The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 19th October 2000, 10:20 AM
Al Dyer
Unregistered Guest

 
Posts: n/a
Question Final Inspection

This may sound a little basic so bear with me.

My view is that:

1: There is no specific location for the process of final inspection and that it may be performed at the production cell.

-Others in the organization argue that it must be performed in a controlled laboratory setting.

2: We specify which dimensions are to be verified during final inspection on the control plan. I.E. we don't need a full dimensional layout. (This assuems the customer has approved the PPAP warrant)

-Others in the organization insist that all dimensions have to be noted on the final inspection section of the control plan. I.E. full dimensional layout.

My arguement is that we define the final inspection requirements on the control plan, that the inspection can take place at the production cell, and that a trained operator can perform and document the final inspection. (With approved PPAP)

I would appreciate any input.

Thanks...

------------------
Al Dyer
Mngt. Rep.
JAE Tech Inc.
ullysses3@excite.com
Reply With Quote

Sponsored Links
  #2  
Old 19th October 2000, 11:52 AM
Don Watt
Unregistered Guest

 
Posts: n/a
Hi Al,

I'm in agreement with your views, i.e. you don't need to measure/ inspect everything ;
Trained Operators can perform final inspection as part of the cell.

If you were to adopt your colleagues views of verifying separately in a controlled lab, you are 1) increasing cost & 2) moving the onus for product quality from the operator

I'll be interested to see what others think!
Cheers,
Don
Reply With Quote
Sponsored Links

Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
MSA and Control Plan - Satisfying Visual Inspection Requirements fregando ISO/TS 16949 - International Automotive Quality Systems Standard 5 19th August 2009 04:51 PM
Control Plan: How to include Final Inspection murugan FMEA and Control Plans 3 19th August 2009 05:34 AM
Can give me the sampling plan for Receiving and Final inspection - AS9100? venkatesan Quality Assurance and Compliance Software Tools / Solutions 3 18th May 2009 06:15 PM
'Final Inspection' and 'Layout & Functional Testing' - Part of Control Plan? jhoniegudel FMEA and Control Plans 6 17th June 2006 11:04 AM
Process Control Plan and Inspection Plans - Receiving and final inspection required? krishkaar Inspection and Test, Sampling and Related Topics 8 3rd November 2004 07:46 AM



The time now is 01:12 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts