The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > National and International Business Standards > Customer and Company Specific Requirements


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 3rd December 2001, 04:26 AM
Hermann Hermann is offline
Involved in Discussions

Registration Date: Aug 2001
Location: Germany
Age: 57
 
Posts: 63
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 40
Karma: 270
Hermann is appreciated, and has over 200 Karma points.Hermann is appreciated, and has over 200 Karma points.Hermann is appreciated, and has over 200 Karma points.
Question FordSpeak

Quote from Materials Management Operation Guidelines:

Facilities shall take initiative to minimize total system obsolescence exposure. A process for recording and maintaining high-point material authorizations shall exist for obsolescence claims purposes. Functional build material shall always be available in a timely manner for running change parts.

We are a facility and this is giving me a headache. Anyone have a simple example of what is required?

Thanks
Reply With Quote

Sponsored Links
  #2  
Old 6th December 2001, 04:49 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
I Say...

I'm sorry I won't be of much help as I'm really just getting into this again after a few years. And I'm looking at things from the transportation end.

> Facilities shall take initiative to minimize total system
> obsolescence exposure.

This one has me stumped. It depends upon how they define "total system".

> A process for recording and maintaining high-point
> material authorizations shall exist for obsolescence
> claims purposes.

I'll venture this. Most automotive related companies go through the APQP process. Once a part goes live, at least for a few years there are typically changes made in reaction to problems identified as the process continues. If you're heard the term "running change" you'll know that the part is being run and a change is being made. Sometimes there's no issue - you can run the old part out (the change is small enough that the customer will use up the previous version), make your line change and start the new part. But - in some instances the change is significant and so parts you made (if any) after a certain point are parts you cannot use or sell. For all intents and purposes, they're scrap. Now the question becomes who takes responsibility for the cost of that scrap? Did the customer require the change because of an issue on their end or did your company screw up or what? This all said, they want you to have a system to track the change-over process and that system must include parts counts, the date and time of the actual changeover and other related stuff - which should be normal procedure anyway in this day and age.

> Functional build material shall always be available in a
> timely manner for running change parts.

This just says you better have a way to get a change through and implemented 'in a timely manner'. This is going to depend upon the change required and every situation will be different - the reason for the weasel words 'in a timely manner'. Heck, the change could be so significant a new machine may be needed - maybe the change is from grind - to -> grind and then hone because the design change is for a lower surface roughness callout. These things all have to be negotiated during the request for design change process.

Just some thoughts.
Reply With Quote
Sponsored Links

Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > National and International Business Standards > Customer and Company Specific Requirements

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
How do I set up a PPM with Total pcs shipped vs. Total Scrap for the month aliasJohnQ SPC Monitoring and Statistical Analysis Techniques 10 16th October 2009 11:28 AM
TPM (Total Productive Manufacturing) vs. TQM (Total Quality Management) vishal Definitions, Acronyms, Abbreviations and Interpretations 17 3rd March 2004 04:32 PM
OTC S/W in Medical Devices (managing obsolescence) QUALITYTRAINER ISO 13485 - Medical Devices - Quality Management Systems 2 17th December 2003 11:51 AM
OSHA Exposure Limits - Regulations for Exposure Information Sam Various Other Specifications, Standards, and related Requirements 1 6th July 2001 05:55 PM
Inspector Efficiency - Total hours spent divided into total number of finals complete Dawn Inspection and Test, Sampling and Related Topics 3 12th May 2000 06:27 AM



The time now is 01:52 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts