The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Supplier Quality Assurance and other Supplier Issues


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 15th January 2002, 04:24 PM
David McGan David McGan is offline
Involved in Discussions

Registration Date: Jul 2003
Location: Corydon, KY, USA
 
Posts: 45
Thanks Given to Others: 1
Thanked 0 Times in 0 Posts
Karma Power: 26
Karma: 10
David McGan has less than 100 Karma points so far.
Send a message via Yahoo to David McGan
Default Subject: 7.4.1 - Scope of "Product" and "Supplier"

Sorry for this long post, but I've been grappling with the following topic, have reviewed the current QS interpretation of 4.6.2.1, asked my registrar for their intrepretation, and have studied closely the wording of ISO9001:2000 7.4.1, plus the additions of the "IATF Final Draft July 26."

With that background, here is my specific question:

What is the scope of the definition of "Purchased Product?" Specifically, is a die casting tool a "purchased product" under 7.4.1, and is the tool vendor who makes the die a "supplier" under that section?

Bear with me; it will look like I'm going into "LaLa Land," but hear me out.

7.4.1 states: "The type and extent of control applied to the supplier and the purchased product shall be dependent upon the effect of the purchased product on subsequent product realization or the final product."

This statement MIGHT be interpreted to suggest that the "product" referred to is ONLY raw material or components which are used to "realize" the final product, or suppliers of "services" such as inspection, sorting, rework that are "applied" to the product. (Note 1 in the Final Draft states: "Purchased products above includes all products and services that affect customer requirements such as sub-assembly, sequencing, sorting, rework and calibration services." It doesn't mention tooling at this point.

An interpretation that might be made is that a die cast tool is actually no different that the press in which the tool is installed; they both are involved in creating the initial "product" but neither are a PART of the "product." Therefore, suppliers of die cast dies or presses, etc. are not included in the rquirements of 7.4.1 related to "suppliers."

If that is the case, then my tool suppliers are not required to be "third party registered to ISO 9001:2002..." (7.4.1.2). But yes, they must be working toward the "goal of supplier compliance to this Technical Specification."

The above "innovative" interpretation is somewhat supported by my registrar's contention that the current IASG Interpretation (C9) for QS9000 does not apply to our subcontractors who build die casting dies. In other words, such subcontractors do not have to be registered by the end of this year. And I really don't see that much difference between the ISO 9000:2000 wording and the wording of the current interpretation.

Anybody had any good sense of direction here?
Reply With Quote

Sponsored Links
  #2  
Old 15th January 2002, 04:34 PM
db's Avatar
db db is offline
Where's the shall?

Registration Date: Jul 2001
Location: Plymouth, MI
Age: 53
 
Posts: 2,202
Thanks Given to Others: 208
Thanked 166 Times in 128 Posts
Karma Power: 129
Karma: 2579
db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.
Default Purchased Product

David,

Just a quick question:

Does the "purchased material" (a die cast tool) have any impact on "subsequent product realization or the final product"?

I think it has a dramatic impact. “Product realization” is how we move our products from concept to reality. Your tool fits, IMNSHO
__________________
Dave B (the other Dave)
Reply With Quote
Sponsored Links

  #3  
Old 15th January 2002, 04:41 PM
David McGan David McGan is offline
Involved in Discussions

Registration Date: Jul 2003
Location: Corydon, KY, USA
 
Posts: 45
Thanks Given to Others: 1
Thanked 0 Times in 0 Posts
Karma Power: 26
Karma: 10
David McGan has less than 100 Karma points so far.
Send a message via Yahoo to David McGan
Default

There's no argument at all about the tool having an impact on product realization. I'm just trying to rationalize the Note 1 (in which the "such as" only seems to mention which "go with" the final product or are used to quantify/qualify the final product.

That, coupled with my registrar's current interpretation ... which of course can change, too.
Reply With Quote
  #4  
Old 20th March 2002, 01:44 PM
Omar
Unregistered Guest

 
Posts: n/a
Laughing R&R

can any one tell me , How can I met the 4.11 Inspection , measuring and test equipment especialy 4.11.1.2 in or where can I get this information
Reply With Quote
  #5  
Old 20th March 2002, 01:45 PM
Omar
Unregistered Guest

 
Posts: n/a
Laughing R&R

Can any one tell me , How can I met the 4.11 Inspection , measuring and test equipment especialy 4.11.1.2 ,
Reply With Quote
  #6  
Old 20th March 2002, 02:44 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Default

I would ask you for some additional information concerning the last question.

Do you have the AIAG MSA manual?
Are you performing R&R, bias, linearity, and stability?

Is this related in any way to your previous question?
Reply With Quote
  #7  
Old 20th March 2002, 05:22 PM
Omar
Unregistered Guest

 
Posts: n/a
Default R&R

Dear Al dear
No Im not doing R&R rigth now but i will do it , and I need some Info to get it done bias, linearity, and stability,
And I don´t have the MSA I will get it the next week to read it

Quote:
Originally posted by Al Dyer
I would ask you for some additional information concerning the last question.

Do you have the AIAG MSA manual?
Are you performing R&R, bias, linearity, and stability?

Is this related in any way to your previous question?
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Supplier Quality Assurance and other Supplier Issues

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
ISO/TS 16949 "Certification" & "Product and Process Design" Clauses YHHTT ISO/TS 16949 - International Automotive Quality Systems Standard 5 1st November 2009 05:08 PM
Various Processes - "Management", "planning" & "feedback", oh my! irish01 Documentation Control Systems, Procedures, Forms and Templates 5 22nd January 2009 09:33 AM
What is exactly meaning of word between "Supplier" and "Vendor" ? raknaja Definitions, Acronyms, Abbreviations and Interpretations 3 13th September 2007 08:41 AM
What do "OAI" "VAI" and "NAI" used in FDA QSIT manual mean in inspections? TJG954 ISO 13485 - Medical Devices - Quality Management Systems 3 25th June 2007 01:55 AM
"Quality Hold" vs. "Nonconforming Product" - Stages of nonconformance? little__cee Nonconformance and Corrective Action 21 4th June 2007 09:09 PM



The time now is 11:08 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts