Product and Process Audit Procedure Example for ISO/TS 16949:2002

Search the Elsmar Cove
Search Elsmar
Monitor the Elsmar Forum
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page  Elsmar Cove Twitter Feed
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Donate and $ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:

Howard's
International Quality Services
Marcelo Antunes'
SQR Consulting
Bob Doering's
Correct SPC - Precision Machining

NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality

Related Topic Tags
process audits, ts 16949 - automotive quality system standard, product audits, procedures (general)
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  Post Number #1  
Old 14th February 2002, 11:32 AM
IGORTS

 
 
Total Posts: 51
Please Help! Product and Process Audit Procedure Example for ISO/TS 16949:2002

I´m needing a guide for audits of Proc. and Product.
Has someone any idea about where I could find a general checklist of proc. audit an product audit.

thank you

Sponsored Links
  Post Number #2  
Old 14th February 2002, 11:38 AM
Al Dyer

 
 
Total Posts: n/a
Just a link to get you started
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting this post, 3. Use at your Own Risk.
File Type: doc workplace effectiveness checklist.doc (32.5 KB, 2410 views)
Sponsored Links

  Post Number #3  
Old 14th February 2002, 12:01 PM
IGORTS

 
 
Total Posts: 51
YES

Thanks Al

Very usefull.
  Post Number #4  
Old 2nd July 2002, 05:00 PM
Manoj Mathur

 
 
Total Posts: 318
PROCESS AUDIT CHECKLIST

As Required for ISO/TS 16949:2002

QUALITY MANAGEMENT SYSTEMS
(Based on VDA 6 Part – 3)

Prepared by :

Manoj Mathur

1. Product Development

Requirements What to look for Assessor Notes / Objective Evidence
A. Product Development Planning
1. Are the customer requirements available?
2. Is Product Development Plan available and the targets are defined & maintained?
3. Are the resources for realization of Product Development planned?
4. Have the product requirements been determined and considered?
5. Have the feasibility been determined based on the available requirements?
6. Are the necessary personnel and technical conditions for the project process planned / available?
B. Realizing Product Development
1. Is Design FMEA raised and are the improvement measures established?
2. Is Design FMEA updated in the project process and the established measures realized?
3. Is a Quality Plan prepared?
4. Are the required release / qualification records available at the respective times?
5. Are the required resources available?
C. Process Development Planning
1. Are “Product Requirements” available?
2. Is a process development plan available and are targets determined & maintained?
3. Are the “Resources” for realization of Serial Production Planned?
4. Have the process requirements been determined and considered?
5. Are necessary personnel and technical preconditions for the project process planned / available?
6. Is Process FMEA raised and are improvement measure establi-shed?
D. Realizing Process Development
1. Is Process FMEA updated when amendments are made in Project Process and are the established measures implemented?
2. Is Quality Plan prepared?
3. Are the required releases / qualification records available at the respective times?
4. Is a Pre-production carried out under serial conditions for the serial release?
5. Are the Production & Inspection Documents complete and are available with concerned people?
6. Are the required “Resources” available?

ELEMENT 5 : SUPPLIER / INPUT MATERIALS

Requirements What to look for Assessor Notes / Objective Evidence
5.1 Are only approved quality capable suppliers used?
5.2 Is the agreed quality of the purchased products guaranteed?
5.3 Is quality performance evaluated and corrective actions introduced when there are deviations from the requirements?
5.4 Are target agreements for continual improvements of products and processes made & implemented with the suppliers?
5.5 Are the required release for the delivered serial products available and the required improvement measures implemented?
5.6 Are the procedures agreed with customer, regarding Customer Supplied Products, maintained?
5.7 Are the stocks levels of input materials matched to production needs?
5.8 Are Input Materials / internal residues delivered and stored according to their purpose?
5.9 Are the personnel qualified for the respective tasks?

ELEMENT 6 : PRODUCTION

Requirements What to look for Assessor Notes / Objective Evidence
A. Personnel / Qualification
1. Are the employees given responsibility & authority for monitoring the product / process quality?
2. Are the employees given responsibility & authority for production equipment & environment?
3. Are the employees suitable to perform the required tasks and their qualification maintained?
4. Is there a personnel plan with a replacement ruling?
5. Are “Instruments” to increase “Employee Motivation” effectively implemented?
B. Production Materials / Equipment
1. Are Product Specific quality requirements fulfilled with the production equipment / tools?
2. Can the quality requirements be monitored effectively during serial production with implemented inspection, measuring and test equipment?
3. Are the work and inspection stations appropriate to the needs?
4. Are the relevant details in the production and inspection documents complete and maintained?
5. Are necessary auxiliary means available for adjustments?
6. Is an approval for production starts issued and are adjustment details as well as deviations recorded?
7. Are the required corrective actions carried out on schedule and checked for effectiveness?
C. Transport / Parts Handling / Storage / Packing
1. Are quantities / production lot sizes matched to requirements and are these purposefully forwarded to next work stations?
2. Are products / components appropriately stored and the transport means / packing equipment tuned to the special properties of the product / components?
3. Are rejects, reworks and adjustment parts as well as internal residues strictly separated and identified?
4. Is the materials / parts flow is secured against mix ups / exchanges by mistake and traceability guaranteed?
5. Are tools, equipment and inspection, measuring and test equipment stored correctly?
D. Fault Analysis / Corrective Action / Continual Improvement
1. Are quality and process data recorded complete and ready to be evaluated?
2. Are quality and process data statistically analyzed and are improvement programs derived from this?
3. Are the causes of product and process non-conformances analyzed and the corrective actions checked for their effectiveness?
4. Are processes and products regularly audited?
5. Are product and process subject to continual improvements?
6. Are target parameters available for product and process and is their compliance monitored?

ELEMENT 7 : CUSTOMER SERVICE, CUSTOMER SATISFACTION

Requirements What to look for Assessor Notes / Objective Evidence
1. Are customer requirements fulfilled at delivery?
2. Is customer service guaranteed (if contractually agreed)?
3. Are complaints quickly reacted to and the supply of parts secured?
4. Are fault analysis carried out when there are deviations from the quality requirements and are improvement measures implemented?
5. Are personnel qualified for each task?
  Post Number #5  
Old 18th August 2003, 07:40 AM
Stevenli's Avatar
Stevenli

 
 
Total Posts: 32
Hi Al,

Would you please also send me a copy of this process audit checklist?

S.li@cn.ats.net
Thank you very much.
Steven
  Post Number #6  
Old 21st August 2003, 10:26 AM
Howard Atkins's Avatar
Howard Atkins

 
 
Total Posts: 2,921
Training

After discussions with VW they want training to VDA 6.3.
Has anyone had this sort of training?
  Post Number #7  
Old 30th September 2004, 09:08 AM
kapil_gupta14

 
 
Total Posts: 1
product audit & process audit

As per TS requirements Manufactring process audit to cover all manufacturing process, but whether same freq as in system audit will be applicable,mean process audit to be carried out throughout the shifts-whether in day/night.
Product audit criteria -follow controlplan
  Post Number #8  
Old 18th November 2008, 08:24 AM
alhabaty

 
 
Total Posts: 1
Thank You! Re: Product and Process Audit Procedure Example for ISO/TS 16949:2002

i want checklists include all Audit scecklists in excel sheets
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 19011 - Auditing Quality and Environmental Management Systems > Process Audits and Layered Process Audits

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
ISO/TS 16949:2002 Audit Confusion To Create Internal Auditing 21 23rd July 2008 05:57 PM
Online Internal Audit Training for ISO/TS 16949:2002? Stijloor Training - Internal, External, Online and Distance Learning 1 8th May 2008 10:53 PM
Will a one-process approach to ISO/TS 16949:2002 fly? Barahir ISO/TS 16949 - International Automotive Quality Systems Standard 67 22nd June 2006 04:42 AM
Do you think I’m capable of performing a ISO/TS 16949:2002 audit António Vieira ISO 19011 *and* ALL other Auditing Discussions 6 24th March 2006 08:24 PM
ISO/TS 16949:2002 - 6.2.2.1 Product Design Skills - Tools and techniques needed GaneshKumar.Vatturi Design and Development of Products and Processes 4 4th November 2005 10:41 AM



The time now is 05:08 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272
NOTE: This forum uses "cookies".