The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 17025 - Calibration, Measurement Gages and Test Laboratories > Measurement Uncertainty (MU)


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 18th October 2001, 05:42 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Lightbulb Thoughts on Traceability and Measurement Uncertainty (MU)

Date: Wed, 17 Oct 2001 11:13:26 -0700
From: "Dr. Howard Castrup"
To: Greg Gogates
Subject: Traceability/Uncertainty

Mike, Steve, et al.,

In Traceability/Uncertainty RE08, Steve Ellison presents what I believe to be a cogent argument for a definition of traceability that is not tied to uncertainty propagation through a traceability chain. The following definition, quoted by Mehul Joshi in this thread, contains at least the elements of what should be preserved in discussing traceability:

Traceability: "The property of a result of measurement whereby it can be related to appropriate standards, generally international or national standards, through an unbroken chain of comparisons."

Note that this definition does not include any mention of an accompanying uncertainty propagation analysis. Admittedly, requiring that parameters be calibrated by references that have themselves been calibrated by higher-level references in an unbroken chain traceable to a national or international standard or set of standards does not, in itself, control measurement uncertainty. However, such a requirement still has value. For one thing, the analysis of uncertainty propagation through a test and calibration support hierarchy, requires that the chain exist in the first place. Moreover, by leaving uncertainty propagation analysis out of the definition, we avoid several practical difficulties. These difficulties can be addressed by a separate uncertainty propagation analysis requirement.

In addition to traceability, other elements to be considered in uncertainty propagation analysis include the factors mentioned by Mike Ouellette in Traceability/Uncertainty RE03. These include location, environment, and time since calibration. The last factor is especially relevant to this discussion. As Mike and others have suggested or implied, the uncertainty of a calibrated parameter grows with time elapsed since calibration. With this in mind, it is important to note that the uncertainty statement that accompanies a calibrated parameter is nearly always just an estimate of the uncertainty of the calibration process -- not an estimate of the uncertainty in the reported parameter value at the time of use and under usage conditions.

I mention this as a lead-in to a comment that was made during an uncertainty analysis panel session at the 2001 International Dimensional Workshop. Responding to a question from the audience, one of the panelists, presumably in an effort to be consistent with the VIM, stated that, if the uncertainty during use is not the same as the stated uncertainty on the report of calibration, then the traceability of the calibrated parameter is lost.

Experience in the field of calibration interval analysis, replete with instances of observed changes in parameter value over time and/or reductions in in-tolerance probability as a function of time, argues that the uncertainty of a calibrated parameter begins to grow immediately following calibration and continues to grow during use. Given this, one might suspect that the reason ISO/IEC 17025 discourages projections of uncertainty over time on cal certs is that acknowledging the existence of uncertainty growth throws the VIM definition of traceability into controversy.

To see where this supposition derives from, I return to a comment made by Mike Ouellette: "... if the reported measurement is not accompanied by a (meaningful) uncertainty in that measurement, then THERE IS NO TRACEABILITY as defined by the VIM." Since a report of the measurement process uncertainty of a calibrating entity is hardly a meaningful uncertainty estimate for a parameter under conditions of use and time since calibration, by recognizing uncertainty growth, we either invalidate the VIM definition or conclude that we never have traceability.

So, Steve's objection to letting definitions dictate debate is needed, as we are apparently dealing with an example of the tail wagging the dog. The easiest solution, it seems to me, is to keep the concept of an unbroken chain of calibrations leading to a national or international standard separate from, but necessary to, the concept of uncertainty propagation through the chain. The former provides "error" control by fostering agreement between standards and equipment parameters, while the latter provides a means of assessing the quality of this control and also the quality of measurements made under conditions of use.

Dr. Howard Castrup
President, Integrated Sciences Group
Reply With Quote

Sponsored Links
  #2  
Old 18th October 2001, 06:17 PM
Jerry Eldred's Avatar
Jerry Eldred Jerry Eldred is offline
Forum Moderator

Registration Date: Dec 1999
Location: Texas
 
Posts: 411
Thanks Given to Others: 0
Thanked 118 Times in 70 Posts
Karma Power: 89
Karma: 2042
Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.Jerry Eldred is appreciated, and has over 1700 Karma points.
Default

Fascinating, well put, and still fundamental. I couldn't possibly add enough to that to spit at.

I am involved in evaluation of some 'stuff' produced by a metrology person at a site across the globe. I reviewed a treatise the person wrote replete with calculus formulas that gave me a headache, but which nevertheless missed a very basic point in calibration.

Calibration exists for the sole (fundamental) purpose of getting a handle on measurement uncertainty. In some ways it is nothing more, and nothing less. But in this persons lengthy treatise (which I'm not free to share here), not a word was mentioned about measurement uncertainty of their standards. They went on at length to discuss how (according to reading taken with their "Standard", they observed short term and long term drift. And borrowing from methodology used in MSA's, they defined a continuous monitor method of adjusting calibration intervals. Nowhere was traceability or uncertainty mentioned.

Regarding the article above, I fully agree. Calibration, and uncertainty management are a big club whose members take their little standard thingies, and see how well all their measuring stuff lines up with them. Then, every once in a while, we send our standard thingies to a senior club, where they compare our standards with the nicer ones they have. Their standards are a lot nicer than ours. They in turn (and quite invisible to us), send theirs on up the line to the Shriners Club (no offense to any Shriners here - only an illustration of a highest echelon). They send 'em back, and we repeat the process. Meanwhile, these little rascals called Entropy sneak around with these bright colored T-shirts on called Drift and Uncertainty, and try to mess up all those things we knew were working really well last time we calibrated them.

And there are, it seems, an infinite number of those little rascals in T-shirts sneaking around messing up our stuff. So, we figure out with a little math how long it takes them to totally mess up our stuff. They begin to mess the stuff up as soon as we get it back. How long it takes for them to mess everything up so bad we can't stand to look at it any more depends on how badly bahaved the little rascals at our company are.

Everything in the world that measures drifts all the time. Usually in predictable ways, often in ways we can't predict. It begins an infinitessimally small moment after we finish calibrating, and stops when we re-calibrate.

The best we can do is try to keep those little rascals locked up in their cages, and keep adjusting everything back at appropriate intervals.

Stepping out of my it's-been-a-long-week mode, I think it would be much more fair to say we can never know exactly what an instrument will measure. The purpose of understanding uncertainty is simply to try to quantify how well we understand the range around which an instrument will measure over a predictable period of time. Uncertainty analysis is nothing more than SPC applied to the calibration world with a few of the names changed.

Sorry folks, long day. Hope this is useful intelligent reading of benefit to some of us out there who get confused by uncertainty.
Reply With Quote
Thanks to Jerry Eldred for your informative Post and/or Attachment!
Sponsored Links

  #3  
Old 18th October 2001, 09:27 PM
Unregistered
Unregistered Guest

 
Posts: n/a
Default

Quote:
Originally posted by Jerry Eldred
Everything in the world that measures drifts all the time. Usually in predictable ways, often in ways we can't predict. It begins an infinitessimally small moment after we finish calibrating, and stops when we re-calibrate.
Actually, the best voltage reference standard available to the masses drifts, but it does so in such a predictable fashion that on any given day I can tell you its output with an uncertainty of about 0.3 PPM, which isn't too shabby. The trick is that you NEVER adjust it, you only chart it. It seems the best standards are not necessarily those that stay closest to nominal, rather those that you can predict with little uncertainty.

Let go, Luke, use the drift...

Ryan
Reply With Quote
  #4  
Old 19th October 2001, 03:57 PM
DICKIE
Unregistered Guest

 
Posts: n/a
Default

I agree whole heartedly with Dr. Castrup. I take everything he says about uncertainty to heart and believe him to be the preminent expert in the field.

Greg
Reply With Quote
  #5  
Old 20th October 2001, 11:23 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
I Say...

> Meanwhile, these little rascals called Entropy sneak
> around with these bright colored T-shirts on called Drift
> and Uncertainty, and try to mess up all those things we
> knew were working really well last time we calibrated
> them.

Jerry, I really liked your description and the rest about the "...rascals..." A good way to present it. I pasted this thread from the ListServe because of the confusion about uncertainty and how it plays a part in the whole chain. I hadn't thought of it as Entropy.

It's interesting how all the factors add up in some critical situations. I remember years ago at Cincinnati Electronics the cal lab had a 'special' section with certain standards like resistors that were kept immersed in liquid at a certain temperature, etc. I didn't work in the area, but was in there a few times during some projects. I really didn't pull everything together in my mind until the last 4 or 5 years. QS-9000's Measurement Systems Analysis brought together the 'last mile' for me, so to speak.

Anyway, one last snippet:

************************
Date: Thu, 18 Oct 2001 10:26:29 EDT
From: CoachIngal
Subject: Re: Traceability/Uncertainty

VIM definition of traceability:

"property of the result of a measurement or the value of standards whereby it can be related to stated references, usually national or international standards, through an unbroken chain of comparisons all having stated uncertainties."

- Paul Ingallinera
L-A-B Assessor

*********************************************

Date: Thu, 18 Oct 2001 08:45:14 -0400
From: Philip Stein
To: Greg Gogates
Subject: Re: Traceability/Uncertainty

Howard Castrup wrote, below, that

>"it is important to note that the uncertainty statement that
>accompanies a calibrated parameter is nearly always just an estimate of the
>uncertainty of the calibration process -- not an estimate of the uncertainty
>in the reported parameter value at the time of use and under usage
conditions."

But in fact many uncertainty budgets I have assessed DO estimate uncertainty growth with time. The best of this breed use appropriate statistical analyses of historical data to do so. Fluke, for example, conducts a program whereby voltage reference standards are calibrated and the report produced includes the slope of the drift. It is therefore possible for the user of the standard to estimate the actual voltage at any time in the future during the calibration interval. This is still an estimate, of course, the actual voltage is not known, but it is being predicted with a narrower confidence interval than would be possible without this program. This drift is included as part of an overall budget that encompasses other major influence quantities. For the most picky work, the drift is seen as a 'bias' and corrected for as of the time of use of the standard. The uncertainty in this 'bias' falls to the budget. Most practitioners, however, just include the maximum predicted drift for the entire cal interval as a term in their budget. Either approach is acceptable, although many thinkers, including the GUM, frown on moving uncorrected 'bias' into the uncertainty.

In my experience, most budget writers include specific influence quantities and ignore or are unaware of others. Change of the standard between external calibrations is commonly (but not universally) included.

So what about the traceability question that is being discussed here? The definition

> "Traceability: "The property of a result of measurement whereby it can be
> related to appropriate standards, generally international or national
> standards, through an unbroken chain of comparisons."

is one we lived with, more or less, for years. All we are doing today is highlighting the fact that the word 'related' in the definition must be understood as requiring a certain level of quantitation. Any relaxation of the current definition of traceability must still require 'related' to be a quantitative statement if traceability is to mean anything at all. Alternative methods of quantifying 'related' may be acceptable to some, but since we already have an accepted world-wide standard for accomplishing such a task, namely the GUM, there should be considerable justification for doing it a different way.

Phil

Philip Stein
Fellow, ASQ and member of its board of directors
A2LA Lead Assessor
Past Chair, ASQ Measurement Quality Division
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
  #6  
Old 18th December 2007, 04:16 AM
Ruebenn Ruebenn is offline
Involved in Discussions

Registration Date: May 2007
Location: Malaysia
 
Posts: 40
Thanks Given to Others: 2
Thanked 0 Times in 0 Posts
Karma Power: 11
Karma: 10
Ruebenn has less than 100 Karma points so far.
Default Re: Thoughts on Traceability and Uncertainty

Quote:
Originally Posted by Marc View Post

Date: Wed, 17 Oct 2001 11:13:26 -0700
From: "Dr. Howard Castrup"
To: Greg Gogates
Subject: Traceability/Uncertainty

Mike, Steve, et al.,

In Traceability/Uncertainty RE08, Steve Ellison presents what I believe to be a cogent argument for a definition of traceability that is not tied to uncertainty propagation through a traceability chain. The following definition, quoted by Mehul Joshi in this thread, contains at least the elements of what should be preserved in discussing traceability:

Traceability: "The property of a result of measurement whereby it can be related to appropriate standards, generally international or national standards, through an unbroken chain of comparisons."

Note that this definition does not include any mention of an accompanying uncertainty propagation analysis. Admittedly, requiring that parameters be calibrated by references that have themselves been calibrated by higher-level references in an unbroken chain traceable to a national or international standard or set of standards does not, in itself, control measurement uncertainty. However, such a requirement still has value. For one thing, the analysis of uncertainty propagation through a test and calibration support hierarchy, requires that the chain exist in the first place. Moreover, by leaving uncertainty propagation analysis out of the definition, we avoid several practical difficulties. These difficulties can be addressed by a separate uncertainty propagation analysis requirement.

In addition to traceability, other elements to be considered in uncertainty propagation analysis include the factors mentioned by Mike Ouellette in Traceability/Uncertainty RE03. These include location, environment, and time since calibration. The last factor is especially relevant to this discussion. As Mike and others have suggested or implied, the uncertainty of a calibrated parameter grows with time elapsed since calibration. With this in mind, it is important to note that the uncertainty statement that accompanies a calibrated parameter is nearly always just an estimate of the uncertainty of the calibration process -- not an estimate of the uncertainty in the reported parameter value at the time of use and under usage conditions.

I mention this as a lead-in to a comment that was made during an uncertainty analysis panel session at the 2001 International Dimensional Workshop. Responding to a question from the audience, one of the panelists, presumably in an effort to be consistent with the VIM, stated that, if the uncertainty during use is not the same as the stated uncertainty on the report of calibration, then the traceability of the calibrated parameter is lost.

Experience in the field of calibration interval analysis, replete with instances of observed changes in parameter value over time and/or reductions in in-tolerance probability as a function of time, argues that the uncertainty of a calibrated parameter begins to grow immediately following calibration and continues to grow during use. Given this, one might suspect that the reason ISO/IEC 17025 discourages projections of uncertainty over time on cal certs is that acknowledging the existence of uncertainty growth throws the VIM definition of traceability into controversy.

To see where this supposition derives from, I return to a comment made by Mike Ouellette: "... if the reported measurement is not accompanied by a (meaningful) uncertainty in that measurement, then THERE IS NO TRACEABILITY as defined by the VIM." Since a report of the measurement process uncertainty of a calibrating entity is hardly a meaningful uncertainty estimate for a parameter under conditions of use and time since calibration, by recognizing uncertainty growth, we either invalidate the VIM definition or conclude that we never have traceability.

So, Steve's objection to letting definitions dictate debate is needed, as we are apparently dealing with an example of the tail wagging the dog. The easiest solution, it seems to me, is to keep the concept of an unbroken chain of calibrations leading to a national or international standard separate from, but necessary to, the concept of uncertainty propagation through the chain. The former provides "error" control by fostering agreement between standards and equipment parameters, while the latter provides a means of assessing the quality of this control and also the quality of measurements made under conditions of use.

Dr. Howard Castrup
Dear Sir,

Thanks for the help, truly appreciate it.
Advanced Christmas greetings.
I suppose others have personally asked you for similar advise before and i would truly be obliged if you can let me know in brief/point form in what is required of an approved signatory of a RF/Microwave lab under the 17025 scheme.
I have come to know that the technical requirements are more important than the quality aspects.
I know we have to know the standards(both operation and service aspects) by hard which is what i am trying to so so hard now.
And i also know that we have to knw something about the uncertainty measurement(BMC) and all?
Do you have a sample of such a calculation underlying an example say..using a measuring receiver HP 8902S in calibrating a signal generator say a HP 8648C?
I am still blur in getting the infos..accuracy, resolution and so on.
Appreciate the reply.

Rgds
Ruben
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 17025 - Calibration, Measurement Gages and Test Laboratories > Measurement Uncertainty (MU)

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
TUR (test uncertainty ratio) based on Standard or Expanded Measurement Uncertainty? ScottBP Measurement Uncertainty (MU) 2 25th March 2009 11:04 AM
Measurement Uncertainty & Tolerance - Adding Uncertainty to the Tolerance Charles Wathen ISO 17025 - Calibration, Measurement Gages and Test Laboratories 12 5th June 2008 08:16 AM
Measurement Uncertainty - Measurement Uncertainty in Measurement Results Marc Definitions, Acronyms, Abbreviations and Interpretations 0 17th April 2006 08:13 AM
Traceability and uncertainty Hershal Measurement Uncertainty (MU) 3 30th September 2005 03:22 PM
Measurement of Uncertainty for Dummies LabTech2003 Measurement Uncertainty (MU) 2 17th August 2003 02:58 AM



The time now is 05:26 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts