The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 10013 - Quality Management System (QMS) Manuals


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 15th January 2002, 12:12 PM
JodiB's Avatar
JodiB JodiB is offline
Still plugging along

Registration Date: Nov 2001
Location: Texas
 
Posts: 502
Thanks Given to Others: 4
Thanked 9 Times in 7 Posts
Karma Power: 44
JodiB has disabled his/her Karma.
Question Shall vs. Is

In two of the ISO courses I took, the instructors said that you don't use the term "shall" in your quality manual, you say it as if it "is" being done. Ex. Design changes are reviewed, approved, and documented...rather than....Design changes shall be reviewed, approved, and documented.

I was very good about doing this in the QM and the earlier upper level procedures, but I find myself straying from it as I write some of the departmental procedures. The reason is that I'm writing these procedures specifically to address some problems that we're having and so the tone I've adopted is more of a "you will do it this way" than a "this is the way that we do this". For ex.: "When one of the offices is managing a contract that was bid out of another office, a job file shall be maintained by both offices."

Is this wrong? I find it really hard to always speak in the present because what I have to cover here are all the variables. Many times part of the sentence is something like:. .. "In these instances, the regional office shall continue to follow ....."
Reply With Quote

Sponsored Links
  #2  
Old 15th January 2002, 01:30 PM
JRKH's Avatar
JRKH JRKH is offline
Involved - Posts

Registration Date: Apr 2001
Location: Cincinnati, Ohio
Age: 54
 
Posts: 618
Thanks Given to Others: 57
Thanked 59 Times in 31 Posts
Karma Power: 95
Karma: 2397
JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.
Thumbs up Lucinda,

I think you are on the right track. In the QM, and top level doc's you are trying to codify what you do, thus you say "we do these things", for example, "Adequate resources ARE provided".

However when writing instructions, it needs to be more direct and active. I don't even like using "shall" in instructions. I prefer "will", or "must", or "needs to". They leave little room for squirm.

It really comes down to who you are writing to. The QM is written to those outside of the org. i.e. customers and registrars. Therefore you say "Yes we do these things". Procedures are internally addressed and you say, "This is HOW WE WILL do this thing." (and ve hav vays off meeking you )

Well enough of my rambling.

Anyone else?

James
__________________
Low tech is better than no tech.

The only constant is those who declare, "Things around here will never change!!"
Reply With Quote
Sponsored Links

  #3  
Old 15th January 2002, 02:19 PM
energy
Unregistered Guest

 
Posts: n/a
Read This! Really?

A quick check of our consultant supplied QPM shows approx. 50% of it uses the word XXXXX “shall” and the other half says, XXXXXX “ensures that”. The QPM is written pretty much like the standard. As we have a lot of Consultants here at the Cove, as evidenced by the latest poll on Company size, what does use the word “shall” indicate to the rest of you? Managers are welcome. Inspectors. Anybody. For example, we say that in the event of a fire or emergency an alarm will be sounded and all employees “shall” assemble in the parking lot for attendance. There is no other choice. I guess we could say that company XXXXXXX assembles in the parking lot. This would be the Tier 2 document that Lucinda refers to. That appears to be talking to outside sources. Before I use the “Find and replace” feature in “Word”, can anybody else jump in here and tell me that this is really necessary. No disrespect Lucinda or James. But sometimes we have question things said in a classroom. The QPM is for use in the Company, more so than Customers who want a copy. No? It acts like a blueprint to locate procedures. No? I’m confused.

db, where is the shall?
Reply With Quote
  #4  
Old 15th January 2002, 02:26 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
Default

Hi Lucinda,

My system is set-up along the lines described by James.

Policy manual states what we are doing....
Procedures are how we shall accomplish this.

Lots a Luck!

CarolX
__________________
CarolX

Theater is life, film is art, and television is furniture.
Reply With Quote
  #5  
Old 15th January 2002, 02:42 PM
JodiB's Avatar
JodiB JodiB is offline
Still plugging along

Registration Date: Nov 2001
Location: Texas
 
Posts: 502
Thanks Given to Others: 4
Thanked 9 Times in 7 Posts
Karma Power: 44
JodiB has disabled his/her Karma.
Default defined....

Quote:
Originally posted by JRKH
...However when writing instructions, it needs to be more direct and active. I don't even like using "shall" in instructions. I prefer "will", or "must", or "needs to". They leave little room for squirm....
You may find this interesting...In the list of terms that I defined in the Quality Manual for use throughout our Quality System, I drew a distinction between the use of the word "shall" and "will".

"Shall" = Use of this word means the action described is mandatory; "Will" = Use of this word shows intent; use of this word means the action described is not mandatory.

Maybe I didn't need to do this but thought it might be prudent to provide an "out" for some actions that "should" be done but don't "have" to be done exactly that way, every time. And I confess that I lifted this out of another company's definitions thinking it was a good idea.

But "shall" is not used in my QM - Those statements are all affirmations that we "do" things as I described above.

Except for the temptation to use it in the body of my procedures, the only real home for it is in the Responsibilities section of each procedure. As in : The Procurement Manager shall: (bullet) ensure XXXX (bullet) ensure XXXX, etc.
Reply With Quote
  #6  
Old 15th January 2002, 04:05 PM
E Wall's Avatar
E Wall E Wall is offline
Just Me!

Registration Date: Jun 2001
Location: Southeast USA
 
Posts: 482
Thanks Given to Others: 67
Thanked 26 Times in 21 Posts
Karma Power: 63
Karma: 977
E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.E Wall is appreciated, and has over 900 Karma points.
Money I'll ante up with my 5 cents....

I cannot believe we're alone here, but our manual isn't just written for outsiders...it is our core Management tool. Simply, it is the foundation that directs, and is supported by, all of our processes. Every new staff member is told to read it, learn what is applicable to their functions, and review it and any associated procedures periodically (this usually happens before an internal audit that includes thier involvment).

The manual we have uses both phrases "to ensure" and "shall ensure". The most recent update (now posted on an intranet) does a much better job of stating what is done and then provides the hyperlinks to a referenced QC Procedure, but it too includes shall statements.

Brief Example:
Standard states: "The supplier shall review..."
Our QM states: "It is XXX policy to review all..." then goes on to say "The review process shall ensure that...."


We are working on putting all plant level WI on the intranet also and, as applicable, hyperlinks will be created in the QCPs leading to WI for each facility (goal is to standardize whenever feasible). This will actually happen as we each transition to the y2k version.

Energy: There is no requirement that you not use shalls in your QM. It is up to you and how you use the word (IMHO).
Reply With Quote
  #7  
Old 15th January 2002, 04:50 PM
Alf Gulford Alf Gulford is offline
An Early Cover

Registration Date: Aug 2000
Location: Portland, OR
 
Posts: 118
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 40
Karma: 15
Alf Gulford has less than 100 Karma points so far.
Default

Gotta go with Eileen, here. We emphasize that the Quality Manual is for our people to use (not that they do, much) as well as a potential marketing tool.

I've had auditors that say we shouldn't use the word and others don't seem to care one way or another. We use it when it fits and don't worry about it.

Alf

Hey, what gives here? My picture was supposed to show up this time. I read the instructions on Avatars and thought I had it figured out. I guess when you grow up using slide rules instead of computers, it takes a little longer to get these things right.

And besides that, I'm sure I saw some mention of a bottle of whiskey when you pass the 100 entry mark.

Last edited by Alf Gulford; 15th January 2002 at 04:56 PM.
Reply With Quote
  #8  
Old 15th January 2002, 05:15 PM
db's Avatar
db db is offline
Where's the shall?

Registration Date: Jul 2001
Location: Plymouth, MI
Age: 53
 
Posts: 2,202
Thanks Given to Others: 208
Thanked 166 Times in 128 Posts
Karma Power: 129
Karma: 2579
db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.
Lightbulb Shall? Will?

quote:
-------------------------------------------------------------
Originally posted by energy
db, where is the shall
-----------------------------------------------------------

I wasn’t going to respond to this thread, but seeing as though energy is going to demean my character (by challenging me to respond)….Actually considering my “Where’s the Shall”, I understand his comment.

To some “shall” indicates future tense. To others “shall” indicates a legal requirement. To me, I really don’t care if you use “shall”, “will”, “does” or whatever. Isn’t the important thing to have an effective system?

I recommend using present tense when it makes sense, and future tense where it makes sense. Please don’t get too wrapped up in the linguistics! The importance of words diminishes with the effectiveness of the system. If it works with “shall”, use shall, if it works with “do” use do. If it doesn’t work, fix it.

Good enough, energy?
__________________
Dave B (the other Dave)
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 10013 - Quality Management System (QMS) Manuals

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
The term "Quality Control Manual" - ASME B&PVC question ScottK Various Other Specifications, Standards, and related Requirements 2 12th September 2006 09:23 AM
Cpk vs. Ppk - Long Term vs. Short Term - Capability vs. Stability DJN Capability, Accuracy and Stability - Process, Machine, etc. 25 15th March 2006 01:26 AM
'Quality' Is Not Dead - A Term paper - Survival of quality (your job) Marc Misc. Quality Assurance and Business Systems Related Topics 10 31st December 2005 12:57 AM
Capability: Short Term or Long Term? Cpk= Long term and Ppk= Short term? Andrews Capability, Accuracy and Stability - Process, Machine, etc. 15 22nd January 2004 04:28 PM
What does the APQP manual mean by the term 'Periodic Requirements' Mike48 FMEA and Control Plans 2 30th March 2002 05:55 PM



The time now is 09:18 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts