Weld Repair and Nonconformance reporting


Search the Elsmar Cove
Search Elsmar
Monitor the Elsmar Forum
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page  Elsmar Cove Twitter Feed
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links

Donate and $ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:

Howard's
International Quality Services
Marcelo Antunes'
SQR Consulting
Bob Doering's
Correct SPC - Precision Machining

NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  Post Number #1  
Old 17th November 2009, 04:46 PM
irish01

 
 
Total Posts: 25
Weld Repair and Nonconformance reporting

Hi guys,

I have worked for manufacturers where almost everything was documented/tracked via NCR--and that worked great for that org.

I am currently revising our Nonconformance reporting Level 2. We have a statement in our Level 2, "If it is determined that the nonconforming condition will be removed or corrected during subsequent planned manufacturing operations, the item may be accepted and no formal nonconformance report is required."

Our company subs out and manufactures welded components. This clause applies because welds may be run, in the course of NDE they may be found to have indications, the suspect welds can be removed, the welds re-run & retested again, and the 2nd time around you are golden and can keep on trucking. This clause suggests that a NCR would not necessarily have to be initiated since the (bad welds) condition would be corrected during subsequent manufacturing operations (digging them out & welding again--unplanned, but definitely subsequent). If no one reported it, you might never know any weld rework had occured.

I've got 2 issues with this clause;

1. If one is not necesarily required to report these types of activities on a NCR, how would you know that "more weld repair was happening than should be" (assuming you had a baseline--which we do not)? Though we have company WPS and PQRs, there are many parameters that affect welds so the idea of a predictable "baseline" when these are not fully automated processes can get hairy.

2. Our suppliers who do welded metal fab--some suppliers document almost every repair to be on the safe side, some are kind of loose about it. Its hard to make supplier-supplier comparisons. You don't know if a supplier just has terrible operators/processes or if the NCRs they are giving you are expected "business as usual" (once again, there are no baselines available).

My gut feeling is I'd like for this procedure to be a little more specific and not so much of a "judgment call" as to when to issue an NCR for weld repair, per the above clause. I'd like to define it better for the org, if possible.

Do you think this is reasonable? This might be giant can of worms but we get enough supplier weld NCRs to give me pause for thought.

Does anyone in the Cove have experience documenting processes such as non-automated weld repair (or anything else like this) via NCRs?

I hope I've made myself clear! :-) TIA for anything you can offer!

Sponsored Links
  Post Number #2  
Old 17th November 2009, 08:08 PM
Miner's Avatar
Miner

 
 
Total Posts: 3,597
Re: Weld Repair and Nonconformance reporting

This was probably written that way to prevent an unmanageable number of NCRs, but you have a valid concern. A Deming approach would be to run a p-chart or c-chart on the process. When in control, no NCR. When it exceeds the UCL, write an NCR. This will also provide the necessary data to compare suppliers, etc.
Sponsored Links

  Post Number #3  
Old 17th November 2009, 08:28 PM
bazzle - 2012's Avatar
bazzle - 2012

 
 
Total Posts: 46
Re: Weld Repair and Nonconformance reporting

We have similar processes.
It is not worth recording for recordings sake.
From time to time we make a study of rework and investigate rework, process methods and improvement strategies.
This may lead to process changes, training or just leave everything as it is as the MD is happy with current costings from that area.
Sometimes you draw a line in the sand, sometimes you have to know when to put your head in the sand
Returns to that major work area are monitored to see if any related issues need further improvement and are tabled and actioned at regular manufacturing group meetings not on CA's etc.

Bazzle
  Post Number #4  
Old 18th November 2009, 02:34 PM
irish01

 
 
Total Posts: 25
Re: Weld Repair and Nonconformance reporting

Really appreciate the input so far! Looks like I might have to put this down my priority list just a *bit*!! :-)
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Nonconformance and Corrective Action

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Differences between a Safety Nonconformance and a Quality Nonconformance njoynlf Nonconformance and Corrective Action 14 26th October 2011 08:27 AM
Nonconformance Reporting - Would anyone have a good nonconformance spread sheet? Ron Tollett Documentation Control Systems, Procedures, Forms and Templates 10 20th August 2011 09:51 AM
Supplier ScoreCard Question - Declared NonConformance vs Undeclared NonConformance Lpitt56 Supplier Quality Assurance and other Supplier Issues 3 19th February 2007 12:28 PM
Customer Satisfaction Reporting Metrics - Reporting to upper management? Scania22 - 2011 Documentation Control Systems, Procedures, Forms and Templates 3 9th December 2006 09:03 AM
Weld Stepper Validation in production weld-cells dtrebel Preventive Action and Continuous Improvement 6 2nd November 2004 07:05 AM



The time now is 07:24 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272
NOTE: This forum uses "cookies".
no new posts