The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 18th January 2002, 07:56 AM
rui12524 rui12524 is offline
E-Mails Invalid or Rejected

Registration Date: Dec 2001
Location: Portugal
 
Posts: 22
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
rui12524 has less than 100 Karma points so far.
Laughing Maintaining manufactoring process capability

8.2.3.1 Draft ISOTS 16949:2002 says "The organization shall maintain manufactoring process capability or performance as specified by the customer part aproval process requiremts":
Well, imagine that i have a Cpk of 5.25 mentioned in the PPAP; So, i understand that i can't go below 5.25! What if i mention in PPAP (control plan) that (although CPK of 5.25 was achieved) cpk must be superior to 1.67?
Best to all
Reply With Quote

Sponsored Links
  #2  
Old 18th January 2002, 08:33 AM
D.Scott's Avatar
D.Scott D.Scott is offline
Super Moderator

Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
 
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
Karma: 4082
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
Default

There was an IASG intrepretation on this point which I am sure will apply to 16949 as well. You will find it listed as C7. It states "The intent of this requirement is based on the maintenance of the process and not the level of the indices' value. To maintain (or exceed) requires two components:
1) Monitoring of the process over time to verify capability and stability; and
2) If the process is capable and stable, then to verify that the process meets the requirements as described in PPAP 1.2.2.9.3"

The fact that you had at one point a 5.25 Cpk is immaterial. You are required to provide product meeting the requirements.

Hope this helps.

Dave
Reply With Quote
Sponsored Links

  #3  
Old 18th January 2002, 08:40 AM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
Default

Technically, yes, you need to maintain that Cpk. Which begs the question, why do so good in the first place, right?

But the theory behind it is that your PPAP parts are matched up with other suppliers PPAP parts, and a Cpk of the assembly is established. Variation outside the 5.25 Cpk parts you submit is not considered. So if you add variation, the impact is not known. It's that variation that "gets them into trouble" so to speak.

I know its theoretical, and difficult to accept if the costs of maintaining 5.25 are high, but that's the rules right now.
Reply With Quote
  #4  
Old 18th January 2002, 08:57 AM
Al Dyer
Unregistered Guest

 
Posts: n/a
Default

Jeez, did the customer let you define the spec limits!


The initial study performed during PPAP is to get an idea about variation. Long term process performance is what is important and that should not deteriorate (sp) although it will vary.

Also, I see no difference in the thought process between holding a process at 1.67 or 5.25 if those are the accurate numbers. A process is a process and performs as designed when special causes are defined and removed.

I don't see the control plan as an appropriate place to put such a disclaimer, >1.67 is the industry "norm". Let sleeping dogs lay.

Plus, don't sweat it too much until the approved TS is released.
Reply With Quote
  #5  
Old 18th January 2002, 08:59 AM
rui12524 rui12524 is offline
E-Mails Invalid or Rejected

Registration Date: Dec 2001
Location: Portugal
 
Posts: 22
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
rui12524 has less than 100 Karma points so far.
Default

Ok, so what it seems is that i need a customer specification regrading cpk; we have some customers (although not in the auto business), that specifie cpk of 1.2 and 1.67.
The question is that we have a ppk in the PPAP process that's not a true cpk (at least i think so).
Just for the record, we make injected plastic parts! so, maintaining a cpk of +5 is unreall for most of the parts, as there is much variation that we CAN?T control (material and the sorts).
Comments?
Reply With Quote
  #6  
Old 19th January 2002, 05:35 AM
Howard Atkins's Avatar
Howard Atkins Howard Atkins is offline
Forum Administrator

Registration Date: Jul 1997
Location: Revivim, Israel
 
Posts: 2,412
Thanks Given to Others: 100
Thanked 448 Times in 253 Posts
Blog Entries: 8
Karma Power: 195
Karma: 4817
Howard Atkins is appreciated, and has over 1700 Karma points.
Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Howard Atkins
Default

Quote:
Originally posted by Al Dyer
Jeez, did the customer let you define the spec limits!

Believe it or believe it not this has happened a number of times.
If the distribution is good then we have had automotive customers, French and German asking us to give them tolerances that will give a ppk of 1.67 or in one case 2.0.
They have then changed the drawing for us.
I have also seen cases where the same part is produced by diferent suppliers each with their own drawing from the customer with their name on it and diferences in tolerances.
Reply With Quote
  #7  
Old 23rd January 2002, 05:11 PM
frank-h frank-h is offline
Inactive Registered Visitor

Registration Date: Dec 2001
Location: PA
Age: 46
 
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 33
Karma: 10
frank-h has less than 100 Karma points so far.
Bomb! I know someone will be upset.

I have also seen where a part was given to two suppliers and after both have submitted samples they were given different prints. New dimensions and or tolerances so the could both provide better CPK numbers. Is it me or does this sound like the customer is over critical on the specs for both vendors. Both parts work! Why not one print that you can actually manufacture to.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
How is everyone handling TS2 Clause 8.2.3.1 - Maintaining Process Capability GoKats78 ISO/TS 16949 - International Automotive Quality Systems Standard 2 8th June 2005 07:06 AM
TS 16949 Clause 8.2.3.1 - Maintaining Process Capability p_tww ISO/TS 16949 - International Automotive Quality Systems Standard 9 11th September 2003 01:09 PM
MSA Chicken and Egg - Process Capability and Measurement System Capability M Greenaway Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1 15th July 2002 01:44 PM
4.9.2 Maintaining Process Control - Maintaining ongoing process capability MSHELLEY QS-9000 - American Automotive Manufacturers Standard 13 4th April 2001 11:44 AM
Maintaining Process Control Tom Goetzinger QS-9000 - American Automotive Manufacturers Standard 1 7th March 2000 01:33 AM



The time now is 06:24 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts