The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 19th December 2001, 09:02 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Read This! CNC Machining Operations Sampling Plan

Some interesting thoughts:

From: (Jon S.)
Newsgroups: misc.industry.quality
Subject: Re: In Process Insp. Sampling
Date: Tue, 18 Dec 2001 19:59:31 GMT

On Fri, 07 Dec 2001 09:46:32 -0600, Michael wrote:

>Can anyone shed some light on how to determine reasonable sampling rates
>for in-process inspections of CNC machining ops? Is the procedure any
>different for determining rates for manual machining ops such as drill
>press ops, manual mills etc?
>
>I realize that tolerances will have something to do with it, but I'm
>looking for a starting point. Up till now we've been more or less
>guessing but I would like to have a more scientific way.
>
>Thanks in advance.
>
>Mike Bielert
>Quality Assurance Manager
>Custom Castings Ltd

Mike,

I'm very late to this discussion (we just passed an ISO audit yesterday, so, I'd been away concentrating on that). I didn't see a lot of replies, and I feel like typing and babbling today, so my apologies upfront. Some of this is "well, duh" stuff. But, I'm the only Quality guy here, and, since the audit, I've endured my boss telling me how it's all just for marketing and how the _auditors_ are generating the new ISO revision so they have job security. And how he doesn't like the new standard because he has to do work. So, I need to talk "real quality" to someone, anyone. *sigh*

Anyway...

It seems to me like the "scientific" way to set this up would be to first do some specific, detailed studies on your machine's capability.

Do a short-term study using what you obviously know is too many samples. This would give you a picture of what the true nature of your process variation is going to be, and would give you an idea of what sort of drifts are going on (i.e. is it a slow steady decline as cutting tools wear, or are you just waiting until something breaks or gets knocked out of alignment in a single event.) -To put it in quality science terms, this is essentially doing 100% inspection to determine process capability.-

After that, then you just have to apply your best judgement.

If it's a slow steady decline due to part wear or machine drift, then you can tackle it by predictive processes at a rate of sampling great enough to expose the nature and trend of the drift in time. (i.e., if the tool consistently loses 'y' units amount of cutting edge for each cycle, and you're only allowed via tolerances to be 'y * 100' units out and your natural variation is 'y * 10' units, you'd better be checking more frequently than every 100 pieces! Maybe every 20 or so.)

If it's a "wait until it breaks" type issue, then you've just got to ask yourself how many pieces you are willing to make out of spec until you catch it. (And, more importantly, you'd use this data to track and try to solve or predict whatever breaks.)

There are all kinds of inspection schemes to do these sorts of things (mil specs, spc, and on and on and on) with variations inside each, but, IMHO, because you essentially get to pick what scheme you want in each plan and your own tolerance for scrap, it's still just going to be trial and error and guess work. (The only exception I can think of is, if they aren't experienced in data tracking, making sure you've worked with the operators to understand what's needed. No data fudging, no machine fudging, no changing things because of 3 data points in the same direction, etc. etc.... These things become management and knowledge issues.)

In the end, it will boil down to Wayne's suggestion of just putting out a log sheet to collect the data and seeing what's happening. As you collect data, you'll be able to modify the frequency of sampling to meet your process's needs. (In fact, reviewing the sampling plans and data should be part of a PDCA cycle, IMHO, even if it's somewhat informal.)

As always, the first rule is to understand your machine's normal capability. Once you understand what's normal for your machine, then the sort of sampling you'll need to verify that capability becomes an academic matter. Then, all you need do is track the instances where your machine doesn't meet that capability (good or bad!) and make adjustments. If it's exceeding the previously calculated capability, then you need to recalc your control limits so you can continue to refine your process (and after congratulating your people, probably call marketing or engineering so they know your new capability). At this point, you could probably also determine a reduced inspection plan if improving process capability isn't your goal. If the process is not meeting the previously calculated capability, then you need to find out why.

IMHO, the biggest issue is training your operators so they aren't making common fallacies when trying to assess the data as they collect it. (Red/black bead examples and funnel drops are some of the classic tools. Deming's Out of the Crisis has classic discussions of some of the issues here.)

BTW, I've found that the easiest way to prevent knee jerk reactions when initiating new tracking is to collect the first few batch of data myself, and plot it before anyone else gets to it. Then, using the first plots, you can show them what normal variation is and how not to get excited at the wrong things. IMHO, false trends are the hardest thing to get people to back away from. Monte Carlo style fallacies are also a common issue, as well as false associations.

Operator: When I do "this", "that" usually happens... Me: but wait, "that" happens a lot without you ever doing "this". How does "that" happen without "this"?

I thought of another one to watch out for when initiating new machine tracking... "discovering" issues that were always there, but just ignored. This ends up being an upper management issue in my organization. A problem exists, and has generally been known about for a while by the operators, someone finally gets the notion to monitor that area, and immediately finds lots of problems.

Management assumed it was okay before (no previous data means no way to prove them wrong...), and goes off the deep end thinking someone's just started screwing up. The problem was their assumptions, but what ends up happening is the new plan you just put in place caused a bunch of pain for the people you just asked to help you. Education of the operators taking the data isn't enough. Sometimes you've got to figure out how to educate the managers around and above you of the same things.

Obviously, a good manager would look forward and see what could be done to improve. But, politics, IMHO, can be as big of a part of data collection and analysis as just using the proper technique.

Okay, I'm done with my random babbling now!

Jon
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote

Sponsored Links
  #2  
Old 20th December 2001, 06:56 AM
Elsmar Server Administrator's Avatar
Elsmar Server Administrator Elsmar Server Administrator is offline
Elsmar Server Administrator

Registration Date: Jun 1996
Location: Internet
 
Posts: 59
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 56
Karma: 10
Elsmar Server Administrator has less than 100 Karma points so far.
I Say...

I saw this response and thought it was interesting:

Newsgroups: misc.industry.quality
Subject: Re: In Process Insp. Sampling
Date: Wed, 19 Dec 2001 22:19:52 GMT
Xref: sn-us misc.industry.quality:15612

Two things to consider:

1. The machine capability is strongly dependent on the CNC program, machine stiffness, temperature, etc. -- point being there are still sources of variation, just as for manual ops. Your sampling frequency needs to account for variation in these "noise" factors, some of which vary periodically during a day or during a shift.

2. Most problems I've observed with CNC has less to do with steady state capability than with "special causes" which usually relate to tool breakage. You might want to consider some type of probe or vision test system to verify tool integrity between parts. After a while, you should also be able to estimate tool life parameters, since this type of automatic sensor and shut-down will allow you to capture tool lives exactly.

Mike Moon
Sound Mind Analysis
Reply With Quote
Sponsored Links

  #3  
Old 14th August 2003, 02:02 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default Seeking Additional Responses

I was recently e-mailed about this thread. It read:

> > The thread name is "CNC Machining Ops Sampling Plan" under the Statistical
> > Techniques & 6 sigma forum. What I'm trying to do is to determine how
> > frequent we should check parts off of a CNC Lathe. For SPC I'm using a
> > subgroup size of 5 based on the Central limit theorem, but how do you
> > determine how frequent you should take your samples?

I look at defining a sampling rate to be akin to determination of calibration frequencies which is sorta what I interpret the above posts to be saying.

But - let's hear from the pros. How do you set your sampling frequency?
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
  #4  
Old 14th August 2003, 10:00 AM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
Default

IMO, your sampling frequency is based on two events;
1- result of the initial process capability study, i.e., 125 parts selectedrandomly from 300 parts; Ppk.
2- number of pieces produced per day.

I find the sample determination based on step 2 easier to justify and less work. As a result I would use the sample size,based on your daily production, from mil-std-105, or equivalent, ac - 0, rej - 1 as a starting point.
Spread this out over the production period and you have the frequency. The sample size may be large, but this can be reduced when you can show evidence that the process is capable. From a management viewpoint it is always easier to reduce the sample frequncy than to increase it.
As always, when using statistics there are numerous ways to resolve this issue.
__________________
Sam Goody
Reply With Quote
  #5  
Old 14th August 2003, 10:07 AM
Mike S. Mike S. is offline
An Early 'Cover'

Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,773
Thanks Given to Others: 24
Thanked 51 Times in 39 Posts
Karma Power: 103
Karma: 1849
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
Default

I like pre-control for some machining operations and pre-control theory says you should aim for 6 samples between adjustments based on historical indications of how often you need to make an adjustment. I think that is a good rule of thumb.
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
Reply With Quote
  #6  
Old 18th February 2009, 01:38 PM
bobdoering's Avatar
bobdoering bobdoering is offline
Stop X-bar/R Madness

Registration Date: May 2002
Location: LaGrange, OH
 
Posts: 2,088
Thanks Given to Others: 680
Thanked 563 Times in 469 Posts
Blog Entries: 13
Karma Power: 150
Karma: 3915
bobdoering is appreciated, and has over 1700 Karma points.
bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.bobdoering is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to bobdoering
Default Re: CNC Machining Operations Sampling Plan

Quote:
Originally Posted by Marc View Post

Can anyone shed some light on how to determine reasonable sampling rates for in-process inspections of CNC machining ops? Is the procedure any different for determining rates for manual machining ops such as drill press ops, manual mills etc?

I realize that tolerances will have something to do with it, but I'm looking for a starting point. Up till now we've been more or less guessing but I would like to have a more scientific way.
As a matter of fact, precision machining offers the most sane approach to determining sampling rate. First, if the process is properly controlled you would (as an example with an OD) adjust the process to the lower control limit, allow the tool to wear until it reaches the upper control limit, then readjust to the lower limit and repeat. Take the time it takes to for this cycle, and divide by 5. Use that time as your check frequency. You may want to do it more frequently if the calculation ends up being a whole day between adjustments, to catch special causes before making gobs of scrap. But, the minimum frequency is pretty straight forward. It should give you enough resolution to avoid overshooting your control limits and having out of spec product. By the way...you control limits would be set at 75% of your specifications.

For more information, see: Statistical process control for precision machining
Reply With Quote
Thanks to bobdoering for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks

Tags
cnc, cnc machining, sampling, sampling plans


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Lot Capability - Forging -> CNC Machining -> Heat treatment -> Packaging NANDAKUMAR_A SPC Monitoring and Statistical Analysis Techniques 3 13th October 2009 10:30 AM
PFMEA - for Sawing, CNC and Manual Machining coe8910446 FMEA and Control Plans 1 9th June 2008 04:17 PM
CNC Machining of Small Engineering Plastic Parts for the Semicon Industry Miloc Manufacturing and Related Processes 5 12th December 2007 09:42 AM
Does anyone have a Template of Failure Modes for Machining Operations? cjtravis FMEA and Control Plans 4 11th August 2006 01:13 PM
CNC Machining Lathe Process Aspects & Impacts deva_rhs ISO 14001 and Environmental Related Standards 1 14th December 2005 06:26 AM



The time now is 10:21 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts