The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO and IEC Medical Device Related Standards > ISO 13485 - Medical Devices - Quality Management Systems


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 22nd November 1999, 12:25 PM
Monica Lewis
Unregistered Guest

 
Posts: n/a
Clown Purchase

Hi Marc and Don

I hope you guys remember me. I have been working on patent issues the last 6 months. At last I am back into the Quality world. I have written a purchasing procedure that includes the requirements of QSR (§820.50) and also ISO 9001 (4.6). I have stated in the scope of the procedure the following:

This procedure applies to purchase orders for products, equipment, and services that are part of or incorporated into the final products manufactured by our Company.

The problem is some employees want to include products such as glassware, chemicals, consumables, pens, computers etc that are not incorporated into our final product. I have told them that this is not a requirement according to ISO/QSR, but if they want to integrate such products into the procedure and it is accepted by the management, then it is fine for me. I have told them that I do not want to hear afterwards that the ISO/QSR is a bureaucratic machinery.

Would be happy to get some feedback on this issue

Best Regards

Monica
Reply With Quote

Sponsored Links
  #2  
Old 23rd November 1999, 10:31 PM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Spin!

Welcome back.

You are correct in your assertion that including all suppliers would probably be a paperwork nightmare. If you must keep everyone happy, stagger the purchasing requirements based on critical requirements and taylor the requirements accordingly.

For example, items used in final product would be subject to one set of controls (most stringent). Items used in association with but not in final product would be subject to another (less stringent) and finally; items that have nothing to do with final product (least stringent). In my system, I call them stages (Stage I, Stage II, Stage III, etc.).

Of course, this may probably be overkill, but it may keep everyone happy (assuming you cannot persuade them otherwise).
Reply With Quote
Sponsored Links

  #3  
Old 24th November 1999, 05:51 AM
Monica Lewis
Unregistered Guest

 
Posts: n/a
BIG Smile

Hi Don,

It is nice to see that you are still active in the forum. I love your system regarding the different stages. However I will try to persuade the employees (after a four week discussion) to exclude the items that have nothing to do with our final product (stage III according to me). I will also ask the management if we really should include such items into the procedure. I know that some companies integrate their own requirements that are not required by the Quality System(s) into their business. They have given this kind of system a special name (I'm not referring to TQM and to be honest it is impossible to translate this word into English) and the employees are aware that they are not only working with the Quality System requirements, but also with the company's requirements. A problem will still remain if we include the items in stage III and that will be the Managers who do not want to approve and review the purchase requisition prior to purchase release. I have a big feeling that this will create a nonconformity against the ISO requirement (4.6.3 the last paragraph) and also the QSR (§ 820.50 which refers to §820.40). Why? Because we will not follow our own procedure. Is it OK to state in the procedure that such items do not require to be approved and reviewed prior to purchase release. If it is OK, then we will bump into a new problem and this will be that anybody can buy very expensive items (stage III) without any approval (I assume that the management will not allow this to happen). In order to solve this problem we could state in the procedure that items less or equal to x dollars do not need to be approved and reviewed prior to purchase release. What do you think about these solutions to the potential problems?
Reply With Quote
  #4  
Old 26th November 1999, 06:28 PM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Read This!

<FONT COLOR="#663300"><BLOCKQUOTE>However I will try to persuade the employees (after a four week discussion) to exclude the items that have nothing to do with our final product (stage III according to me). </BLOCKQUOTE></FONT>

Probably a good idea. Simpler is better in most cases.

<FONT COLOR="#663300"><BLOCKQUOTE>I have a big feeling that this will create a nonconformity against the ISO requirement (4.6.3 the last paragraph) and also the QSR (§ 820.50 which refers to §820.40).</BLOCKQUOTE></FONT>

Agreed, that would probably cause a problem. How it would be addressed in the procedures would be most critical. As you stated, leaving them out would probably be better.

<FONT COLOR="#663300"><BLOCKQUOTE>In order to solve this problem we could state in the procedure that items less or equal to x dollars do not need to be approved and reviewed prior to purchase release. What do you think about these solutions to the potential problems?</BLOCKQUOTE></FONT>

As I ststed above, that would work, but it would need to be very specific in nature. Sounds as if you are on the right track. Carry on.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO and IEC Medical Device Related Standards > ISO 13485 - Medical Devices - Quality Management Systems

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Purchasing Procedure example as per ISO 9001:2008 wanted anil123 Documentation Control Systems, Procedures, Forms and Templates 2 10th November 2009 09:21 AM
Differences: ISO 13485 vs. FDA QSR (820) - Includes Spreadsheets Jimmy Olson ISO 13485 - Medical Devices - Quality Management Systems 56 26th August 2009 06:54 PM
Interpretation of ISO 9001 Clause 7.4.2 - Purchasing Information glfmd56 Definitions, Acronyms, Abbreviations and Interpretations 10 5th March 2009 08:54 PM
21 CFR 820 QSR 820.25 Statistical Techniques Procedures Requirements S Roche Hendrix ISO 13485 - Medical Devices - Quality Management Systems 4 11th August 2005 11:07 AM
Applicability of ISO 9001:2000 Clause 7.4 to 'Internal' Purchasing? Paul Morrow ISO 9001 - Quality Management Systems Standard 11 27th February 2004 02:18 PM



The time now is 02:41 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts