The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 12th October 2001, 08:07 AM
Howard Atkins's Avatar
Howard Atkins Howard Atkins is offline
Forum Administrator

Registration Date: Jul 1997
Location: Revivim, Israel
 
Posts: 2,412
Thanks Given to Others: 100
Thanked 448 Times in 253 Posts
Blog Entries: 8
Karma Power: 195
Karma: 4817
Howard Atkins is appreciated, and has over 1700 Karma points.
Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Howard Atkins
Please Help! 4.2.3.7 - Control Plans - Information in Appendix J

I have searched the forums and have not found an answer, maybe someone remembers or can help.
Quote:
According to 4.2.3.7 the control plan shall include the information in Appendix J
I believe that the control plan although the basis for the inspection and control instructions, after approval the actual locally approved individual instructions referenced in the control plan are the descisive documents.

If for any reason these local documents are updated does this fulfill the requirement for updating the control plan as long as on these individual documents have the information as per appendix J.

There are reasons that there has been a change, addition of inspection, etc. which do not require re PPAP and thus to update the complete original CP is wastefull.

Can any one help me to justify the updating of the local documents is acceptable as per requirements.

Auditors?
Reply With Quote

Sponsored Links
  #2  
Old 12th October 2001, 10:44 AM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
Default

Howard,

For revisions not requiring a PPAP:

Revising a document noted on the CP does not require a revision to the CP unless the revision level of the document has been noted also. In this case a revision to the CP would be required.
__________________
Sam Goody
Reply With Quote
Sponsored Links

  #3  
Old 12th October 2001, 06:03 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

> Revising a document noted on the CP does not require a
> revision to the CP unless the revision level of the
> document has been noted also. In this case a revision to
> the CP would be required.

I agree with that.

If the Control Plan cites a sub-document without revision level and that sub-document is changed, the change its self will determine whether a change to the control plan is nessary or not. I think when Sam said:

> For revisions not requiring a PPAP

He was alluding to that. But think about it... If the sub-document change is a change in criteria which is on the control plan (let's say you change an inspection instruction and you use a different gage as well), you may not have to re-PPAP per se (you'll have to do R*&R studies, etc., but not a 'full' PPAP) but you will have changes on the control plan.

Now - If the document cited is a Reaction Plan - there's another issue there. So - it depends upon what document is changed and its relationship to the Control Plan.
Reply With Quote
  #4  
Old 22nd October 2001, 03:51 PM
mboteo
Unregistered Guest

 
Posts: n/a
Default

In order to avoid needs to update the CP as much as possible. I have been referring to sub-documents as much as possible.

This is only possible, of course for process steps or feature that are not critical to safety.

All my CP's refer to Receiving inspection plans, Process setting sheets, Component inspection plans, Process specific work instructions, etc.

All my automotive customers had no problem of doing it this way. On the production floor itself, thanks to the referrals, the CP is a handy matrix, that quickly guides operators to the right documents to use for their job.

Steven
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Control Plans and Inspection Plans for panel board industries naran FMEA and Control Plans 5 1st March 2009 11:46 AM
Proprietary Information and Control Plans - Equipment, Materials, Specifications qualityboi FMEA and Control Plans 3 1st September 2006 05:38 PM
AIAG SPC Manual - Is the Control Chart in Appendix I wrong? qualitytrec SPC Monitoring and Statistical Analysis Techniques 9 25th May 2006 04:53 PM
Control Plans - Intending to transfer our control plans to electronic format Paul Homer Documentation Control Systems, Procedures, Forms and Templates 7 20th September 2000 04:56 AM
Control Plans - A few control plans that are generic enough to represent the facility Steven Sulkin FMEA and Control Plans 1 18th August 1998 01:15 AM



The time now is 08:57 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts