The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Records and Data - Quality, Legal and Other Evidence


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
View Poll Results: Do you formally utlilize level IV Documents in your system If yes state how and why.
Yes 7 46.67%
No 8 53.33%
Voters: 15. You may not vote on this poll

Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 1st January 2002, 07:29 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Question Does your company use or reference level IV documents in their Quality plan?

Answer honestly, Does your company use or reference level IV documents in their Quality plan?

Looking for explanation as to why if you you do!!!!
Reply With Quote

Sponsored Links
  #2  
Old 1st January 2002, 09:29 PM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
Default

Most of the systems I've set up reference forms in the level 2 or 3. I usually correlate the form number to the procedure or work instruction. I think it just makes life easier - after all with control meaning to prevent unintended use - how can you not control them? Some Level 4's have the instructions right on the document.
Reply With Quote
Sponsored Links

  #3  
Old 1st January 2002, 10:57 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
BIG Smile

Hey Al,

I once referenced Level 4 in my Document Pyramid as Records. However, I took it out shortly there after since it seemed only to confuse the matter. Now, I basically reference the Quality Program as a three tier pyramid with the records a detached fourth section.

I don't know that it matters how many levels one creates. However, the one level serves all, or the unstructured Quality Program appears to me to be the most confusing approach. We had a discussion along these lines a few years back, so by doing a search you might find some interesting information. In those days, I was not big on the unstructured, one-level serves all back then based on a consulting job I took on. However, Marc commented back then that in his opinion, he saw no way in getting around having the hybrid of both the structured and unstructured programs. I think he is right on this point and have recognized that within the systems/programs I have set up, I had both represented.

Regards,

Kevin
__________________
"Without theory there is nothing to modify or learn." W. Edwards Deming
Reply With Quote
  #4  
Old 2nd January 2002, 10:51 AM
JodiB's Avatar
JodiB JodiB is offline
Still plugging along

Registration Date: Nov 2001
Location: Texas
 
Posts: 502
Thanks Given to Others: 4
Thanked 9 Times in 7 Posts
Karma Power: 44
JodiB has disabled his/her Karma.
Default Not sure if I understand

Al, do you mean are level 4 documents mentioned in the quality manual? Or do you really mean quality plan? The reason I ask is because we have quality plans (project quality plans to be specific) and I don't understand if you mean those.

If you mean in general, do we mention level 4 documents...In the QM I've outlined our documentation as 5 levels : 1)Quality Manual, 2) System level procedures and work instructions, 3)Department and Regional level procedures and work instructions, 4) project specific procedures and 5)manuals and quality plans.

I have forms, templates. labels, and records as separate from the hierarchy - just listed as additional documentation bullet points.

Within our quality plans, we really only mention the applicable procedures for the project (usually the operations manual plus any project specific procedures).
Reply With Quote
  #5  
Old 2nd January 2002, 11:11 AM
M Greenaway's Avatar
M Greenaway M Greenaway is offline
Courtesy Access

Registration Date: Dec 2001
Location: England
 
Posts: 1,643
Thanks Given to Others: 10
Thanked 63 Times in 44 Posts
Karma Power: 80
Karma: 794
M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.M Greenaway is appreciated, and has over 700 Karma points.
Default

Forms are referenced as a level 4 document in QS9000, if you are interested.

In this high tech age will we see the end of this necessary structure to documents that dont mean anything to anyone. If I were an operator I would like a single point of contact to the information I want. Couldnt QMS text be in a searchable database that provides a set of results to a keyword, such as provided by Yahoo and other internet search engines.
Reply With Quote
  #6  
Old 2nd January 2002, 12:43 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Lucinda,

I was meaning the typical document structrure as outlined in QS,TS,ISO, etc... that calls out four levels of documentation.

I was not lookink far enough down into individual quality (improvement) projects/plans.

From my experience there seems to be a generalized structure as follows:

Level I: Quality Policy Manual
Level II: Procedures
Level III: Forms, templates, instructions,documents
Level IV: ??????????????????????????.

I was looking for input on why people denote level IV documents for a future cove project.

I'll post futher personal views when an if applicable, just on a fishing trip right now!

--------------------------------------------------------------

To all so far, thanks for the input and keep it up?
-------------------------------------------------------------


Are Level IV documents required? (just a teaser)
Reply With Quote
  #7  
Old 2nd January 2002, 06:42 PM
gpainter gpainter is offline
Courtesy Access

Registration Date: Sep 2001
Location: Southern Indiana
Age: 47
 
Posts: 941
Thanks Given to Others: 3
Thanked 29 Times in 25 Posts
Karma Power: 65
Karma: 696
gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.
Default

We have a four tier system
Quality Manual
System Procedures
Work Instructions
Records/objective Evidence
Reply With Quote
  #8  
Old 2nd January 2002, 10:36 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
GP,

Where would, sayyyyyy, your corrective action or preventive action form fit in the structure?

No right or wrong, just interested.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Records and Data - Quality, Legal and Other Evidence

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Do your quality documents have the company logo on them? Meggsy Documentation Control Systems, Procedures, Forms and Templates 20 15th May 2009 12:49 PM
Corrective Action Plan in Molding Company (Quality Assurance) Przemek Nonconformance and Corrective Action 6 31st January 2008 03:24 PM
Quality Bonus Plan - Determining how much money the company saved? OCCUL Quality Assurance and Compliance Software Tools / Solutions 3 18th March 2007 11:20 PM
Controlled documents vs. Hardcopy documents printed for reference only. mike5_5 Documentation Control Systems, Procedures, Forms and Templates 13 2nd December 2005 10:12 AM
Tier 2 & Tier 3 Documents Numbering scheme (Level 2 and Level 3) documents energy Documentation Control Systems, Procedures, Forms and Templates 26 26th June 2001 04:28 PM



The time now is 08:37 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts