The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Preventive Action and Continuous Improvement


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th February 1999, 09:38 AM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default Defects and Systems

-------Snip-------
Subject: Defects and Systems
Resent-Date: Tue, 2 Feb 1999 03:32:10 -0500 (EST)
Resent-From: den.list@deming.ces.clemson.edu
Date: Mon, 1 Feb 1999 14:03:22 -0600
From: schwartz@pioneer-software.com (Barry Schwartz)
Reply-To: den.list@deming.ces.clemson.edu
To: den.list@deming.ces.clemson.edu (DEN list)

This posting relates to several recent threads, such as Zero Defects and its proponents, Poka Yoke, etc.

I do not have experience either teaching or implementing Deming "philosophy" in an organizational context, and perhaps that gives me an advantage in evaluating the relations between Defects and Systems.

For me Donald Wheeler's distinction between "the voice of the customer" and "the voice of the process" is "intuitive".

When I buy an item I want it to have zero defects, in that I want it to meet all its specifications so that I can "know" what I have bought. It is admirable of organizations if they can provide me with such conforming goods.

But it is not _all_ that I want of a manufacturer, retailer, service organization, etc. I want the product to work _better_ than its specification. I want the specification to represent what I "know" about the product, that which I am willing to admit is within the capabilities of the product, but this does not set a limit on what I would _like_ from the product. If two products both conform to the same specifications, but B is nevertheless _better_ than A, then I want B.

But moreover I want a manufacturer, retailer, service organization, etc., to _surprise_ me. I do not want to always know ahead of time what my world has in store for me tomorrow. I am not a big fanatic of electronic gadgets; it is especially in service that I want to be surprised, or in door hinges, or in shockingly low prices, or in unexpected applications, or whatnot.

And I don't know what else.

It seems to me that the only clear statement that comes out of my "mouth" here, as a customer, is that I want the product to conform to its specification, but on top of that there is unsaid or vaguely said an array of expectations that have very little to do with specifications. A manufacturer, retailer, service organization, etc., to "win" must satisfy these expectations. The presence or absence of defects is simply easier to verbalize, _not more important_ than other aspects.

And perhaps there is a simplifying framework in which "meeting specifications" comes about as a consequence of meeting my expectations in general. Maybe Shewhart, Deming, Wheeler, etc., formulated such a framework.

Deming, in particular, seems to have emphasized that the organization should _exist_ to do more than what is easy to verbalize, such as "meet specifications", "make a yearly profit", etc. Again, maybe it helps that I am not a manager or consultant. I can see that I want more than that out of a human life -- that to me a person should do more than live up to prior expectations, that no one should live solely to maximize his or her monetary profit, etc. Not being associated with running a corporation, I can afford to say that I don't want corporations to exist, in general, if that's to be "all" that they are to be about. If corporations aren't to be more than that, then maybe we should eliminate them from our society rather than figure out how to make them more efficient. They are, after all, creations of convention, and in principle we can change the conventions. But even then we would have to fill the void with _some_ kind of communal "being". I do not object in general to meeting expectations, making profits, etc., _personally or communally_, but I do object to having these as _personal or communal_ life aims.

I do not believe I am that unusual in expecting "more" out of life than meeting goals, making profits, etc. I'm not politically radical, and I have money in stocks and bonds and so forth, and I want my money to grow, etc., but some things are just easier to say than others. I suspect that there is a widespread unvoiced expectation that organizations should do more than meet specifications, make profits, etc. They should help make the world a better place in which to live, for otherwise why bother having them?

Does much in the way of "public relations" and exist to give the _impression_ that a company makes the world a better place? If so, then does this present evidence that people besides me want the "real thing"?

Etc.

Barry Schwartz
Pioneer Software Development, Inc.
work: schwartz@pioneer-software.com
home: Barry.Schwartz@acm.org
-------End Snip-------

Comments, anyone.

Regards,
Don
Reply With Quote

Sponsored Links
  #2  
Old 21st March 1999, 06:03 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Well, Don, how do you define 'quality'?
Reply With Quote
Sponsored Links

  #3  
Old 22nd March 1999, 04:00 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Default

Don,

I saw this while browsing the DEN. My initial thoughts centered about this statement made by Barry Schwartz.

Barry states: "It seems to me that the only clear statement that comes out of my "mouth" here, as a customer, is that I want the product to conform to its specification, but on top of that there is unsaid or vaguely said an array of expectations that have very little to do with specifications. A manufacturer, retailer, service organization, etc., to "win" must satisfy these expectations. The presence or absence of defects is simply easier to verbalize, _not more important_ than other aspects."

The verbiage used by Barry still leaves me a bit confused so my intpretation may be inaccurate, but the conclusion I arrive to is that he isn't easily pleased. Building to specifications, in this case, speaks to the product requirements as determined by Marketing. If Marketing creates an innovative design concept, then how can the Customer know in advance what the specifications are? They can't. Meeting requirements is not enough, especially in the future of an organization. This is driving by the review mirror and what Deming warns against. While Barry may be very satisfied with a product, what keeps him loyal to the manufacturer? I ask this understanding that a satisfied customer is not a loyal customer, one who will return every time to buy from you (the one you have delighted by exceeding the expectations). While many organizations live comfortably off the innovation of other organizations, do they contribute anything more? Perhaps their only contribution is to keep the leader in the industry...innovative. These are the folks who do not live to specifications, they create and define them.

As for defining Quality...I agree with you. The whole definition thing grows tediously mundane in the industry (perhaps QS program documentation is to blame here). Let each define it for themself.

As I have read here many times, defining Quality, which Guru's QS to deploy, or "which" is better than "what" should be left to the individual. The input of anyone, gurus or Cove contributors, should be weighed against the options and the situation. Enough of my ramble.

Back to the group...
Reply With Quote
  #4  
Old 22nd March 1999, 10:12 PM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

Quote:
Building to specifications, in this case, speaks to the product requirements as determined by Marketing. If Marketing creates an innovative design concept, then how can the Customer know in advance what the specifications are?
Kevin,

I could not agree more. When someone speaks about ‘building to specifications’ just bring up software as the subject. What are the specifications for Windows 98 and is it up to specs?

I bring this up, not a criticism of Windows, just to make a point, which is:

Quote:
...is that I want the product to conform to its specification, but on top of that there is unsaid or vaguely said an array of expectations that have very little to do with specifications.
What specification? What expectations? Are the bugs (many so far I have seen) part of the specification? Is 5% of code acceptable as 'nonconforming?

Quote:
Let each define it for themselves.
I preach this over and over. Can any one single model fulfill the ‘one size fits all’ paradigm. I think not. You hit the nail on the head.

Quote:
The input of anyone, gurus or Cove contributors, should be weighed against the options and the situation.
I have said it over and over, as you well know. Do not read what people said they said, read what they said. Then decide what is appropriate.

Regards,
Don
Reply With Quote
  #5  
Old 23rd March 1999, 01:24 AM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

“There Is Nothing Worse Than a Sharp Image of a Fuzzy Concept.”

Ansel Adams

Marc,

That question always gives me angst. I generally try to sum it up something like this: What the customer needs when he needs it, every time. But even that is subjective. Note I stated NEEDS, not WANTS. He wants a toaster, but he needs a toaster that works as expected, has a long functional life and give him value (more toaster for the buck sorta thing), etc.

He WANTS a car, but NEEDS personal, reliable transportation.
He WANTS medical treatment, but he NEEDS diagnosis and possibly cured.
He WANTS a cell phone, but he NEEDS portable, reliable communication.
He WANTS a new ignition module for an ’89 Ford Tempo, but he NEEDS a fully functional one (personal example. ARGHHHHHHHH!).

And so on. Sorta like the symptom/problem thing. That is part of the reason I try to stay away from the generic definitions offered by the popular press and gurus for the classes I give. I ask the attendees to offer their definitions and I try to illustrate a case example based upon their inputs. But one thing I personally believe is definite: Quality is defined by the customer, regardless of the product.

This ‘definition’ thing is also part of the reasoning for me (as yourself, I believe) trying to use a systems and process approach in a Quality Management System. Defining quality as inspection to specifications is, IMHO, silly. Measuring 5 out of every 100 widgets and issuing a ‘declaration’ (read C of C) the product is ‘quality’ is waste. I think I have mentioned this before, but here I go again:

Quality is not inspection. Quality is not customer surveys. Quality is not conformance to requirements. Quality is not ‘The totality of features….” Quality is not having control charts posted at inspection stations and declaring the process controlled. Quality is not a registration stamp issued by some third party. Quality is not having employees meeting the third Thursday of every other month except on a full moon and holidays and calling it a Quality Circle. Quality is not mass training in statistical techniques. Quality is all of these and quality is none of these.

Just the ramblings of an old wizard warrior.

Regards,
Don
Reply With Quote
  #6  
Old 23rd March 1999, 11:32 AM
waberens
Unregistered Guest

 
Posts: n/a
Default

"Let each define it for themselves."

Kevin & Don,

Maybe I'm still too new to these ideas, 5 months in "quality", but is it that subjective? As I read and listen to you & others that are veterans in this field it seems that things get fuzzier. Is there not an objective to put before managment, employees, customers, suppliers, and ourselves that we can strive for? Quality and excellance is something to strive for, even as we at times settle for less. I know there is alot of good things being done by folks posting to these boards, but sometimes these heavy discussions are almost depressing. They do make me think about the issues though, even if I don't post often. I appreciate the big picture discussions as well as the more focused forum.

Now I'm rambling. Just want to know there is something to grasp a hold of in quality.

Bill
Reply With Quote
  #7  
Old 23rd March 1999, 02:07 PM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

Good points, Kevin, to which I can only offer the following:

Quote:
…but is it that subjective?
Yes, it is. Granted some concepts are universal, but most are subjective. Statistical concepts are universal. How these concepts need to be applied are subjective. ‘Quality’ is a moving target and customer focused. It is defined by the customer and developed by an organization to meet or exceed the customer’s needs.

Quote:
As I read and listen to you & others that are veterans in this field it seems that things get fuzzier.
As stated above, there is nothing worse than a sharp image of a fuzzy concept. Everyone (including myself) thinks they know what ‘quality’ is, but when asked to actually define it and apply that definition, things get murky (including myself). I equate it to ‘pushing a rope.’ It can be done, but not easily. BTW, do not equate ‘veterans’ with ‘experts.’ As for myself, I am NOT an expert, just a humble practitioner.

Quote:
Is there not an objective to put before managment, employees, customers, suppliers, and ourselves that we can strive for?
Yes. It is defined by you and your organization based on customer’s needs. The point I try to make is that any single model is probably less than appropriate. ISO 900x, in and of itself, is as stated in the document; a quality ‘model.’ No more, no less. Does an ISO 900x system mean quality product? Does it mean increased efficiency? Increased profit? Increased customer satisfaction? Or QS 9000 for that matter. Or Deming, Crosby, Slater, Juran or the host of others. I think they all would be the first to admit that the system must be right for the organization, they are all just ‘models.’ Your objective may be ‘Zero Defects’ (I know Kevin, but I had to have some example). That is fine. Now, you strive for Zero Defects. But, HOW you achieve this is up to you. Your objective may be ISO900x, QS 9000, or whatever. The same thing goes, it is up to you how.

Before implementing any Quality Management System, questions of this type must be asked and answered. What is your ‘objective?’ A company’s first priority is to stay in business. It does this by making money. It makes money by selling product and reducing waste. It sells product by defining, supplying and pleasing customers. It pleases customers by giving them what they need. It reduces waste by defining areas of potential improvement and improving them, continuously. For example, Crosby’s ‘conformance to requirements’ concept. Whose requirements? Satisfy just yours and the customer may not be pleased. Satisfy just the customer’s and shareholders may not be pleased. Satisfy both yours and your customer’s and most will probably be pleased.

Quote:
They do make me think about the issues though…
Good. I like to think that if I can get someone to think about these types of things, then that, at least, is something.

Quote:
Just want to know there is something to grasp a hold of in quality.
Of all the things I could have put here, I thought of this.

“Those who enter the quality field must be open of mind and fiery of spirit, for the task before you is immense.”

Regards,
Don
Reply With Quote
  #8  
Old 23rd March 1999, 09:03 PM
Batman
Unregistered Guest

 
Posts: n/a
Default

The Internet is not vast enough to describe "Quality." I think you folks did a terrific job putting a chip in the mountain called "Quality." I like to think "Quality" is doing the right thing at the right time. Getting there is half the fun. Press on...
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Preventive Action and Continuous Improvement

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Poka Yoke - Information and Input of Poke Yoke example Daniele Quality Tools, Improvement and Analysis 6 6th November 2009 07:40 PM
Poka-Yoke - Definition - How do you define Poka-Yoke? wdavenportIII Definitions, Acronyms, Abbreviations and Interpretations 10 27th July 2009 06:26 PM
Is Poka-Yoke Old Hat? Is Poka-Yoke still a valid concept? The Fixer Nonconformance and Corrective Action 28 12th July 2006 02:52 AM
Zero Defects & Taguchi Loss Function - ISO 9000 and the Zero Defects Philosophy Marc Quality Tools, Improvement and Analysis 32 25th April 2004 10:26 AM
SPC (minimizing defects) Vs Poka Yoke (zeroing out defects) Marloun SPC Monitoring and Statistical Analysis Techniques 3 3rd May 2000 07:05 PM



The time now is 05:40 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts