Stage 1 vs. Stage 2 - ISO 14001 Registration Audits
Would someone please explain what Stage 1 and Stage 2 are? Is this the equivalent of ISO 9001 document review by the registrar and the registrar's assesssment audit?
The more details, the better! Thanks in advance!
|

9th December 2001, 09:47 PM
|
 |
Still plugging along
Registration Date: Nov 2001
Location: Texas
|
|
Posts: 502
Thanks Given to Others: 4
Thanked 9 Times in 7 Posts
Karma Power: 44
|
|
Yep
Marc,
I don't usually cruise this area but popped in here tonite for a look around.
You are correct. Stage I is the document review, but also entails the site tour and the planning for the audit and some other tidbits (like identification of legal req's). Stage I is typically 2 days vs. the one day 900X doc review. Stage II is the conformance audit, like main assessment for 900X.
The registrar should be able to provide you with an itinerary for the Stage I audit.
|

9th December 2001, 10:50 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Karma Power: 605
|
|
Thanks! I'm also following http://16949.com/Forums/showthread.php?s=&threadid=3772
Just looking for all the details I can get. What I'm getting is that it is somewhat registrar dependent.
|

10th December 2001, 10:54 AM
|
 |
Super Moderator
Registration Date: Jun 1999
Location: Greenwood (Ft Smith area), Arkansas, USA
Age: 58
|
|
Posts: 6,224
Thanks Given to Others: 33
Thanked 1,248 Times in 807 Posts
Karma Power: 397
|
|
It's pretty much a standard procedure to divide the document review from the "registration"audit. I think the RAB even requires it.
|

10th December 2001, 03:21 PM
|
 |
Still plugging along
Registration Date: Nov 2001
Location: Texas
|
|
Posts: 502
Thanks Given to Others: 4
Thanked 9 Times in 7 Posts
Karma Power: 44
|
|
Not required
You can do "back-to-back" assessment - but it is stupid and very hard for the assessors to do.
|

12th December 2001, 05:34 PM
|
 |
Still plugging along
Registration Date: Nov 2001
Location: Texas
|
|
Posts: 502
Thanks Given to Others: 4
Thanked 9 Times in 7 Posts
Karma Power: 44
|
|
Here's additional info
Marc,
You were looking for some "details", so here you go:
At Stage I, you should have the following information available: [list=1][*]records of the environ. aspects and their assoc. impacts and the determination of sig. envir. aspects[*]applicable regulations (including licenses and permits), agreements with authorities and any company reports[*]environ policy[*]objectives and targets[*]environmental program[*]records of communcations[*]environ. doc required by the standard[*]relevant documentation from QMS or H&S systems[*]corrective and preventive action records[*]internal audit program and reports[*]mgt. review meeting minutes[*]site and drainage plans[*]any relevant process flow diagrams[/list=1]
There should be a site tour to: - verify the site plans ( for drains, buildings, local community, site aspects, etc)
- identify potential environ. aspects
- identify current controls/performance
- identify areas and personnel to visit on assessment
- identify activities/processes
- identify waste streams, emissions and discharges
- familiarize for stage 2
The Aspects will be reviewed to 1) identify Aspects ( direct control and those that the company can influence) 2) validate the procedure for screening aspects for significance 3) significant environmental impacts (properly determined) 4) procedure applied consistently and records up to date
There will be a review of Legal and other requirements to make sure that they are 1) identified 2) procedure applied to identify, have access to and periodically evaluate compliance
The Communications will be reviewed - both internal and external
The continual improvement program will be reviewed to ensure: 1) objectives and targets are relevent and consistent with policy, are correctly established and support the continual improvement program 2) appropriate programs and plans to achieve objectives 3) performance measurement and reporting 4) the company's mgt. addresses the necessary issues through mgt. meetings or other appropriate means
The review of EMS documentation and internal audits are basically the same as QMS, but integration with other company systems would be looked at.
Is this more like what you were looking for?
|

13th December 2001, 03:57 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Karma Power: 605
|
|
Thanks! That will do quite well - and I appreciate the details!
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|