The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality

Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 30th August 2001, 12:49 PM
Jon O Jon O is offline
E-Mails Invalid or Rejected by Recipient System

 
Registration Date: Aug 2001
Location: Eau Claire, WI
Age: 42
 
Posts: 6
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
Jon O has less than 100 Karma points so far.
Question What causes Ppk to be greater than Cpk when a basic capability analysis is run?

Hello Everyone,

I know this have been a hot point of discussion in many threads here on the Cove however I am bringing the whole Cpk/Ppk thing again with a different question.

The question of the hour is this: What causes Ppk to be greater than Cpk when a basic capability analysis is run on a set of data? Generally speaking the Ppk will usually be lower than the Cpk, due to the overall sigma calculation vesus the R bar/d2 calculation however on occasion we will have data that shows a higher Ppk.

Does this have to do with the subgroup variation?

Any insight would be appreciated.

Regards,

Jon

Sponsored Links
  #2  
Old 4th September 2001, 09:30 AM
KenK KenK is offline
KenK Number 2

 
Registration Date: Jul 2001
Location: N.E. IL, USA
 
Posts: 42
Thanks Given to Others: 0
Thanked 4 Times in 4 Posts
Karma Power: 53
Karma: 281
KenK is appreciated, and has over 200 Karma points.KenK is appreciated, and has over 200 Karma points.KenK is appreciated, and has over 200 Karma points.
I suppose this could be related to the fact that Ppk's variance is estimated using the sample standard deviation and Cpk's variance is estimated using the range. I haven't taken the time to verify that though. My guess is that when you see Ppk larger, it isn't by much.

Ken
Sponsored Links

  #3  
Old 5th September 2001, 05:46 PM
Al Dyer
Unregistered Guest

 
 
Posts: n/a
Sigma from Ppk is calculated using all of the individual measurements.

Sigma for Cpk is calculated using the variation of the subgroup totals. RbarD2

Since there is more variation in the individual measurements the subgroup totals, Ppk will usually be lower that Cpk.

That is why Ppk is a preffered methododology to use during initial capability analysis.

Generally I see <10% difference between the two.
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
When to use Cpk or Ppk for a Process Capability Study? qakid Capability, Accuracy and Stability - Process, Machine, etc. 14 1st November 2010 04:11 PM
Cp Cpk Pp and Ppk Definitions - I'm doing SPC and Capability Analysis Leigh Definitions, Acronyms, Abbreviations and Interpretations 7 11th June 2009 12:16 PM
Interpreting the common capability indices: Cp, Cpk, Pk, and Ppk. Tim Folkerts The Reading Room 5 17th February 2009 09:01 PM
Can Ppk value be greater than Cpk and if yes, under what conditions? rnsvasan SPC Monitoring and Statistical Analysis Techniques 10 16th December 2007 01:12 PM
Pp and Ppk indices - Is it statistically possible to have a Ppk greater than Pp? Greg Johnson Capability, Accuracy and Stability - Process, Machine, etc. 16 11th May 2004 07:21 AM



The time now is 05:46 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272