Elsmar Cove Forum Sidebar
|
|
|
|
Monitor the Elsmar Forum
|
| Monitor New Forum Posts
|
|
Follow Marc & Elsmar
|
|
|
Elsmar Cove Groups
|
|
|
Sponsor Links
|
|
|
|
|
|
Donate and $ Contributor Forum Access
|
 |
|
Sponsored Links
|
|
|
|
Courtesy Quick Links
|
 Links that Elsmar Cove visitors will find useful in your quest for knowledge:
Howard's International Quality Services
Atul's Symphony Technologies
Marcelo Antunes' SQR Consulting
Bob Doering's Correct SPC - Precision Machining
NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
|
|
 |
|

13th March 2009, 04:30 PM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Feb 2009
|
|
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18 Karma: 10 
|
|
Need guidance in VSM (Value Stream Mapping)
Hi all,
I am an Industrial engineer and recently graduated. I work in a company that manufactures farm machinery equipments like Grain carts, Grain Drills, and other seed handling equipments. Now i am the only industrial engineer in my company so i get a very little or u can say no help or guidance in my field. I started off with many lean projects like Kaizen, VSM, simulation etc, but were unsuccessful and left incomplete since my company wanted me to concentrate on quality issues first. But now again i want to complete those projects and i want to start with VSM. I have read various articles, books and publications on VSM and have the theoretical knowledge but lack the implementation part of it. I dont understand where to start from. The reason is because our company has wide variety of products and each product have different assemblies which in futher has different subassemblies. Like the example of Grain drills you have the big frames, gear box drives, fertilizer drives, weldments, grain boxes, press wheels, opener assemblies etc which has to get assembled to form 1 single product. And we do all the activities right from FAbrication, Welding, painting and assembling.
So my question is what should be my product family, the whole drill or its sub-assemblies, and should i do an integrated VSM to incorporate all the station or individual VSM station to station.
I would really be thankful if someone could help me in this. Thank you for your time and consideration.
|

13th March 2009, 10:50 PM
|
 |
Rolling my 3rd eye!
Registration Date: Oct 2007
Location: Ottawa, Ontario, Canada
Age: 38
|
|
Posts: 197
Thanks Given to Others: 53
Thanked 39 Times in 32 Posts
Karma Power: 42 Karma: 190  
|
|
|
Re: Need guidance in VSM (Value Stream Mapping)
Knowing where to start
I find to answer your question, I need to ask some!
My opening statement is, what you pick should be customer end focused, and start there!
So, - What is the scope you want to hit, why?
- You mentioned your time on quality issues, is there customer driven CAR or PAR, or even a process that is outstanding that would benefit?
- What is the over all scope, plan of direction, goals from upper management,
- What are the perceived heavy loss areas, or high waste areas?
- What does the hard data say these are? Is it accurate?
__________________
R. Leonardo, -Lean Change Agent (currently working for plastic injection molder) -Photographer -Teacher
Last edited by DanteCaspian; 17th March 2009 at 04:17 PM.
|

17th March 2009, 03:35 PM
|
 |
Involved in Discussions
Registration Date: Jul 2007
Location: St. Joe, MO
Age: 53
|
|
Posts: 208
Thanks Given to Others: 96
Thanked 114 Times in 74 Posts
Karma Power: 45
|
|
Re: Need guidance in VSM (Value Stream Mapping)
I always go to the low hanging fruit. What process or area is the most congested or in need of fixing? You could go after through the quality part but I'm like Dante.... his questions are on point as to the direction to pursue.
__________________
Some people view the glass as half full, some people view the glass as half empty, I view the glass as the wrong size - George Carlin
|

28th March 2009, 06:11 PM
|
|
Email Address Invalid or Rejected by Recipient System
Registration Date: May 2008
Location: Charleston, WV
|
|
Posts: 8
Thanks Given to Others: 4
Thanked 3 Times in 3 Posts
Karma Power: 0 Karma: 25 
|
|
Re: Need guidance in VSM (Value Stream Mapping)
Quote:
In Reply to Parent Post by pritishh
Hi all,
I am an Industrial engineer and recently graduated. I work in a company that manufactures farm machinery equipments like Grain carts, Grain Drills, and other seed handling equipments. Now i am the only industrial engineer in my company so i get a very little or u can say no help or guidance in my field. I started off with many lean projects like Kaizen, VSM, simulation etc, but were unsuccessful and left incomplete since my company wanted me to concentrate on quality issues first. But now again i want to complete those projects and i want to start with VSM. I have read various articles, books and publications on VSM and have the theoretical knowledge but lack the implementation part of it. I dont understand where to start from. The reason is because our company has wide variety of products and each product have different assemblies which in futher has different subassemblies. Like the example of Grain drills you have the big frames, gear box drives, fertilizer drives, weldments, grain boxes, press wheels, opener assemblies etc which has to get assembled to form 1 single product. And we do all the activities right from FAbrication, Welding, painting and assembling.
So my question is what should be my product family, the whole drill or its sub-assemblies, and should i do an integrated VSM to incorporate all the station or individual VSM station to station.
I would really be thankful if someone could help me in this. Thank you for your time and consideration.
|
Pritish,
I posted the process my team used to develop first VSM in a factory where we make products of different flavors. Check out the forum named "Value Stream Mapping - Can anyone help me in developing a VSM?".
It might be helpful.
Last edited by harry; 28th March 2009 at 09:13 PM.
|
|
Thanks to Ashmot - 2010 for your informative Post and/or Attachment!
|
|

6th April 2009, 02:45 PM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Feb 2009
|
|
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18 Karma: 10 
|
|
|
Re: Need guidance in VSM (Value Stream Mapping)
Thanks for ur help guys. i really appreciate the time and effort that u guys put to solve difficulties of people like me.
|

15th April 2009, 01:06 AM
|
|
Involved in Discussions
Registration Date: Jan 2007
Location: Zhuhai City, Guangdong Prov, P.R.C.
|
|
Posts: 77
Thanks Given to Others: 1
Thanked 13 Times in 8 Posts
Karma Power: 33 Karma: 69 
|
|
|
Re: Need guidance in VSM (Value Stream Mapping)
send you the sample of VSM in my company.
__________________
Peace
|
|
Thank You to peacewong for your informative Post and/or Attachment!
|
|

24th April 2009, 09:21 AM
|
|
Inactive Registered Visitor
Registration Date: Feb 2009
|
|
Posts: 1
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18 Karma: 10 
|
|
|
Re: Need guidance in VSM (Value Stream Mapping)
Pritish do a process Mapping of the products and start with time studies to find out cycle times of each product. It will help in preparing your VSM maps.
|

19th June 2009, 12:31 PM
|
|
Inactive Registered Visitor
Registration Date: Jun 2009
Location: Green Bay, WI
|
|
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 16 Karma: 10 
|
|
|
Re: Need guidance in VSM (Value Stream Mapping)
It is always difficult to value stream map in a environment with a large mix of product. One way I approach this is to think in terms of the a "Process Family" instead of a "Product Family". A process family is a series of operations that are common to many different products. Many times this type of thinking will expose other areas of opportunity on the shop floor. Once you know what you want to VSM, do as others have said in this post - know your improvement targets. These targets are what makes a really good future state VSM shine.
Roger
|
Lower Navigation Bar
|
|
|
Do you find this discussion thread helpful and informational?
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Forum Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|