The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Preventive Action and Continuous Improvement


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 18th March 1999, 08:20 AM
John C
Unregistered Guest

 
Posts: n/a
Default Continuous Improvement (March 99)

Continuous Improvement
Most activities commonly used to ‘improve’ a process are not ‘improvement’ activities at all. They are ‘maintenance’ or ‘corrective’. ie; they try to ensure the process is and does just what it was intended to do, in the way that it was intended. Audit does this. Inspection does this. Even manufacturing engineering does this, or little more than this, in most organisations.
I see ‘continuous improvement’ as small, incremental steps resulting from an ongoing analysis of the process, looking for opportunities to reduce waste and improve predictability, not just to keep the process doing what it should be doing, but making it do it better and differently. (in today’s world, this is a luxury)
4.14.3, Preventive action, seems to be telling me to do this but I can see problems; If I audit Accounts and say; “You only empty the invoices in-tray once per day (once per month?) and this is unhelpful for Procurement”, they will tell me that that is the way it has always been done and they don’t have resources to do it any other way. I can’t write it up as a non-conformance.
I can go to 4.2.3, Quality Planning, and try to get them to establish targets and plans to achieve them. (or I can throw snowballs at the moon)
Continuous Improvement is a nice thing to do. In fact, to my mind, it is the only thing to do - nothing else can guarantee your survival - but it is a very difficult thing to get people to do. We need all the levers we can get our hands on and we need to take them to Management review and bulldose them through. But, even if we get a good hearing, the chances are that nothing will happen. Anyone can understand the need to fix this mornings fires, but noone can delegate time to address an issue that is marginal (hense small, incremental progress), let alone go out to look for something that may not exist.
Is it Preventive action?
Is it Quality planning?
Does ISO 9000 offer any other leverage?
But, before we get embroiled in this; It is just an opener taken from my perspective. I’m sure there is a wide range of points of view, concerning continuous improvement, and maybe we should open it out first.
rgds, John C

Reply With Quote

Sponsored Links
  #2  
Old 23rd March 1999, 01:19 AM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

Quote:
Most activities commonly used to ‘improve’ a process are not ‘improvement’ activities at all. They are ‘maintenance’ or ‘corrective’
I tend to agree with this statement somewhat. Some, not all, organizations like to remain within their ‘culture.’ To try to make improvements is a losing battle. I faced this a lot at a previous employer.

Quote:
I see ‘continuous improvement’ as small, incremental steps resulting from an ongoing analysis of the process…
That is precisely what it is. The PDCA illustrates this. It does not have a STOP. It is an on-going process. I see this a lot: A Pareto of a previous process and a second Pareto showing the same process after an improvement project. It IS better, say a 25% improvement. But, what is ignored is the fact that the new Pareto still shows areas for improvement. But they become so enamoured with what WAS accomplished, what CAN be accomplished is ignored.

Quote:
…they will tell me that that is the way it has always been done and they don’t have resources to do it any other way.
Yea, the old IHABTW (It Has Always Been This Way) syndrome. I hate that. The previous employer I mentioned earlier was a CLASSIC example. Here is just one of many: I initiated an improvement project, on my own, that demonstrated a method that would, through yield improvements, save the company approximately $250,000 over five years if implemented. It involved a statistical method for wafer selection (a bit involved to go into here) prior to the manufacture of the semiconductor chips. I even designed a database and wrote a search algorithm that would select the wafers based on performance expectations. It was ignored and that company no longer exists. Not because of this particular IHABTW, but on their business practice in general, based for the most part on IHABTW.

Most would rather live with a problem they cannot solve than accept a solution they cannot understand.

Quote:
Does ISO 9000 offer any other leverage?
IMHO, not really. Continuous Improvement is something that should be part of the Quality Management System, but ISO 900x does not offer clear requirements for CI. I think ISO9000:2000 offers a CI scheme, but I am not sure about that.

Regards,
Don
Reply With Quote
Sponsored Links

  #3  
Old 18th August 2000, 05:17 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Yup - the 2000 version has 8.5 Improvement with 8.5.1 Planning for Continual Improvement.

Also see http://Elsmar.com/ubb/Forum16/HTML/000057.html
Reply With Quote
  #4  
Old 15th September 2000, 10:03 AM
Jim Evans
Unregistered Guest

 
Posts: n/a
Don,

I have experienced this same syndrome in some of the places I have been. I like to call it "historical inertia". The longer something has been that way; the more people like to keep it that way (or the harder it is to change.

Jim
___________________________________________






[This message has been edited by Jim Evans (edited 15 September 2000).]
Reply With Quote
  #5  
Old 15th September 2000, 10:25 AM
Ted Spickler
Unregistered Guest

 
Posts: n/a
We have had some success in encouraging incremental improvement steps by institutionalizing teams who search for ways to design improvements in the way they do their jobs. In some cases teams are formed by management to address a particular problem but the really interesting teams are formed by operators who see a way to do something different that had not occurred to management. A recognition system offers the best of these teams some corporate visibility. A point of controversy exists about recognition: should we be unhappy because workers join a team just to get a fancy dinner vs joining a team because they want to make a significant difference for the company? Either way we win but recognition seems to be a double edged sword.
Reply With Quote
  #6  
Old 15th September 2000, 10:53 AM
AJPaton
Unregistered Guest

 
Posts: n/a
Covering Ass

The Grand Canyon.

I'm feeling a bit contrary, so I'll point out that everyone wants total immediate buy-in on their plans and reaches exasperation point rather quickly. If you can't get acceptance of your big money-saving plan, perhaps you should tackle something smaller.

John C mentions "historical inertia", which I like as a term. Did you know that inertia is the tendency for a mass in motion to remain in motion as well as a mass at rest to remain at rest. If you can start the historical inertia rolling in your favor with small adjustments to attitude and process you'd sooner or later, (probably later), have a locomotive roaring down the tracks you laid.

By the way, the Colorado river didn't let an unyielding mass get in its way, and incrementally produced the Grand Canyon.

AJP
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Preventive Action and Continuous Improvement

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Continuous Improvement Toons wanted for Continuous Improvement Awareness Week CI-Walk the talk Preventive Action and Continuous Improvement 2 12th November 2008 01:56 AM
Continuous Improvement Tools - Why do continuous improvement efforts fail BRoyal Preventive Action and Continuous Improvement 18 9th June 2006 07:21 PM
The Continual Improvement Process (vs. Continuous Improvement?) Marc Book, Video, Blog and Web Site Reviews and Recommendations 6 8th May 2004 12:06 AM
Continual Improvement vs. Continuous Improvement - Terminology Semantics Jimmy Olson ISO 9001 - Quality Management Systems Standard 16 9th September 2002 07:37 AM
Continuous Improvement tim banic ISO 9001 - Quality Management Systems Standard 6 5th April 2002 04:45 PM



The time now is 01:44 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts