The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > National and International Business Standards > TL 9000 Telecommunications Standard and QuEST


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th December 2001, 07:31 PM
johnnybegood johnnybegood is offline
Involved - Posts

Registration Date: Jun 2001
 
Posts: 125
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 37
Karma: 47
johnnybegood has less than 100 Karma points so far.
Default TL 9000 - Element 4.9 Significant Change

In Element 4.9.HV.1 it state that each time a significant change is made in the established operation (eg. A new operator, new machine, or new technique) a critical examination shall be made on the first units processed after the change.

We are in PCB assembly manufacturing. Our team members were deliberating over what is meant by ‘significant changes’. We were further confuse by the example given above such as new operator. Someone say that when there is a change in shift (‘new’ operator) the first unit processed has to be examined. Others argue that it should not be the case unless there is a product or model change. In a situation when there is a model change where 95% of the piece part/process are similar and only 5% are different would that consider a significant change? What is the right interpretation for ‘significant changes’?
Pls. advised.
Reply With Quote

Sponsored Links
  #2  
Old 14th December 2001, 09:03 AM
HFowler's Avatar
HFowler HFowler is offline
Involved - Posts

Registration Date: Aug 2001
Location: Rutherfordton, NC
 
Posts: 131
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 36
Karma: 15
HFowler has less than 100 Karma points so far.
Question

Johnnybegood,

I'm confused.
There is no clause 4.9 in ISO 9001:2000.
Clause 4.9 in ISO 9001:1994 makes no mention of "significant change".

Where is this requirement coming from?

Regards,
Hank Fowler
__________________
Insanity - believing results can be changed without changing the processes that create them.
Reply With Quote
Sponsored Links

  #3  
Old 26th December 2001, 04:52 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
The Hat

I expect he's referring to a QS-9000 requirement, but I don't see it said there. I'm not sure what the HV.1 is coming from.

johnnybegood: We need more info.
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
  #4  
Old 26th December 2001, 07:29 PM
johnnybegood johnnybegood is offline
Involved - Posts

Registration Date: Jun 2001
 
Posts: 125
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 37
Karma: 47
johnnybegood has less than 100 Karma points so far.
Default

Sorry guys. It was actually in TL9000 requirement.
Reply With Quote
  #5  
Old 26th December 2001, 09:44 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Unhappy

I haven't seen many TL 9000 folks here. Sorry I can't help out.
Reply With Quote
  #6  
Old 30th December 2001, 12:21 PM
Rea Rea is offline
$ Contributor

Registration Date: Nov 1998
Location: N. Ireland
 
Posts: 49
Thanks Given to Others: 2
Thanked 2 Times in 2 Posts
Karma Power: 45
Karma: 13
Rea has less than 100 Karma points so far.
Default

I beleive that "new" operator refers to one who is new to the particular operation, not necessarly at a shift change. It may be necessary to check first off at a shift change but that would depend on the process.

4.9.HV.2 Operation Quilifactions would also be applicable to a new operator.
Reply With Quote
  #7  
Old 3rd January 2002, 06:14 PM
E Wall's Avatar
E Wall E Wall is offline
Just Me!

Registration Date: Jun 2001
Location: Southeast USA
 
Posts: 482
Thanks Given to Others: 67
Thanked 26 Times in 21 Posts
Karma Power: 63
Karma: 977
E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.
Default

I've been out for vacation these last 3 weeks, notice lots! of posts so it will take time to get throught them all.

Johnny, you posted:
In Element 4.9.HV.1 it state that each time a significant change is made in the established operation (eg. A new operator, new machine, or new technique) a critical examination shall be made on the first units processed after the change.

We are in PCB assembly manufacturing. Our team members were deliberating over what is meant by ‘significant changes’. We were further confuse by the example given above such as new operator. Someone say that when there is a change in shift (‘new’ operator) the first unit processed has to be examined. Others argue that it should not be the case unless there is a product or model change. In a situation when there is a model change where 95% of the piece part/process are similar and only 5% are different would that consider a significant change? What is the right interpretation for ‘significant changes’?
Pls. advised.


My interpretation (what-is-right is just too arguable to claim) is: If your processes are protected to the point that a change in operators cannot affect the quality of the product being run...then there is little point in a critical examination.

To me - you should examine parts produced only when you need to do so to ensure the quality is being maintained (tooling change; product change-over (if multiple types are produced on same equipment); etc...). Your records should be taylored to identify, measure and be available to analyze what your specific needs are.

My questions would be: What do you have identified as 'critical or significant' characteristics for your parts? How do you ensure they continually meet spec? What fail-modes or defects have occured in each process? What are the turnbacks (extra handling of product or extra work done by operator to keep line running) in each process?

Based on the answers I would direct you to set up your examinations when a change occurs that has a high liklyhood (sp?) of causing/creating a quality issue. And as I stated before...your records should be set up so you can measure and analyze the occurance hazards you may deal with.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > National and International Business Standards > TL 9000 Telecommunications Standard and QuEST

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Is a written procedure required for handling significant change? Le Chiffre ISO 13485 - Medical Devices - Quality Management Systems 7 1st September 2008 09:34 PM
Do I have to write a procedure for every element in QS-9000? jasone QS-9000 - American Automotive Manufacturers Standard 13 25th April 2003 08:47 AM
QS-9000 Element 4.10.5 jcricehf QS-9000 - American Automotive Manufacturers Standard 3 29th October 2002 10:45 AM
QS 9000 Element 4.15 ( 4.15.6.4 Shipment Notification System) Jim W QS-9000 - American Automotive Manufacturers Standard 2 17th June 2002 04:34 PM
Record Retention - QS-9000 Element 4.5 metga Records and Data - Quality, Legal and Other Evidence 7 28th February 2001 11:41 AM



The time now is 07:20 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts