The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 7th September 2001, 05:25 PM
Anton Ovsianko
Unregistered Guest

 
Posts: n/a
Please Help! Control and registration of weight measurement results data

Hello, all,

I have been guessing where to post this post... Chose this forum...
It is a practical matter. A medium-sized company manufactures hydro isolation material. Main production process is mixing liquid and dry substances. Critical factors determining end product technical quality during the production itself are:
- duration of the process
- temperature of mixing
- exact proportion of components (measured by weight)

The first two parameters are comparatively easy measured. The results of measurement can be also easily registered where necessary (for example with the use of simple devices, alarm systems etc.).
It is a little bit harder to control the third factor, as it is done manually with the use of electronic scales.
How would you suggest, that control and registration of measurement results should be organized?
Should it be a kind of a journal for self-control or what?

Thank you in advance for you help!

Anton
Reply With Quote

Sponsored Links
  #2  
Old 7th September 2001, 07:19 PM
D.Scott's Avatar
D.Scott D.Scott is offline
Super Moderator

Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
 
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
Karma: 4082
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
Default

Anton - We do material mixing and also record the weights. We maintain lot traceability of the mix components, record the weight of each component and the final mix weight. The resulting mix is given an internal lot number specific to that mix. All this is kept in a "Mix Log". Also included are: date, mixer, and MSDS label codeing.

Dave
Reply With Quote
Sponsored Links

  #3  
Old 8th September 2001, 07:46 AM
Anton Ovsianko
Unregistered Guest

 
Posts: n/a
Default

Thank you, Dave!

It is more or less clear now what you are measuring and recording. How is it organized? Is a Mixer doing it him-self?

In the company I am speaking about they weigh things manually on scales and then put the mixture into the mixing machine with the use of a dosing device. Should the responsible worker write down the results of measurement in a journal himself?
There is a risk that a worker too sure of his skills and attentiveness will write everything down beforehand, as it would improve his productivity. However it is rather a question of motivation, not of the technology...

Thank you once again!!!
Any more comments from someone?

YS Anton
Reply With Quote
  #4  
Old 8th September 2001, 09:01 AM
D.Scott's Avatar
D.Scott D.Scott is offline
Super Moderator

Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
 
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
Karma: 4082
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
Default

Our mixing is done in a lab setting by trained mixers. Yes, they record all their own info. The integrity of the mix rests with the integrity of the mixer.

As in all our lab procedures, the employees are trained and evaluated for competence.

The log is just as described - we use a loose leaf binder kept in the lab. Each of our mixes (final resulting product) has its own section in the binder.

As long as you don't have an employee or security problem, I suggest you keep it as simple as possible.

Dave
Reply With Quote
  #5  
Old 8th September 2001, 01:32 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11564
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
I Say...

> There is a risk that a worker too sure of his skills and
> attentiveness will write everything down beforehand, as it
> would improve his productivity. However it is rather a
> question of motivation,

If this happens, then the employee should be subject to reprimand (at a very minimum) or dismissal. There is a recent thread here that dealt with this same subject - a manager was involved, however (try a Forums search for 'fraud' and you'll find it). S/he was completing forms prior to the actions. This is nothing less than (in my opinion) Fraud. From a legal stand point, most companies - when you 'sign on' - have some type of clause whereby fraud is grounds for immediate dismissal.

I have worked with some chemical companies in implementation and they handled this in the same way D.Scott describes. If you have a good group of folks, falsifying data (which is what pre-entering data is - and again I use the word Fraud) should not be an issue.

I have seen auditors ask how you know employees are not pre-entering data (or entering the correct data) - either because of the reason you cite (lack of motivation) or because of employee sabotage. Be ready with an answer, but don't go over board.

I was once, probably 20 years ago, working for a company that closed off sections of Interstate 75 and did vibration analysis on the concrete sections to see if the dirt and crushed rock was being erroded from under sections of the concrete. It was a start at 11 PM and finish at 6 AM job. The data was so similar each night I started a 'secret' watch. I found employees were writing in 'normal' values and not even taking the measurements. When brought to task, they explained that the equipment was 'flakey' and they got tired of complaints about how slow things were going. These fellas were given problematic equipment, were not properly trained to begin with and then, to top it off, was badgered by management to 'get the job done faster'. I add this only to point out sometimes management pushes employees to a point where they have little or no choice.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
A little weight on my mind for New Year's - Measurement Uncertainty ScottBP Measurement Uncertainty (MU) 3 12th January 2009 01:47 PM
Fish Oil Capsule Weight MSA (Measurement Systems Analysis) sidit Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 9 28th August 2008 06:04 AM
Weight Measurement Uncertainty - F1 10 Kg weight comparison with 10 Kg E2 weight ahmadfy2003 Measurement Uncertainty (MU) 4 5th January 2007 03:30 PM
Weight Calculations - What is 100-600 u/ft2? What are these units of measurement? dbulak Misc. Quality Assurance and Business Systems Related Topics 12 16th December 2004 04:43 PM
Data Measurement - Where can I purchase a data recording system? murban Records and Data - Quality, Legal and Other Evidence 2 12th February 2002 07:49 PM



The time now is 08:09 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts