
  #5  
Old 24th July 2000, 09:12 AM
Jim Evans
Unregistered Guest

 
Posts: n/a
AJ,

Absolutely the onus is one them. My real point is that it wreaks havoc on our scheduling when you set up a production line for a particular job based on the promised delivery of a customer supplied item only to have it not show up. If this performance was from one of our suppliers they would have been off the approved list long ago. But as I said before it is not like we have a choice to go some place else.

Jim
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Supplier Quality Assurance and other Supplier Issues

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Periodic evaluation of suppliers - ISO 17025 4.6 Purchasing services and supplies remedina ISO 17025 - Calibration, Measurement Gages and Test Laboratories 3 15th July 2009 02:08 PM
Disclosing suppliers to customers - PPAP and TS16949 Chrisjohnson1974 APQP and PPAP 5 15th November 2008 12:50 PM
Which supplies/suppliers need to be listed in DMR? jewels ISO 13485 - Medical Devices - Quality Management Systems 4 15th September 2008 02:35 PM
AS9100B, Clause 7.4.1 - Our customers define who most of our suppliers are FrankG Supplier Quality Assurance and other Supplier Issues 3 27th January 2006 10:08 PM
8D process question - Potentially defective product in your customer base awilliam0815 Quality Tools, Improvement and Analysis 4 20th September 2005 10:11 PM



The time now is 04:45 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts