The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 20th February 2002, 03:31 PM
Mike48 Mike48 is offline
Getting Involved (6 to 9 Posts)

Registration Date: Jan 2002
Location: Colorado
 
Posts: 8
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 33
Karma: 10
Mike48 has less than 100 Karma points so far.
Question What does the APQP manual mean by the term 'Periodic Requirements'



What does the APQP manual mean by the term "periodic requirements" which control plans must address, as stated on page 33, paragraph 3, second sentence?
Reply With Quote

Sponsored Links
  #2  
Old 21st February 2002, 08:50 AM
JRKH's Avatar
JRKH JRKH is offline
Involved - Posts

Registration Date: Apr 2001
Location: Cincinnati, Ohio
Age: 54
 
Posts: 618
Thanks Given to Others: 57
Thanked 59 Times in 31 Posts
Karma Power: 95
Karma: 2397
JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.
Default

Mike48,

My read on this is that it would apply to issues such as shelf life.

The sentence is states that the control plan assures quality.... "at each phase of the process including receiving, in-process, outgoing, and periodic requirements to asure that all process outputs will be in a state of control."

Any product, that deteriorates over time would need to be periodically tested, lot controlled, etc. to assure bad product does not ship to the customer.

JMHO

James
__________________
Low tech is better than no tech.

The only constant is those who declare, "Things around here will never change!!"
Reply With Quote
Sponsored Links

  #3  
Old 30th March 2002, 05:55 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Default

Also consider the following under periodic requirements:

-Controlled Shipping
-GP-12
-Pending corrective action requirements
-Customer request for special run
-Customer request for special layout or SPC
-Temporary design record changes
-We all know that every now and again the customer will call and request something and we scratch our heads going why? But do it anyhow.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Periodic Evaluation of Legal Compliance - ISO 14001 - 4.5.2.1 - Legal Requirements tony wardle ISO 14001 and Environmental Related Standards 18 3rd July 2008 07:04 AM
Long Term vs. Accelerated Life Testing FDA Requirements RMPMAN ISO 13485 - Medical Devices - Quality Management Systems 2 19th October 2007 06:45 AM
Shall vs. Is - Don't use the term 'shall' in your quality manual JodiB ISO 10013 - Quality Management System (QMS) Manuals 42 27th February 2007 12:06 PM
Cpk vs. Ppk - Long Term vs. Short Term - Capability vs. Stability DJN Capability, Accuracy and Stability - Process, Machine, etc. 25 15th March 2006 01:26 AM
Capability: Short Term or Long Term? Cpk= Long term and Ppk= Short term? Andrews Capability, Accuracy and Stability - Process, Machine, etc. 15 22nd January 2004 04:28 PM



The time now is 10:31 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts