The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 31st October 2001, 07:54 AM
Bob Stevens Bob Stevens is offline
Shy Poster (1 to 5 Posts)

Registration Date: Feb 2001
Location: Indianapolis, IN USA
Age: 51
 
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 36
Karma: 10
Bob Stevens has less than 100 Karma points so far.
Send a message via AIM to Bob Stevens
Unhappy Location of Work Instructions and Cost of Poor Quality - TS 16949

From a seminiar on the ISO/TS-16949 specification, I have two questions.

First, I know that the "Cost of Quality" is identifying the costs associated with Internal/External Scrap & Rework costs as well as Appraisal and Prevention costs. Is the "Costs of Poor Quality" use the same criteria?

My company recently removed all paper documentation from the floor. (Work Instructions Manuals, Drawings, Etc) The new specification states that work instructions "shall be accessible for use at the work station without disruption to the job." My processes are all manual assemblies without a machine driven cycle time. With all my documentation located on PC's approxiametely 15' away from the work stations, will I have to go back to my manuals?

Thanks in advance for any help

Bob Stevens
Reply With Quote

Sponsored Links
  #2  
Old 31st October 2001, 10:35 AM
Rick Goodson's Avatar
Rick Goodson Rick Goodson is offline
Inactive Registered Visitor

Registration Date: Aug 2000
Location: Waukesha, Wisconsin, USA
 
Posts: 229
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 42
Karma: 20
Rick Goodson has less than 100 Karma points so far.
Default

Bob,

The "Cost of Quality" and the "Cost of Poor Quality" are often used interchangeably. IMHO they are the same. The discussion usually centers around what is included in the costs. While we think of the classic Prevention, Appraisal, Internal Failure, External Failure, as the components of Quality Costs, the degree to which we define the elements of each varies considerably from organization to organization. Case in point, what makes up Prevention costs? Some organizations limit the elements to the quality engineering effort prior to production. Other organizations may include part of the cost of market research, contract and document review, product design qualification tests, just to name a few. Regardless of what you call it, the elements included really should be the essence of the discussion. There is a good book on quality costs available through ASQ. "Principles of Quality Costs", ISBN 0-87389-084-1. It is not very expensive and packed with good information.

I need to think a bit about your second question. My first impression is that it is not a problem and does meet the intent of the standard since they are accessable.

Regards,

Rick
__________________
Rick Goodson
Reply With Quote
Sponsored Links

  #3  
Old 31st October 2001, 10:55 AM
SteelMaiden's Avatar
SteelMaiden SteelMaiden is offline
Super Moderator

Registration Date: Jan 2001
Location: NC, USA
 
Posts: 3,140
Thanks Given to Others: 318
Thanked 770 Times in 525 Posts
Karma Power: 255
Karma: 7897
SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.
SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.
Default

I agree that most people use the terms interchangeably and most of the time it really doesn't matter as long as you are getting what you need out of the info. I call ours cost of quality, not only do we use the costs of "poor quality items" we include preventive measures, training that relates to quality etc.

As for the PCs being 15 foot away, it should not be a problem as long as you don't have a restriction on your personnel that keeps them from walking up to the computer whenever they need to access it. I've done the facility intranet thing for almost a decade now. We've had people a whole lot further than 15 foot from "their computer". All we ever did to justify it was that they could walk up to any machine in the facility, click the browser and look up what they wanted. We also state that a printed version is uncontrolled and considered to be obsolete past the time stamp on the doc i.e. it's obsolete by the time the deskjet ink dries, unless verified against the current rev on the "net". But, at least if they had a task that is only performed on occasion, they can print the copy out, go across the plant and perform their job without trying to remember everything or writing it out by hand.
__________________
"It's fun to have fun, but you have to know how", Dr. Seuss
Man may have invented fire, it took a woman to learn how to play with it.
Reply With Quote
  #4  
Old 31st October 2001, 12:56 PM
db's Avatar
db db is offline
Where's the shall?

Registration Date: Jul 2001
Location: Plymouth, MI
Age: 53
 
Posts: 2,202
Thanks Given to Others: 208
Thanked 166 Times in 128 Posts
Karma Power: 129
Karma: 2579
db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.
Money Cost of Quality

Now for the opposing view: Well not really opposing…but…

When determining the cost of quality, you must consider the costs of three distinct areas:
First, the cost of inspection; second, the cost of internally discovered nonconformances; and thirdly, the cost of externally discovered nonconformances. The cost of poor quality covers the second two, but only marginally covers the first. Should we generate only conforming product, the first cost could still occur, while the second and third would be absent. Cost of poor quality only involves the first area because inspection is generally a result of our lack of confidence.

Subtle difference, perhaps…anal, perhaps…inaccurate, perhaps. But it is my story, and I’m sticking with it (for now anyway)

Dave B
__________________
Dave B (the other Dave)
Reply With Quote
  #5  
Old 31st October 2001, 02:51 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Default

db, very good,

My problem is this:

Any cost of quality or additional resources needed to manufacture a product is a drain on the bottom line of a company. While good planning is also a cost, it is a cost that can be absorbed during the contract review process and be part of the piece price.

I am not so addle minded to think that things can'y go wrong, but what is achieved when processes are planned correctly, scrap is down, inspectors are not needed, and when the resources already allocated can perform a good corrective action as part of their job duties.

Maybe one of the management goals should be the reduction or elimination of the "quality" department and putting the resources into doing it right the first time.

Please Marc, remove my soapbox!!!!!!
Reply With Quote
  #6  
Old 22nd November 2001, 02:53 PM
Elsmar Server Administrator's Avatar
Elsmar Server Administrator Elsmar Server Administrator is offline
Elsmar Server Administrator

Registration Date: Jun 1996
Location: Internet
 
Posts: 59
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 56
Karma: 10
Elsmar Server Administrator has less than 100 Karma points so far.
I Say...

Actually, a second aspect of the original post was with respect to the following, as I read it:

> The new specification states that work instructions "shall
> be accessible for use at the work station without
> disruption to the job." My processes are all manual
> assemblies without a machine driven cycle time. With all
> my documentation located on PC's approxiametely 15' away
> from the work stations, will I have to go back to my
> manuals?

You have to use common sense. First of all, not every operation even needs a 'work instruction'. During the Design / Development stage, manufacturing should have been involved. At that time the team should have determined what documentation would be necessary - including 'work instructions'. Not to mention training and other aspects of the project.

I have been in companies that were so 'hi-tech' that every work station had a computer screen. That said, it was so advanced that, while not at work stations, every other computer 'station' included a scanner. Receiving scanned in documents received with shipments (along with other data input into their MRP system). RFQs are almost all paper - they were scanned when received. Heck - they scanned in just about everything. It was a small company which manufactures gaskets.

You have to be ready to explain what needs to be where and why. If, for example, an operator does not need constant access to a document to do his/her job, the computer being 15 feet away is fine. As was expressed in an earlier post, one company keeps binders in the work area. That's really no different than setting up a computer there set up to pull up required documentation. Binders - computer - what's the difference if it's 15 feet away? Which is fine - but again, what about where an operator needs an instruction right there in their face?

OK - now we're to the subjective area. Who needs an instruction in their face (so to speak)? Who decides? What are the determining factors? Can they be defined in words? This is where common sense comes into play.

How weird can this get? Extreme example. One client had an assembly line with vehicles coming down the line (bikes, not cars). During their ISO 9001 registration audit (this is back about 1997) the auditor did not like the idea that work instructions were posted behind each assembler's 'work space' and even suggested that the company put the work instructions on the wall on the opposite side of the line so a worker could "...look across the line and see what s/he has to do. That way the worker doesn't have to turn around..." We had to argue that the type would be too small to read. To implement that, all instructions would have to be in super large font on really big pieces of paper and that having to turn around was sufficient. A second factor was that there were assemblers on each side of the line - so while you could look around a bike, often the assembler on the other side would be blocking the view of the document. They went with us - turning around was OK in that 'situation' - but in my opinion that shouldn't have even come up.

That said, be ready to explain what you have where and be ready to discuss your rationalization. As I always say - One size does NOT fit all.
Reply With Quote
  #7  
Old 5th December 2001, 12:21 PM
Greg Maggard's Avatar
Greg Maggard Greg Maggard is offline
Inactive Registered Visitor

Registration Date: Nov 2001
Location: Lexington, Ky
Age: 41
 
Posts: 93
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 34
Karma: 15
Greg Maggard has less than 100 Karma points so far.
Send a message via ICQ to Greg Maggard Send a message via AIM to Greg Maggard
Thumbs up

It has been my practice to have the work instructions there infront of the workers as that is the place that needs the instruction in the first place. step by step more of a standardization of work station. Only what is needed (K.I.S.S.)
__________________
Greg Maggard
TS16949 Coord.
Reply With Quote
  #8  
Old 14th December 2001, 12:52 PM
tfish tfish is offline
Inactive Registered Visitor

Registration Date: Dec 2001
Location: Peoria, IL
 
Posts: 7
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 33
Karma: 10
tfish has less than 100 Karma points so far.
Default

The auditor is not giving the line worker much credit for being able to know and understand their procedures if they cite that as a nonconformance.

The company should be able to demonstrate understanding of the procedures by providing training records and through operator questioning. Therefore, location is not as important and access and understanding.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Personnel COPQ (Cost of Poor Quality) nado2020 Quality Management Related Issues 6 21st June 2009 11:26 AM
COPQ (Cost of Poor Quality) and COQ (Cost of Quality) - Differences peach Definitions, Acronyms, Abbreviations and Interpretations 26 5th January 2008 04:35 PM
TS 16949 Clause 5.6.1.1 - Cost of "POOR" Quality vs. Cost of Quality Lynda Young ISO/TS 16949 - International Automotive Quality Systems Standard 4 8th February 2005 12:35 PM
TS 16949 Clause 5.6.1.1 - Cost of Poor Quality - How can I track CoPQ? Mike Smith ISO/TS 16949 - International Automotive Quality Systems Standard 5 19th January 2004 10:22 AM
Cost of Poor Quality (COPQ) - What are the TS 16949 Requirements Satellite ISO/TS 16949 - International Automotive Quality Systems Standard 1 26th August 2002 03:53 PM



The time now is 08:12 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts