The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


Related Topic Tags
rework, rework and repair procedures
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 3rd August 2010, 04:01 AM
Pinkpetall Pinkpetall is online now
Registered Visitor

 
Registration Date: Aug 2004
Location: China
 
Posts: 25
Thanks Given to Others: 2
Thanked 1 Time in 1 Post
Karma Power: 38
Karma: 15
Pinkpetall has less than 100 Karma points so far.
Let Me Help You Rework Notification - Is it sufficient to show how we control rework process

Hi, everybody, nice to talk with you.
Here I draw the format to regulate the rework, is it sufficient to show how we control rework process?
Hope get your some braining suggestion, thanks in advance.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting this post, 3. Use at your Own Risk.
File Type: xls Rework notification.xls (19.0 KB, 251 views)

Sponsored Links
  #2  
Old 3rd August 2010, 04:24 AM
qusys qusys is offline
Appreciated Information Resource

 
Registration Date: Mar 2008
 
Posts: 2,043
Thanks Given to Others: 216
Thanked 645 Times in 571 Posts
Karma Power: 232
Karma: 3929
qusys is appreciated, and has over 1700 Karma points.
qusys is appreciated, and has over 1700 Karma points.qusys is appreciated, and has over 1700 Karma points.qusys is appreciated, and has over 1700 Karma points.qusys is appreciated, and has over 1700 Karma points.qusys is appreciated, and has over 1700 Karma points.qusys is appreciated, and has over 1700 Karma points.qusys is appreciated, and has over 1700 Karma points.qusys is appreciated, and has over 1700 Karma points.
Re: Rework notification

Hi,
the format seems to be accurate, but I would like to give you some inputs if accepted.
I do not see a reference to the rework instructions to be followed.
Then , who will approve if the rework went well ? In other terms, I do not see the clear responsibility ( QA mgr?) and the reference to the requirements of the re-control.
How will the reworked product be traced and identified?
How many reworks could be acceptable for your product?

These are some ideas of mine to improve the form.
I also suggest to have a procedure for this process and train the personnel on this item.
Which kind of certification do you have? Which business and product do you operate?
Hope these suggestion could be appreciated...
see you
Sponsored Links

Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Medical Device Software - Control of Nonconforming Product and Rework Elena Yakubova ISO 13485 and ISO 14969 - Medical Devices - Quality Management Systems 4 14th July 2009 04:40 PM
Audit Technique to find rework in a process area? eternal_atlas ISO 19011 *and* ALL other Auditing Discussions 17 29th August 2008 04:36 AM
Include Risk of Rework in a PFMEA (Process FMEA)? michu FMEA and Control Plans 5 29th November 2006 08:33 AM
Rework vs. Inspection and Sort - What is considered rework? quest Misc. Quality Assurance and Business Systems Related Topics 19 2nd May 2006 08:43 AM
Rework by Inspectors - Pros and cons of a quality inspector also doing rework? RosieA Inspection, Prints (Drawings), Testing, Sampling and Related Topics 20 29th January 2005 06:41 PM



The time now is 04:51 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272