The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Quality Manager Issues > Quality Management Related Issues


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 24th June 2009, 11:52 AM
aproddutoor aproddutoor is offline
Involved in Discussions

Registration Date: Jun 2009
 
Posts: 49
Thanks Given to Others: 20
Thanked 3 Times in 3 Posts
Karma Power: 2
Karma: 25
aproddutoor has less than 100 Karma points so far.
Please Help! What is a good lot size? We use the C=0 Sampling plans at AQL %1.0

Hi,

I want to know what is a good lot size?

Suppose if the purchase order is for 50000 parts. We use the C=0 Sampling plans at AQL %1.0 for in-process inspection. So for a lot size of 50000, the number of samples to be inspected is 74. Since 50000 is a large quantity and because we don't have enough confidence in our process, what we do is break that purchase order of 50000 into 10 lots, which is 5000 per lot.

For a lot size of 5000, the number of parts to be measured from the C=0 sampling plans at AQL 1% is 50. So for 50000 and 5000 per lot it would be 10 lots multiplied by 50 i.e 500 parts to inspect instead of the actual 74.

I don't feel this a right way of doing it because we are inspecting 500 instead of just 74. We can't run 50000 parts in a day, the maximum number of parts that we can run is 35000 on a good day and 30000 on an average. This particular part doesn't run on night shift.

What's happening here is since we divide our purchase order into 10 lots, although are Ppk values look good. How much confidence should I have in the process? and I don't know how the ppk value is, if we measure just 74 parts over the 2 shifts to complete the purchase order.

Can someone tell me a solution for this problem?



Reply With Quote

Sponsored Links
  #2  
Old 24th June 2009, 05:59 PM
B.Read B.Read is offline
Involved in Discussions

Registration Date: Feb 2009
 
Posts: 16
Thanks Given to Others: 0
Thanked 5 Times in 4 Posts
Karma Power: 3
Karma: 35
B.Read has less than 100 Karma points so far.
Default Re: What is a good lot size?

Sounds like you already know about determining a statistically valid sampling plan. There are posts here which describe how to do that which you can search for.

The thing I would look into is since you don't have confidence in you process and can only produce 30000 units daily, I would develop a sampling method to catch the out of control process before wasting a day's production and creating 50000 of scrap or rework.

Do you currently have any kind of SPC? What is the root cause of your lack of confidence in your process?

Bryan
Reply With Quote
Sponsored Links

  #3  
Old 24th June 2009, 11:53 PM
aproddutoor aproddutoor is offline
Involved in Discussions

Registration Date: Jun 2009
 
Posts: 49
Thanks Given to Others: 20
Thanked 3 Times in 3 Posts
Karma Power: 2
Karma: 25
aproddutoor has less than 100 Karma points so far.
Default Re: What is a good lot size? We use the C=0 Sampling plans at AQL %1.0

We use an SPC software but it s not a recognized one. Anyways, its called Magic Windows Professional and they don't even have a website.

So how should this sampling plan that you are talking about?

The process is having problem because of the inconsistent material. I'm doing Gage R&R's to at least make sure that there is no measurement system variation. The tolerance for the process is .75mm, it is really small. Most of our products are like that but .75mm is a tight tolerance and that is the reason why it is so hard to maintain a Ppk of 1.33 for a lot size of 50000. But right now we are doing double inspection I told you 500 units instead of 74 but we inspect 1000 actually. If you can see that is so much more than 74.

I don't want us to continue this way because I feel we are inspecting way too high than we should.
Reply With Quote
  #4  
Old 25th June 2009, 10:32 AM
Tim Folkerts's Avatar
Tim Folkerts Tim Folkerts is offline
Forum Moderator

Registration Date: Sep 2003
Location: Kansas, USA
Age: 46
 
Posts: 900
Thanks Given to Others: 27
Thanked 249 Times in 150 Posts
Karma Power: 123
Karma: 3974
Tim Folkerts is appreciated, and has over 1700 Karma points.
Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.
Default Re: What is a good lot size? We use the C=0 Sampling plans at AQL %1.0

I agree that SPC is the way to go. Basically you would be sampling throughout the day to find problems soon after they occur. This way you could fix the problem before ruining the rest of the day's output. A typical application of SPC might have someone checking 4 samples every 15 minutes.

There are many discussions her about SPC that you can find with the search features. Another good place to look is the NIST Engineering Statistics Handbook: http://www.itl.nist.gov/div898/handb...ion3/pmc31.htm

Tim F
__________________
To wonder is to begin to understand.
Reply With Quote
Thanks to Tim Folkerts for your informative Post and/or Attachment!
  #5  
Old 25th June 2009, 10:42 AM
bobdoering's Avatar
bobdoering bobdoering is offline
Stop X-bar/R Madness

Registration Date: May 2002
Location: LaGrange, OH
 
Posts: 2,088
Thanks Given to Others: 680
Thanked 563 Times in 469 Posts
Blog Entries: 13
Karma Power: 150
Karma: 3915
bobdoering is appreciated, and has over 1700 Karma points.
bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to bobdoering
Default Re: What is a good lot size? We use the C=0 Sampling plans at AQL %1.0

Quote:
Originally Posted by Tim Folkerts View Post

I agree that SPC is the way to go. Basically you would be sampling throughout the day to find problems soon after they occur. This way you could fix the problem before ruining the rest of the day's output. A typical application of SPC might have someone checking 4 samples every 15 minutes.
True, sampling plans are primarily used to verify that previous controls were effective - as in receiving or final inspection. They are really irrelevant for in-process inspection sampling. SPC is the way to go, and what the process and dimension is has everything to do what the correct sampling technique may be - not the software. Even the 'best' software can be inadequate based on the process.

As far as sampling frequency, again, that depends on what the process and dimension is. For example, in precision machining the sampling frequency is very clear and easy to develop (for control of assignable causes). For normal probability processes, they are based on best guess of risk and cost of not catching special causes weighed against inspection cost.

For incoming and final inspection, the biggest lot size is the best - to reduce inspection cost.
__________________
If we didn't care, we wouldn't share. That's why we're there.
Reply With Quote
  #6  
Old 25th June 2009, 11:33 AM
aproddutoor aproddutoor is offline
Involved in Discussions

Registration Date: Jun 2009
 
Posts: 49
Thanks Given to Others: 20
Thanked 3 Times in 3 Posts
Karma Power: 2
Karma: 25
aproddutoor has less than 100 Karma points so far.
Default Re: What is a good lot size? We use the C=0 Sampling plans at AQL %1.0

Quote:
Originally Posted by bobdoering View Post

As far as sampling frequency, again, that depends on what the process and dimension is. For example, in precision machining the sampling frequency is very clear and easy to develop (for control of assignable causes). For normal probability processes, they are based on best guess of risk and cost of not catching special causes weighed against inspection cost.
One problem we face with our processes is because of the tight tolerance like .75mm, the data doesn't follow a normal distribution. Is that ok? or is it a must to follow a normal distribution?

So does precision machining follow normal distribution?

Thanks
Reply With Quote
  #7  
Old 25th June 2009, 12:17 PM
bobdoering's Avatar
bobdoering bobdoering is offline
Stop X-bar/R Madness

Registration Date: May 2002
Location: LaGrange, OH
 
Posts: 2,088
Thanks Given to Others: 680
Thanked 563 Times in 469 Posts
Blog Entries: 13
Karma Power: 150
Karma: 3915
bobdoering is appreciated, and has over 1700 Karma points.
bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to bobdoering
Default Re: What is a good lot size? We use the C=0 Sampling plans at AQL %1.0

Quote:
Originally Posted by aproddutoor View Post

One problem we face with our processes is because of the tight tolerance like .75mm, the data doesn't follow a normal distribution. Is that ok? or is it a must to follow a normal distribution?

So does precision machining follow normal distribution?

Thanks
I can tell you that properly controlled precision machining does not follow a normal distribution - in fact, if it exhibits a normal distribution, it is typically out of control. To read more about that, see: Statistical process control for precision machining Part 1 and Statistical process control for precision machining Part 2

Sampling for in specification parts does not have to be from a normal distribution. Sampling to determine the distribution of incoming parts as a inference of the process distribution is abjectly invalid.
__________________
If we didn't care, we wouldn't share. That's why we're there.
Reply With Quote
  #8  
Old 25th June 2009, 01:14 PM
aproddutoor aproddutoor is offline
Involved in Discussions

Registration Date: Jun 2009
 
Posts: 49
Thanks Given to Others: 20
Thanked 3 Times in 3 Posts
Karma Power: 2
Karma: 25
aproddutoor has less than 100 Karma points so far.
Default Re: What is a good lot size? We use the C=0 Sampling plans at AQL %1.0

Our process is not capable of precision machining for sure.

Because our Ppk's vary between 1.33-1.8 for this process and as I mentioned this is for a lot size of 5000. If we make 50000 I can't imagine how horrible our Ppk's would look.

We need to make the process more stable in order to increase our lot size and inspect lesser than we're doing right now.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Quality Manager Issues > Quality Management Related Issues

Bookmarks

Tags
lot quantity


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Sampling Plan - AQL effect on sample size BigEd09 Inspection and Test, Sampling and Related Topics 7 22nd June 2009 05:47 AM
Calculating an AQL given a sample size, accept/reject numbers, and lot size seve00 AQL - Acceptable Quality Level 2 10th April 2009 05:19 PM
Sampling Spreadsheet to help determine the sample size for sampling plans Tim Folkerts Inspection and Test, Sampling and Related Topics 28 24th November 2008 12:55 PM
Design of Lot Acceptance Sampling Plan - Zero Acceptance Number Sampling Plans Karen Whitehead Inspection and Test, Sampling and Related Topics 27 14th November 2008 08:46 PM
Confusion on Lot Sampling - How to use sampling plans vasilist Inspection and Test, Sampling and Related Topics 3 31st October 2008 01:21 PM



The time now is 09:29 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts