The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Preventive Action and Continuous Improvement


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 6th November 2001, 12:06 PM
Bob Stevens Bob Stevens is offline
Shy Poster (1 to 5 Posts)

Registration Date: Feb 2001
Location: Indianapolis, IN USA
Age: 51
 
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 36
Karma: 10
Bob Stevens has less than 100 Karma points so far.
Send a message via AIM to Bob Stevens
Assembly Productivity Rate Improvements

I have been assigned the task in my company's Continuous Improvement meeting to improve productivity throughput based on implementing process improvements. My team and I have developed several ideas on changes we could make to which could improve out throughput but before we start, we are uncomfortable with how the productivity rates were originally established.

The assembly operations are all Manual using lightweight components such as applying and o-ring to a pipe thread or applying sealant to the threads on a small vent. My predessor decided the best way to establish the productivity rates was to have three seperate operators assemble product for 1 hour each. Then he used the total number of assemblies built, divided that number by three a decided that would be the hourly rate for that operation. My group & I do not think that was the best way to determine a manual assembly production rate.

Does anyone have a suggestion on how to develop a manual productivity rate my team and I could revew?

Please advise.
Reply With Quote

Sponsored Links
  #2  
Old 6th November 2001, 12:33 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
Default best way

Hi Bob,

Just a little brainstorming....

Why does your group not feel this was the best way?
Do you think the current rates are inaccurate?
What other ideas have they come up with for measuring productivity?
What would be gained by re-establishing the assembly rates?

Just thinking out loud.

CarolX
__________________
CarolX

Theater is life, film is art, and television is furniture.
Reply With Quote
Sponsored Links

  #3  
Old 6th November 2001, 01:43 PM
Bob Stevens Bob Stevens is offline
Shy Poster (1 to 5 Posts)

Registration Date: Feb 2001
Location: Indianapolis, IN USA
Age: 51
 
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 36
Karma: 10
Bob Stevens has less than 100 Karma points so far.
Send a message via AIM to Bob Stevens
Default

Hi Carol,

Thank you for your response.

The problem we are running into is some of the assembly operators are able to perform the job at 120% to 180%, while others are only obtaining 70% to 100%. Manufacturing rates have always been easy because a machine will produce repetitive hourly rates as manned but when dealing with people, you introduce more variation. If I look at the factors on who is able to meet established rates, age is definately a contributing factor. With the current down trend in the automotive industry, I am beed directed to use productivity rates as one of the criteria's when downsizing. Additionally, operators have the possibility to earn a $50.00 productivity Bonus coupled with a $100.00 defect Free Bonus on a monthly basis. If I was to only keep and/or reward the younger operators, it becomes a discrimination issue

If possible, I'm looking for a system that will make the productivity requirement a challange for all operators. If the best way to establish these rates is taking an average of 3 operators, that is what we will continue to do. I will appreciate any additional thoughts you have.

Thank you

Bob Stevens
Reply With Quote
  #4  
Old 6th November 2001, 01:59 PM
energy
Unregistered Guest

 
Posts: n/a
Default Ut Oh!

Quote:
Originally posted by Bob Stevens
If I look at the factors on who is able to meet established rates, age is definately a contributing factor. With the current down trend in the automotive industry, I am been directed to use productivity rates as one of the criteria's when downsizing. If I was to only keep and/or reward the younger operators, it becomes a discrimination issue If possible, I'm looking for a system that will make the productivity requirement a challange for all operators.
What a dilema Sounds like you are trying to be fair. With you being directed to use the rates as established, you can become of one "down sizing" casualties if you try to "curve" the rate to protect the senior citizens. Profit, not people is what you are being told. Good Luck.

An "Old Man"
Reply With Quote
  #5  
Old 6th November 2001, 02:04 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Default

Bob,

To establish a fair production rate, you must do a careful study of the process itself. From my perspective, throughput needs to be determined through no fewer than 25 data points, perhaps 25 days of production on a run chart. What were the yields each day? What is the average? What are the upper and lower control limits? Your daily throughput will be in between the limits. What does the chart look like? Do we have trends, shifts, and instability of any type? For instability or outliers, have you made notes recording their causes? Once you have determined the upper and lower controls and the average, you can make some inferences in regards to the arbitrarily established production rates or the rates determined by a 3 data point average (not very likely to be of significant use as is evident with the wide range of efficiencies). Often times, you are either too hard on Production workers, or you create unnecessary idle time. Sometimes you guessed right.

When setting targets, you must work within the limits themselves. Any goal established outside of the limits is not only unfair, it will lead to trouble elsewhere in the system. Many believe that continuous improvement can only be achieved through stable and predictable process (controlled processes). I agree with this statement. However, improvement itself (not of the continuous improvement variety) can be achieved through corrective action to unstable process (processes out of control).

I would also totally eliminate the bonus program. Lots of inherent assumptions about the use of these tactics that are just plain false. People need to find joy in their work. You can help them best by eliminating the factors that rob them of this pride and joy. Make sure that Herzberg’s hygiene factors are satisfied and work to help workers find their masked intrinsic motivation. A motivated and satisfied worker is more likely to show up for work and out produce those who require incentives and bribes to do their work. Using incentives leads to the use of more and larger incentives. What will happen when your organization hits hard times and can no longer afford such luxuries?

Just some thoughts…

Kevin
__________________
"Without theory there is nothing to modify or learn." W. Edwards Deming

Last edited by Kevin Mader; 6th November 2001 at 02:08 PM.
Reply With Quote
  #6  
Old 6th November 2001, 02:17 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
Default ouch!!!!

Bob,

Definetly a tough one!


Kevin has some great points. Looks like you do need to do some more detailed studies of your assembly rates.




Quote:
With the current down trend in the automotive industry, I am beed directed to use productivity rates as one of the criteria's when downsizing.
You definitely don't want to use this as your only criteria if downsizing becomes neccessary. For yourself, why don't you develope a matrix for the department. You can list out other attributes for the assemblers. Things such as attendance, attitude, adaptability, leadership skills. Many time the older workers are the most knowledgable about the product line, can work with a VERY minimum of supervision and are dependable. If you develope your matrix now, you will have a tool to justify your recomendations at downsizing time.

Good Luck!!!!!

CarolX
__________________
CarolX

Theater is life, film is art, and television is furniture.
Reply With Quote
  #7  
Old 6th November 2001, 02:19 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Default

Thanks Carol!!
__________________
"Without theory there is nothing to modify or learn." W. Edwards Deming
Reply With Quote
  #8  
Old 6th November 2001, 02:35 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Default

Bob,

Were there rates established during the quoting process and contract review.

A machine has an output limit that cannot usually be met because of preventive maintenance, tool wear/breakage, bathroom breaks etc... These are all excuses that should be defined before the process goes into production.

A: The campany has to have a minimum production rate to be profitable.

B: This needs to be determined during product realization as a part of the quoting and feasibility process.

C: If a production rate is set then all employees should meet that requirement.

D: If need be, employees need to be re-trained and if that doesn't work they need to be disciplined in some manner.

E: If an employee receives enough write-ups there needs to be a process of getting rid of the employee or re-assigning them.

By all means keep as much documentation as possible to back your future position.

As a personal note I would say that any type of study should include as many employees as possible. Put the Qualitty or Production Managers on the line and see what they do. At the very least I think that any such study should cover at least a months worth of data. 1 man with a stop clock watching an 8 hour shift is surely not enough to get a full picture of the process.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Preventive Action and Continuous Improvement

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Effectiveness, miss rate and false alarm rate - Need formulas to calculate nurcan Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4 18th April 2007 02:49 AM
Mortgage Rate Data on average 30 year fixed mortgage rate Andy Nutt Coffee Break and Water Cooler Discussions 5 19th May 2006 06:25 PM
Miss rate & False Alarm Rate - What are they and how are they calculated? paulo Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2 1st September 2004 03:25 PM
Developing Manual Assembly Productivity Rates Bob Stevens Manufacturing and Related Processes 4 7th February 2002 09:42 AM
SPC for productivity - Monitor the productivity level? margherita SPC Monitoring and Statistical Analysis Techniques 1 3rd November 1999 10:14 PM



The time now is 11:44 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts