The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 17025 - Calibration, Measurement Gages and Test Laboratories > Gage R&R (GR&R) and MSA (Measurement Systems Analysis)


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 28th March 2001, 12:37 PM
NeilM
Unregistered Guest

 
Posts: n/a
Let Me Help You MSA - How do I perform a Stability Study as a part of Measurement Systems Analysis?

We are a company producing metal pressings and plastic injected moulded components to 2nd tier Automotive customers. As part of our QS9K audit in May I have been asked to implement stability studies alongside R&R studies, linearity studies (calibration) which are already in place.
I have started by taking three components produced in production, measuring each one ten times and recording the results (on a control plan feature). I have then calculated the sum, average, bias and range for each subgroup.
I have then plotted two graphs, the first being a linearity plot control chart & range chart. From this I have calculated the estimated Standard Deviation using a constant (d2) for sample size of 3. In the Ford MSA book it states that you must look for trends on the control chart as there is no need to calculate a measurement system stability number. Does anyone know if what I am doing will suffice ?? Your comments will be appreciated.
Reply With Quote

Sponsored Links
  #2  
Old 28th March 2001, 06:45 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Neilm,

It sounds similar to a method we have successfully implemented.

For a given fixture we have a calibrated master. Each Monday we take the master and verify (reset) the gage. We then measure the master five times and plot it on an X-R chart with a subgroup of five. Over time we have a picture of both the stability of the gage and also correlate it with any wear on the master, which is used to determine the calibration frequency of the master.

Short and sweet stability with added benefits.

ASD...
Reply With Quote
Sponsored Links

  #3  
Old 29th March 2001, 05:06 AM
NeilM
Unregistered Guest

 
Posts: n/a
My scenario is different as you have a calibrated master to work to and I only have a part that could measure differently depending on what method used
Reply With Quote
  #4  
Old 29th March 2001, 08:23 AM
D.Scott's Avatar
D.Scott D.Scott is offline
Super Moderator

Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
 
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
Karma: 4082
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
Without a calibrated master, the MSA recommends the following (paraphrased): use a production part that falls in the mid-range of the production requirements. Further, they recommend 3 samples from the low end, high end and mid-range and do seperate control charts for each. Then on a periodic basis (daily, weekly), measure the sample 3 to 5 times. Plot the data on an X-bar & R control chart. Establish your controls and evaluate for out of control or unstable conditions per the normal chart. Compute the S/D for the measurements and compare it with the process to determine if the system repeatability is suitable for the application. - Reading through your method I don't see measurements being taken over a period of time. I am a little confused when you add linerarity and bias to the stability study. The stability can stand on it's own while the others are best calculated on the 10 parts used in the actual R&R (just my opinion here - certainly not an expert on this).
Dave
Reply With Quote
  #5  
Old 29th March 2001, 11:50 AM
NeilM
Unregistered Guest

 
Posts: n/a
Thanks for your comments D.Scott
It is not possible for me to get 3 samples from the low end, high end and mid range of the tolerance as we produce these parts from a tool which has been cut to a fixed size. And therefore will measure what it measures (if thast makes sense!) Also is it important that we check parts so often as weekly?
Reply With Quote
  #6  
Old 29th March 2001, 12:25 PM
NeilM
Unregistered Guest

 
Posts: n/a
Also the parts we produce are often in metal which will only creep or shrink minimal amounts, which wouldnt even be picked up by the accuracy of normal measuring instruments. I.e vernier, caliper etc
Reply With Quote
  #7  
Old 30th March 2001, 09:07 AM
D.Scott's Avatar
D.Scott D.Scott is offline
Super Moderator

Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
 
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
Karma: 4082
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
You are losing me Neil - every process has variability and that variability can be measured if you use the right equipment. If your current gages don't pick it up, you are probably using the wrong gage. If the variance is minimal and insignifficant, why are you measuring at all?
You should be able to identify hi low mid parts just by isolating them when you find them through normal measurements.
Yes, the stability should be tracked at the outside weekly, although I don't know of any "rule" that says so. A longer time would introduce too many other possible variables to make me feel happy about it. We normally do daily stability checks on our Tensometer & Micro-Vu.
From what you have said, you may have to reconsider the measurement system you are using. Again - not my field so only an opinion.
Dave

Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 17025 - Calibration, Measurement Gages and Test Laboratories > Gage R&R (GR&R) and MSA (Measurement Systems Analysis)

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Stability, Bias and Linearity samples - Measurement Systems Analysis Squeeze Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5 17th October 2008 10:27 AM
When to conduct a MSA (Measurement Systems Analysis) study hwang Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5 20th August 2007 08:55 AM
Torque wrenches and drivers - How to perform MSA (measurement system analysis) mnavarro Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 9 13th January 2006 09:54 AM
Measurement System Analysis (MSA) - Bias, Linearity and Stability LM Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 10 19th December 2003 07:18 PM
Measurement System Analysis (MSA) - Requirement to also do gage stability studies? dgovin Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1 24th September 2003 02:04 PM



The time now is 05:24 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts