The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Service Industry Specific Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 4.00 average. Display Modes
  #1  
Old 11th September 2001, 04:53 PM
Russ's Avatar
Russ Russ is offline

Registration Date: Apr 2001
Location: Tipton, IN USA
 
Posts: 222
Thanks Given to Others: 1
Thanked 22 Times in 16 Posts
Karma Power: 42
Karma: 172
Russ is appreciated, and has over 100 Karma points.Russ is appreciated, and has over 100 Karma points.
Send a message via AIM to Russ
Question Job Shop vs. Service - Identification of jobs between departments

I work in a facility that regularly does some Job Shop work for other companies in the area including plating, heat treat, and grinding among others. Many times these jobs come in and need to be out the next morning thus they seldom have paperwork until the last minute before being shipped back out. In as far as Identification is concerned, these jobs are currently treated as if they are outside the control of our ISO/QS 9000 management system. Rarely are they ever tagged as to what they are, just moved to the appropriate department for the process that they need. However, this has not been addressed in our QMS, and I'm really not sure how to address it and not open an avenue that will cause us more problems down the road. I'm not sure which is better, not address it officially and have them use a generic "Job Shop" tag or address it and get dinged for the way we handle them? Anyone else have this problem?

Russ
Reply With Quote

Sponsored Links
  #2  
Old 11th September 2001, 09:10 PM
David Mullins's Avatar
David Mullins David Mullins is offline
Aussie Bloke

Registration Date: Nov 1999
Location: Adelaide, South Australia, Australia
Age: 47
 
Posts: 495
Thanks Given to Others: 0
Thanked 13 Times in 8 Posts
Karma Power: 51
Karma: 84
David Mullins has less than 100 Karma points so far.
Default where's the pulpit?

Russ,
There are others in the forum who work in allied areas, so I'll leave the main comments up to them.
I would like to say that THEORETICALLY you have a QMS to standardise processes and practices as a baseline/platform for improvement. Having these activities outside the QMS puts the company at greater risk in several areas. Surely there are customer requirements to be met, traceability (of sorts) requirements, handling/packaging requirements, etc.

Doesn't it send a confusing message to operators when some jobs need Q standard processes and other just don't matter. It's a rhetorical question - of course it does, it screams "quality is something we do when there is no other way to get around it"!

(Sorry about the sub-st'd typo's - hopefully fixed now)

Last edited by David Mullins; 13th September 2001 at 09:09 PM.
Reply With Quote
Sponsored Links

  #3  
Old 13th September 2001, 06:22 AM
Jim Biz's Avatar
Jim Biz Jim Biz is offline
Forum Moderator

Registration Date: Mar 2000
Location: MID-WEST USA
 
Posts: 486
Thanks Given to Others: 0
Thanked 4 Times in 3 Posts
Karma Power: 51
Karma: 114
Jim Biz is appreciated, and has over 100 Karma points.Jim Biz is appreciated, and has over 100 Karma points.
Default

Russ:

We do a small share of the same type of thing: mostly grinding but some machining as an outsource job shop.

Frankly - we never questined how it should be handeled.

Incomming inspection - apply our tag- issue appropriate paperwork as if the job started within our system - inspect - record - ship.

How does a shop justify/explain it is doing "Some work" on materials that are outside it's management system controls?

As far as "how we addressed it in our system docs - after recieving inspection and tag identification - we simply considered it the same as any of our jobs.

Regards
Jim
Reply With Quote
  #4  
Old 13th September 2001, 07:08 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Default

Russ,

Listen to David and Jim, they have nailed it. It is easier to to it right the first time and do it the same all the time. Employees expect consistancy!
Reply With Quote
  #5  
Old 15th September 2001, 03:12 AM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
I Say...

> Many times these jobs come in and need to be out the next
> morning thus they seldom have paperwork until the last
> minute before being shipped back out. In as far as
> Identification is concerned, these jobs are currently
> treated as if they are outside the control of our ISO/QS
> 9000 management system. Rarely are they ever tagged as to
> what they are, just moved to the appropriate department
> for the process that they need.

This is not aceptable per ISO 9001:2000 as far as I understand it. I would expect it to specifically excluded from the scope of registration if "...these jobs are currently treated as if they are outside the control of our ISO/QS 9000 management system..." is the actual case since it is a product they sell. I agree with Jim.
Reply With Quote
  #6  
Old 15th September 2001, 04:24 PM
lrorie lrorie is offline
Inactive Registered Visitor

Registration Date: Sep 2001
Location: Massachusetts
 
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 34
Karma: 10
lrorie has less than 100 Karma points so far.
Default

What jobs are acceptable per ISO 9001:2000 to be treated outside the control of one's ISO/QS 9000 management system beyond design and conrol design document elements????

Are all certifying registers in agreement regarding the use of the litmus test - if the company is selling or making profit from the product (job shop, by-products) and is ISO certified, then these products automatically fall under the company's ISO management system and is audited?????
Reply With Quote
  #7  
Old 16th September 2001, 10:32 AM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
I Say...

If I understand what you're asking....

The bottom line is a company can register part of the operation if they so choose. This is where the Registration Scope comes into play. If you make two products, for example, you could limit the scope of registration to specific lines and processes. I have seen this done both in ISO registrations and in QS registrations.

You're not relieved of management review, a nonconformance and corrective action system or other requirement, but the actual processes and such outside of the stated scope are not auditable. I saw one plant register the entire plant to ISO 9K except for one line. The line fed another line. Why did they do this? They planned on 'eventually' eliminating the line and outsourcing that assembly operation. They didn't want to spend the time and money to 'update' that line to conform with ISO requirements. It was a real weird situation where there was an intra-management fight going on over several issues - one of which was whether or not to outsource the line in question. The bottom line is they excluded that line from their registration scope statement (can you say verbal gymnastics?). They treated that line (it was just an assembly line BTW) as an outside supplier, technically, doing 'receiving inspection' to in part account for control of the supplier. The line was addressed by relevant supplier requirements.
Reply With Quote
  #8  
Old 17th September 2001, 09:09 AM
Russ's Avatar
Russ Russ is offline

Registration Date: Apr 2001
Location: Tipton, IN USA
 
Posts: 222
Thanks Given to Others: 1
Thanked 22 Times in 16 Posts
Karma Power: 42
Karma: 172
Russ is appreciated, and has over 100 Karma points.Russ is appreciated, and has over 100 Karma points.
Send a message via AIM to Russ
Default

Marc-
We have no such exclusion in our scope. Since ISO 9K2K treats services as products, I feel we need to bite the bullet and include Job Shop services now instead of waiting until we get nailed. Seems like the easier way to go to me, and would be more consistent overall. This system is 4 years old and I just took it over 11/00 so I'm working the problems out that have been overlooked until now. Thanks everyone for your input!

Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Service Industry Specific Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
How to Avoid Missed Welds - Job shop and weld several small quantity jobs Laser Manufacturing and Related Processes 11 18th September 2009 09:00 AM
How to implement SPC in a CNC m/c shop processing small batches of 'one timer' jobs? Joe_1 SPC Monitoring and Statistical Analysis Techniques 9 18th February 2009 06:59 PM
SPC on the shop floor - We are a job shop CMfgT SPC Monitoring and Statistical Analysis Techniques 5 1st October 2008 02:28 PM
Pin gage identification in a small CNC/Screw machine job shop tholian ISO 17025 - Calibration, Measurement Gages and Test Laboratories 9 10th November 2005 01:20 PM
SPC in job shop? CNC machine producing a max of 50 pieces per job pradeepm SPC Monitoring and Statistical Analysis Techniques 4 4th November 2005 10:52 AM



The time now is 05:52 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts