The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Nonconformance and Corrective Action


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 20th July 2000, 02:24 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
Question Paragraph 4.14.3 b) - When is a Preventive Action required?

Can someone help me with this section of the standard. I am confused as to many things.
Example:

Paragraph 4.14.3 b) states "determination of the steps needed to deal with any problems requiring preventive action"

My definition of "preventive" was to take action before a problem occurred. I.E.: Maintainence on equipment, calibration of gages, inspection of raw material before use are some of my examples of preventive actions. Taking action to "deal with any problems" is corrective action in my book.

What am I missing here - any help????

Thanks,

CarolX
Reply With Quote

Sponsored Links
  #2  
Old 20th July 2000, 03:17 PM
Jim Biz's Avatar
Jim Biz Jim Biz is offline
Forum Moderator

Registration Date: Mar 2000
Location: MID-WEST USA
 
Posts: 486
Thanks Given to Others: 0
Thanked 4 Times in 3 Posts
Karma Power: 51
Karma: 114
Jim Biz is appreciated, and has over 100 Karma points.Jim Biz is appreciated, and has over 100 Karma points.
BIG Smile

Here's a place to start. Don't be worried about confusion with this one!!

http://Elsmar.com/ubb/Forum31/HTML/000023.html

If you are familliar with D-FMEA or P-FMEA conducted Prior to a problem occuring and/or 8D 5Y after a reported defect occurance... it will help give you a better idea of the prevent - correct dilema..

Regards
Jim

[This message has been edited by Jim Biz (edited 20 July 2000).]
Reply With Quote
Sponsored Links

  #3  
Old 20th July 2000, 04:46 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
WOUCH - I can see I am not the only one to ever have problems with this one. Thanks for the lead - truly appreciated.

I will continue to hash through this one - should be fun (NOT)!

Regards,
CarolX
Reply With Quote
  #4  
Old 10th April 2001, 07:09 PM
Bryan
Unregistered Guest

 
Posts: n/a
Question Preventive Action or Not

The may be straight forward, but we have had some discussion here so I wanted a outside opinion for clarification.

Example: Parts are rejected from the mfg floor for a nonconformance, some problem with them. Its not a serious trend right now, the rejection of this part. The question would be, Can a Preventive Action be written to have this part that remains in stock, checked and if necessary rejected, so no more are issued to the floor to prevent further rejects which slows production??
Or is this a case that a CAR should be written ??

Thank you for your input
Bryan
Reply With Quote
  #5  
Old 10th April 2001, 08:08 PM
Jim Biz's Avatar
Jim Biz Jim Biz is offline
Forum Moderator

Registration Date: Mar 2000
Location: MID-WEST USA
 
Posts: 486
Thanks Given to Others: 0
Thanked 4 Times in 3 Posts
Karma Power: 51
Karma: 114
Jim Biz is appreciated, and has over 100 Karma points.Jim Biz is appreciated, and has over 100 Karma points.
Bomb!

Just IMHO:
I'd call it corrective: it already happened wether or not it got shipped out or not it was not prevented before it occured.... if/when there are other similar products that may show the same condition in the future then I'd call those actions preventative.

Guess I'm operating on the assumption that the error in reality-found-you or occured prior to a preventative application in place ... that's corrective - any action taken prior to an actual error occuring is preventative

Regards
Jim
Reply With Quote
  #6  
Old 10th April 2001, 08:26 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Jim,

Agree that this instance is a corrective action.

Shouldn't the initial corrective action also identify like proceeses/products that could be affected and therefore corrected?

If the same problem occurs again in the like process that has been corrected, wouldn't that then become another corrective action and open up the effectiveness of the original corrective action.

I think we are on the same wave length:

Corrective Action - Occurred
Preventive Action - Could Occur (FMEA?)
Continuous Improvement - All's well, let's improve it

ASD...
Reply With Quote
  #7  
Old 11th April 2001, 09:58 AM
D.Scott's Avatar
D.Scott D.Scott is offline
Super Moderator

Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
 
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
Karma: 4082
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
I sure don't want to get hung up on semantics here and basiclly I agree with Al but I don't think his definitions go far enough to seperate Prevention and Continuous Improvement. To be a Prevention, it must have the same "all's well" characteristic as the C/I. To me the big difference is that the true Prevention has no measureable or goal (other than 0 which has been the state all along - otherwise you would be doing a C/A). There is never an occurance if the Prevention is successful. On the other hand, every C/I has a goal and a measureable (or else it would be called a "Continuous Status-Quo").
Just my opinion but it seems to make life easier here in tracking and the auditors have never raised an objection.
Dave
Reply With Quote
  #8  
Old 11th April 2001, 07:35 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Quote:
Originally posted by D.Scott:
I sure don't want to get hung up on semantics here and basiclly I agree with Al but I don't think his definitions go far enough to seperate Prevention and Continuous Improvement. To be a Prevention, it must have the same "all's well" characteristic as the C/I. To me the big difference is that the true Prevention has no measureable or goal (other than 0 which has been the state all along - otherwise you would be doing a C/A). There is never an occurance if the Prevention is successful. On the other hand, every C/I has a goal and a measureable (or else it would be called a "Continuous Status-Quo").
Just my opinion but it seems to make life easier here in tracking and the auditors have never raised an objection.
Dave
Dave,

I agree, I did not go far enough into the thought process behind my comment. Here goes,

A hypothetical situation #1:

I use FMEA review and prioritize the RPN's for preventive action projects.

Do I have a measurable? Yes, the reduced RPN (if successful)

Do I gave a goal? Yes, the lowest RPN possible.

Can I have an RPN of "0"? Common sense says no, no process is perfect.

Hypothetical #2:

I am running a daily chart on out internal PPM. The goal (limit) is 25.

1: My daily reading for the last month show I am consistently running in a range of 5-10 PPM. I say, people we can do better. Let's start a "continuous improvement" project.

2: Same as month 1 (5-10 PPM). At the start of month 2 we start to see the daily PPM's creeping up towards 13-18. I say, people, let's start a "preventive action" project. My reasoning is that we are within our goals but we want to prevent the PPM from going any higher.

3: Same as month 1 (5-10 PPM. I look at yesterdays data and see that the PPM is at 50. I say, people, shut down the process and begin a "corrective action" immediately!

I think any auditor worth their salt will see that there is a fine line between preventive action and continuous improvement. If a company documents that they are acting upon their defined measurables and improving their processes and systems there should be little discussion between the fine line between the 2 activities.

ASD...
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Nonconformance and Corrective Action

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Are two separate procedures required for Corrective action and preventive actions abhinav_sj Documentation Control Systems, Procedures, Forms and Templates 38 23rd April 2009 12:18 AM
Preventive Action Required for each Observation in Audit Report António Vieira Registrars (Certification Bodies) and Registration 25 29th September 2008 12:12 AM
Corrective and Preventive Action - State Maximum time for follow-up required? EtobiLad ISO 9001 - Quality Management Systems Standard 14 1st November 2006 04:50 PM
Level of detail required - Results of Corrective, Preventive Action rharold ISO 9001 - Quality Management Systems Standard 4 14th July 2006 01:24 PM
PREVENTIVE ACTION - Separating Corrective & Preventive Action. What am I gonna do? Raffy Preventive Action and Continuous Improvement 2 3rd September 2001 05:25 PM



The time now is 05:06 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts